Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
HNP-16-095, Relief Request l3R-16, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspection Program, Third Ten-Year Interval, Non-Proprietary Version of Calculation21 October 2016Relief Request l3R-16, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspection Program, Third Ten-Year Interval, Non-Proprietary Version of CalculationNon-Destructive Examination
Hydrostatic
Finite Element Analysis
Stress corrosion cracking
ML15126A08218 March 2015Revision 0, EP-EALCALC-HNP-1401, Radiological Effluent EAL Values.Offsite Dose Calculation Manual
HNP-13-122, Relief Request I3R-13, Reactor Vessel Closure Head Nozzle 37, Lnservice Inspection Program- Third Ten-Year Interval Supporting Calculations25 November 2013Relief Request I3R-13, Reactor Vessel Closure Head Nozzle 37, Lnservice Inspection Program- Third Ten-Year Interval Supporting CalculationsBoric Acid
Non-Destructive Examination
Hydrostatic
Finite Element Analysis
Stress corrosion cracking
Exclusive Use
Affidavit
HNP-13-001, License Amendment Request to Revise Technical Specification Table 3.3-4 Degraded Voltage Time Delay Values Acceptance Review Supplement3 January 2013License Amendment Request to Revise Technical Specification Table 3.3-4 Degraded Voltage Time Delay Values Acceptance Review Supplement
ML11243A12216 February 2011Attachment 1, Response to Request for Additional Information Regarding License Amendment Request Measurement Uncertainty Recapture Power Uprate, HNP Calculation HNP-I/INST-1010, Rev. 4Boric Acid
Anticipated operational occurrence
Hydrostatic
Operability Determination
Grace period
Power Uprate
Measurement Uncertainty Recapture
Negative Flux Rate Trip
ML0702605167 February 2007January 24, 2007, Summary of Teleconference Regarding Shearon Harris Transition to NFPA 805Safe Shutdown
Multiple Spurious Operation
Fire Protection Program
ML0622004022 August 2006Request for License Amendment HNP Calculation HNP-I/INST-1010
ML0535403292 November 2005Calculation # HNP-F/PSA-0066, Rev 1, Risk Significance of ILRT Extension.Non-Destructive Examination
Probabilistic Risk Assessment
Coatings
Large early release frequency
Moisture barrier
HNP-09-014, Calculation HI-971760, Licensing Report for Expanding Storage Capacity in Harris Spent Fuel Pools C and D.22 December 2004Calculation HI-971760, Licensing Report for Expanding Storage Capacity in Harris Spent Fuel Pools C and D.High Radiation Area
Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Nondestructive Examination
Finite Element Analysis
Earthquake
Control of Heavy Loads
Fuel cladding
Liquid penetrant
Overexposure
Depleted uranium
Water rod
HNP-03-046, Off-Site Dose Calculation Manual, Revision 1612 December 2002Off-Site Dose Calculation Manual, Revision 16Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Power change
ML18230A83323 March 1977Testimony of Donald R. Hoover, Studies of Original Cost New Investment, Revenues, Expenses, & End-Of-Period Rates of Return Under Present & Company Proposed Rates