Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations
ML24269A252
Person / Time
Site: Ginna 
Issue date: 09/25/2024
From: Humphrey M
Constellation Energy Generation
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
RS-24-092
Download: ML24269A252 (1)


Text

4300 Winfield Road Warrenville, IL 60555 630 657 2000 Office RS-24-092 September , 2024 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 R.E. Ginna Nuclear Power Plant Renewed Facility Operating License No. DPR-18 NRC Docket No. 50-244

Subject:

Revised Response to NRC Regulatory Issue Summary 2024-01, "Preparation and Scheduling of Operator Licensing Examinations" for R.E. Ginna Nuclear Power Plant

Reference:

Letter from M. D. Humphrey (Constellation Energy Generation, LLC) to U.S.

NRC, "Response to NRC Regulatory Issue Summary 2024-01, 'Preparation and Scheduling of Operator Licensing Examinations'" dated Jun 14, 2024 In the referenced letter, Constellation Energy Generation, LLC (CEG) submitted NRC Form 536, "Operating License Examination Data" for all its sites to respond to NRC Regulatory Issue Summary 2024-01, "Preparation and Scheduling of Operator Licensing Examinations," dated March 5, 2024. This letter contains an enclosure with a revised NRC Form 536 for R.E. Ginna Nuclear Power Plant.

There are no regulatory commitments contained within this letter. Should you have any questions regarding this letter, please contact Nick Lien at 779-231-6283 Respectfully, Mark D. Humphrey Sr. Manager Licensing Constellation Energy Generation, LLC

Enclosure:

Revised NRC Form 536 for R.E. Ginna Nuclear Power Plant cc:

NRC Regional Administrator, Region I

Humphrey, Mark D.

Digitally signed by Humphrey, Mark D.

Date: 2024.09.25 13:55:32 -05'00'

ENCLOSURE:

Revised NRC Form 536 for R.E. Ginna Nuclear Power Plant

NRC FORM 536 (01-16-2024)

U. S. NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING EXAMINATION DATA APPROVED BY OMB: NO. 3150-0131 EXPIRES: 01/31/2027 Estimated burden per response to comply with this voluntary information collection request: 45 minutes.

This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the FOIA, Library, and Information Collections Branch (T-6 A10M), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by email to Infocollects.Resource@nrc.gov, and the OMB reviewer at: OMB Office of Information and Regulatory Affairs, (3150-0131), Attn: Desk Officer for the Nuclear Regulatory Commission, 725 17th Street NW, Washington, DC 20503; email:

oira_submission@omb.eop.gov. The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless the document requesting or requiring the collection displays a currently valid OMB control number.

FACILITY NRC REGION A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE ALTERNATE DATE CY CY CY CY CY CY CY NRC FORM 536 (01-16-2024)

R. E. Ginna Nuclear Power Plant Renewed Facility Operating License No. DPR-18 1

2025 1

0 2026 1

0 2027 1

0 2028 0

0 2025 2

7 1

0 11/03/2025 12/08/2025 2026 6

6 3

0 12/07/2026 01/04/2027 2027 4

4 3

0 08/09/2027 09/13/2027 2028 0

0 0

0 N/A N/A