ST-HL-AE-1476, Forwards Response to Draft SER Item D 6.3-3 Re ECCS Testing

From kanterella
Jump to navigation Jump to search
Forwards Response to Draft SER Item D 6.3-3 Re ECCS Testing
ML20138R965
Person / Time
Site: South Texas  
Issue date: 10/31/1985
From: Wisenburg M
HOUSTON LIGHTING & POWER CO.
To: Knighton G
Office of Nuclear Reactor Regulation
References
CON-#485-044, CON-#485-44 OL, ST-HL-AE-1476, NUDOCS 8511190317
Download: ML20138R965 (3)


Text

y O

The Light NE f flouston 1.ighting & Power P.O. Box 1700 llouston, Texas 77001 (713)228-9211

_=_

October 31, 1985 ST-HL-AE-1476 File No.: G 9.17 Mr. George W. Knighton, Chief Licensing Branch No. 3 Division of Licensing U.S. Nuclear Regulatory Comission Washington, DC 20555 South Texas Project Units 1 & 2 Docket Nos. STN 50-498, STN 50-499 Response to DSER Open Item ECCS Testing

Dear Mr. Knighton:

The attachment enclosed provides STP's response to a Draft Safety Evaluation Report (DSER) item.

The item number listed below corresponds to those assigned on STP's internal list of items for completion which includes open and confirmatory DSER items, STP FSAR open items and open NRC questions. This list was given to your Mr. N. Prasad Kadambi on October 8,1985 by our Mr. M. E. Powell.

The item attached to this letter is:

Attachment Item No.*

Subject 6

D[.3-3 Section 6.3.4.2 ECCS Testing 1

If you should have any questions on this matter, please contact Mr. Mark A. McBurnett at (512)972-8530.

Very trply @ours, ()

[!Ldl pb g11{0

{gjgs M. R.

isen urg E

PDR Manager, Nuclear Licen ing MAM/bjf

Attachment:

See Above

  • Legend D - DSER Open Item C - DSER Confirmatory Item F - FSAR Open Item Q - FSAR Question Response Item I

58/NRC1/d

4

.9 ST-HL-AE-1476 File No.: G 9.17 Houston Lighting & Power Company Page 2 cc:

Hugh L. Thompson, Jr., Director Brian E. Berwick, Esquire Division of Licensing Assistant Attorney General for Office of Nuclear Reactor Regulation the State of Texas U.S. Nuclear Regulatory Comission P.O. Box 12548, Capitol Station Washington, DC 20555 Austin, TX 78711 Robert D. Martin Lanny A. Sinkin Regional Administrator, Region IV 3022 Porter Street, N.W. #304 Nuclear Regulatory Comission Washington, DC 20555 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 Oreste R. Pirfo, Esquire Hearing Attorney N. Prasad Kadambi, Project Manager Office of the Executive Legal Director U.S. Nuclear Regulatory Comission U.S. Nuclear Regulatory Comission 7920 Norfolk Avenue Washington, DC 20555 Bethesda, MD 20814 Charles Bechhoefer, Esquire Claude E.. Johnson Chairman, Atomic Safety &

Senior Resident Inspector /STP Licensing Board c/o U.S. Nuclear Regulatory Comission U.S. Nuclear Regulatory Comission P.O. Box 910 Washington, DC 20555 Bay City, TX 77414 Dr. James C. Lamb, III M.D. Schwarz, Jr., Esquire 313 Woodhaven Road Baker & Botts Chapel Hill, NC 27514 One Shell Plaza Houston, TX 77002 Judge Frederick J. Shon Atomic Safety and Licensing Board J.R. Newman, Esquire U.S. Nuclear Regulatory Comission Newman & Holtzinger, P.C.

Washington, DC 20555 1615 L Street, N.W.

Washington, DC 20555 Mr. Ray Goldstein, Esquire 1001 Vaughn Building Director, Office of Inspection 807 Brazos and Enforcement Austin, TX 78701 U.S. Nuclear Regulatory Comission Washington, DC 20555 Citizens for Equitable Utilities, Inc.

c/o Ms. Peggy Buchorn E.R. Brooks /R.L. Range Route 1, Box 1684 Central Power & Light Company Brazoria, TX 77422 P.O. Box 2121 Corpus Christi, TX 78403 Docketing & Service Section Office of the Secretary

.H.L. Peterson/G. Pokorny U.S. Nuclear Regulatory Commission City of Austin Washington, DC 20555 P.O. Box 1088 (3 copies)

Austin, TX 78767

  • Advisory Comittee on Reactor Safeguards J.B. Poston/A. vonRosenberg U.S. Nuclear Regulatory Comission City Public Service Board 1717 H Street P.O. Box 1771 Washington, DC 20555 San Antonio, TX 78296 S8/NRC1/d Revised 9/25/85

4

'6

) -

ST-HL-AE-1476 Page 1 of I DSER Confirmatory Item 6.3-3 Plant Tech Specs shall permit testing of the operability of ECCS throughout the life of the plant, including the full operational sequence that brings the system into operation (6.3.6).

Response

I This is covered by STPEGS Technical Specification 3/4.5.2. The STPEGS Technical Specifications were submitted to NRC by letter dated June 17, 1985 (ST-HL-AE-1271).

4

~

k 1

k i

t 3

S8/NRC1/d

- - _ _ - -