ST-HL-AE-5202, Forwards Rev 0,Suppl 1 to ISI Plan for First Insp Interval of South Tx Project Electric Generating Station Unit 1

From kanterella
(Redirected from ST-HL-AE-5202)
Jump to navigation Jump to search
Forwards Rev 0,Suppl 1 to ISI Plan for First Insp Interval of South Tx Project Electric Generating Station Unit 1
ML20093E723
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 10/10/1995
From: Thomas S
HOUSTON LIGHTING & POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20093E727 List:
References
ST-HL-AE-5202, NUDOCS 9510170056
Download: ML20093E723 (2)


Text

3

. The Light c o mp a n y South Texas Project Dectric &nerating Station P. O. Box 289 Mworth, Tem 77483 llouston Lighting & Power October 10, 1995 ST-HL-AE-5202 File No.: T1.01, T3.02 10CFR50.55a U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 South Texas Project Units I and 2 Docket Nos. STN 50-498; STN 50-499 Supplement to Inservice Inspection Plan for First inspection Interval Attached are four (4) copies of a supplement to the inservice inspection (ISI) plans entitled " Inservice Inspection Plan for the First Inspection Interval of the South Texas Project Electric Generating Station - Unit 1; Revision 0, Supplement 1" and " Inservice Inspection Plan for the First Inspection Interval of the South Texas Project Electric Generating Station -

Unit 2; Revision 0, Supplement 1". These supplements incorporate into the ISI plans ASME Nuclear Code Cases which were determined to be acceptable for use by the Nuclear Regulatory Commission in the current revision of Regulatory Guide 1.147 entitled " Inservice Inspection Code Case Acceptability - ASME Section XI Division 1".

If you should have any questions on this matter, please contact Mr. R. L. Beverly at (512) 972-8383 or me at (512) 972-7162.

S. E. Thomas Manager Design Engineering 1E0105 RLB/rlb Attachments: Inservice Inspection Plan for the First Inspection Interval of the South Texas

[(

Project Electric Generating Station - Unit 1; Revision 0, Supplement 1 Inservice Inspection Plan for the First Inspection Interval of the South Texas Ik Project Electric Generating Station - Unit 2; Revision 0, Supplement 1 Punject Manager on Behalf of the Participants in the South Texas Project msc-esssao2 9510170056 951010 PDR ADOCK 05000498 Q

PDR

a 3

Houston Lighting & Power Company ST-HL-AE-5202 South Texas Project Electric Generating Station File No.: T1.01, T3.02 Page 2 c:

  • Leonard J. Callan Rufus S. Scott Regional Administrator, Region IV' Associate General Counsel U. S. Nuclear Regulatory Commission Houston Lighting & Power Company 611 Ryan Plaza Drive, Suite 400 P. O. Box 61067 Arlington, TX 76011-8064 Houston, TX 77208 Thomas W. Alexion Institute of Nuclear Power Project Manager Operations - Records Center U. S. Nuclear Regulatory Commission 700 Galleria Parkway Washington, DC 20555-0001 13H15 Atlanta, GA 30339 5957 David P. Loveless Dr. Joseph M. Hendrie Sr. Resident inspector 50 Bellport Lane c/o U. S. Nuclear Regulatory Comm.

Bellport, NY l1713 P. O. Box 910 l

Bay City, TX 77404-0910 Richard A. Ratliff Bureau of Radiation Control l

J. R. Newman, Esquire Texas Department of Health

]

Morgan, Lewis & Bockius 1100 West 49th Street 1800 M Street, N.W.

Austin, TX 78756-3189 Washington, DC 20036-5869 U. S. Nuclear Regulatory Comm.

K. J. Fiedler/M. T. Hardt Attn: Document Control Desk City Public Service Washington, D. C. 20555-0001 P. O. Box 1771 San Antonio, TX 78296 J. C. Lanier/M. B. Lee J. R. Egan, Esquire City of Austin Egan & Associates, P.C.

Electric Utility Department 2300 N Street, N.W.

721 Barton Springs Road Washington, D.C. 20037 Austin, TX 78704 Central Power and Light Company J. W. Beck ATTN: G. E. Vaughn/C. A. Johnson Little Harbor Consultants, Inc.

P. O.. Box 289, Mail Code: N5012 44 Nichols Road Wadsworth, TX 77483 Cohassett, MA 02025-1166 Above copies distributed without Attachment except as noted by asterisk