ST-HL-AE-5009, Inadequate Calibr of Pressurizer Level Channel
| ML20081B507 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 03/09/1995 |
| From: | Groth J HOUSTON LIGHTING & POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20081B509 | List:
|
| References | |
| ST-HL-AE-5009, NUDOCS 9503160222 | |
| Download: ML20081B507 (2) | |
Text
.
- S...
The Light companySouth exas rject lectric nerat og Station P. O. Box 289 Wadsworth, Texas 77483 Houston Lighting & Power J
March 9, 1995 ST-HL-AE-5009 File No.: G26 10CFR50.73 L
U. S. Nuclear Regulatory Commission Attention: Document Control Desk
+
Washington, DC 20555 South Texas Project Unit 2 Docket No. STN 50-499 Licensee Event Report 95-002 Incorrect Application of Static Shift to Pressurizer Level Channel LT-0467 Pursuant to 10CFR50.73, Houston Lighting & Power Company submits the attached Unit 2 Licensee Event Report 95-002 regarding inadequate calibration of a pressurizer level channel. This event did not have an adverse effect on the health and safety of the public but clearly does not meet the standards for expected operational performance.
On March 2,1995, an extension of the due date of this letter to March 9,1995, was requested and granted by Bill Johnson of NRC Region IV.
If you should have any questions on this matter, please contact Mr. P. L. Walker at (512) 972-8392 or me et (512) 972-8664.
O 3
l l
J. F. Gr th Vice President, Nuclear Generation PLW/lf
Attachment:
LER 95-002 (South Texas, Unit 2) t 9503160222 950309 Ie' PDR ADOCK 05000499
/[p S
/
t.ER-95\\L95-002-R0.U2 Project Manager on Behalf of the Participants in the South Texas Project
/
g
)
L
]
m y
[i ' '
} :.
&a, l
i y
. Houston Lighting & Power Company
~ ST-HL-AE-5009 4
4
. South Texas Project Electric Generating Station.
File No.: G26.
Page 2.
Lc
- Leonard J. Callan Rufus S. Scott-
. Regional Administrator, Region IV Associate General Counsel
'U. S. Nuclear Regulatory Commission -
Houston Lighting & Power Companyj 611 Ryan Plaza Drive, Suite 400 P. O. Box 61067
Arlington, TX :76011-8064-
. Houston, TX 77208 '
'l t
- Thomas W. Alexion Institute of Nuclear Power '
Project Manager -
Operations - Records Center
)
U. S. Nuclear Regulatory Commission 700 Galleria Parkway.-
Washington, DC' 20555-0001 13H15 Atlanta, GA - 30339-5957 l
David P. Loveless
- Dr. Joseph M. Hendrie l
Sr. Resident Inspector 50 Bellport Lane c/o U. S. Nuclear Regulatory Comm.
Bellport, NY l1713
' P. O ' Box 910 l
- Bay City, TX l 77404-0910-Richard A. Ratliff Bureau of Radiation Control J. R.: Newman, Esquire -
Texas Department of Health Morgan, Lewis & Bockius 1100. West 49th Street I800 M Street,' N.W.-
Austin, TX 78756-3189-j Washington, DC 20036-5869 i
U. S. Nuclear Regulatory' Comm.
K. J. Fiedler/M. T. Hardt Attn: Document Control Desk City Public Service.
~ Washington, D. C. 20555-0001
- P. O. Box 1771-l
- San ~ Antonio, TX 78296
- J. C. Lanier/M. B. Lee
- J. R; Egan, Esquire.
City of Austini Egan & Associates, P.C.-
1 Electric Utility Department 2300 N Street, N.W.
L 721 Barton Springs Road Washington, D.C. 20037 Austin,-TX 78704 -
- G. E. Vaughn/C. A. Johnson Central Power and Light Company
- P. O. Box 2121 g
L Corpus Christi, TX 78403 1
i i
i
)
.