Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
L-23-087, Supplement to Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair (L-2023-LLA-0027)4 March 2023Supplement to Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair (L-2023-LLA-0027)Hydrostatic
FLEX
Weak link
ML22094A1154 April 2022Response to a Request for Additional Information Regarding a Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start and Bus Separation Instrumentation (EPID No. L-202Hot Short
Battery sizing
Weak link
L-17-126, ODCM: Index, Matrix and History of ODCM Changes7 November 2016ODCM: Index, Matrix and History of ODCM ChangesTime of Discovery
Grab sample
Offsite Dose Calculation Manual
Anticipated operational occurrence
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Power change
Power Uprate
ML16277A11929 March 20168700-SP-1RC-30, Instrument Uncertainty for Refueling Level Indicator LI-1RC-481C.
ML16277A12116 October 2015ERS-MPD-93-008, Rev. 8, BVPS - U2 Gaseous Radioactivity Monitor Emergency Action Levels.
L-16-125, ODCM: Index, Matrix and History of ODCM Changes11 February 2015ODCM: Index, Matrix and History of ODCM ChangesGrab sample
Offsite Dose Calculation Manual
Anticipated operational occurrence
Annual Radioactive Effluent Release Report
ML12124A10630 April 2012Offsite Dose Calculation Manual Changes, Enclosure 2, Attachment 2 and Radioactive Effluent Release Report, Enclosure 2, Attachment 3Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
ML0722500258 August 2007Responses to a Request for Additional Information (RAI) Dated July 3, 2007 in Support of License Amendment Request Nos. 334 and 205
ML16277A1257 April 200310080-DEC-0246, Rev. 0, Coping Duration for Station Blackout (Sbo).
ML16277A1207 April 20038700-DEC-0248, Coping Duration for Station Blackout (Sbo).Safe Shutdown