SECY-12-0092, SRM-SECY-12-0092 - State-of-the-Art Reactor Consequence Analyses (Soarca) - Recommendation for Limited Additional Analysis

From kanterella
(Redirected from SECY-12-0092)
Jump to navigation Jump to search
SRM-SECY-12-0092 - State-of-the-Art Reactor Consequence Analyses (Soarca) - Recommendation for Limited Additional Analysis
ML12341A349
Person / Time
Site: Peach Bottom, Sequoyah, Surry  Constellation icon.png
Issue date: 12/06/2012
From: Annette Vietti-Cook
NRC/SECY
To: Borchardt R
NRC/EDO
References
SECY-12-0092 SRM-SECY-12-0092
Download: ML12341A349 (1)


Text

December 6, 2012 MEMORANDUM TO:

R. W. Borchardt Executive Director for Operations FROM:

Annette L. Vietti-Cook, Secretary

/RA/

SUBJECT:

STAFF REQUIREMENTS - SECY-12-0092 - STATE-OF-THE-ART REACTOR CONSEQUENCE ANALYSES (SOARCA) -

RECOMMENDATION FOR LIMITED ADDITIONAL ANALYSIS The Commission has approved the NRC staffs recommendation for the limited continuation of the SOARCA project for the purposes of (1) conducting a severe accident consequence analysis of a station blackout event at a pressurized water reactor with an ice condenser containment (Sequoyah) based on the insights from the Peach Bottom and Surry analyses and (2) conducting an uncertainty analysis for a severe accident scenario at Surry. The ongoing SOARCA studies should be conducted in a way that complements and supports the higher priority Level 3 PRA project to develop a comprehensive risk profile that models multi-unit sites and spent fuel storage facilities as well as external events.

Priority for future SOARCA work should be put on the performance of an uncertainty analysis for Surry.

Additionally, the ongoing SOARCA studies should be conducted in a way that complements and supports the post-Fukushima activities including Tier 3 items.

The staff should provide the Commission an information paper on its complete review of lessons learned and analyses with regard to use of codes during the Fukushima event and explain in detail how this performance obviates the need for the rapid analysis tool described in SECY 0233.

The staff should seek Commission direction if SOARCA project resource conflicts emerge that negatively affects the higher priority post-Fukushima actions or the Level 3 PRA project.

cc:

Chairman Macfarlane Commissioner Svinicki Commissioner Apostolakis Commissioner Magwood Commissioner Ostendorff OGC CFO OCA OPA Office Directors, Regions, ACRS, ASLBP (via E-Mail)