MONTHYEARRS-16-191, License Amendment Request to Revise Technical Specifications 5.5.13, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2016-10-26026 October 2016 License Amendment Request to Revise Technical Specifications 5.5.13, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies Project stage: Request ML16350A0742016-12-15015 December 2016 Acceptance for Review of Application Concerning Extension of Type a and Type C Leak Rate Test Frequencies Project stage: Acceptance Review RS-17-024, Supplement to License Amendment Request for Permanent Extension of Type a and Type C Leak Rate Test Frequencies Regarding Hardened Containment Vent System Modifications and Installation of Primary Containment Isolation Valves2017-02-16016 February 2017 Supplement to License Amendment Request for Permanent Extension of Type a and Type C Leak Rate Test Frequencies Regarding Hardened Containment Vent System Modifications and Installation of Primary Containment Isolation Valves Project stage: Supplement ML17151A3822017-06-0505 June 2017 Request for Additional Information Regarding License Amendment Request for Extension of Type a and Type C Leak Rate Test Frequencies Project stage: RAI ML17164A1152017-06-15015 June 2017 Request for Additional Information Regarding License Amendment Request for Extension of Type a and Type C Leak Rate Test Frequencies Project stage: RAI RS-17-098, Response to Request for Additional Information Regarding License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals (Sbpb Branch)2017-07-17017 July 2017 Response to Request for Additional Information Regarding License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals (Sbpb Branch) Project stage: Response to RAI RS-17-099, Response to Request for Additional Information Regarding LaSalle County Station License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals (PRA Branch)2017-08-0808 August 2017 Response to Request for Additional Information Regarding LaSalle County Station License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals (PRA Branch) Project stage: Response to RAI RS-17-131, Supplemental Information Regarding LaSalle County Station License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals2017-09-27027 September 2017 Supplemental Information Regarding LaSalle County Station License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals Project stage: Supplement RS-17-133, Additional Supplemental Information Regarding LaSalle County Station License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals2017-10-0303 October 2017 Additional Supplemental Information Regarding LaSalle County Station License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals Project stage: Supplement RS-17-157, Supplemental Information Regarding the Third Interval Containment Inservice Inspection (Cisi) Schedule for LaSalle County Station License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals2017-11-0808 November 2017 Supplemental Information Regarding the Third Interval Containment Inservice Inspection (Cisi) Schedule for LaSalle County Station License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals Project stage: Supplement ML17283A0852017-11-16016 November 2017 Issuance of Amendment Nos. 226 and 212 - Revise Technical Specification 5.5.13, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Leak Rate Test Frequencies (CAC MF8700 and MF8701; L-2016-LLA-0021) Project stage: Approval 2017-02-16
[Table View] |
|
---|
Category:Letter type:RS
MONTHYEARRS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds RS-24-064, Nuclear Radiological Emergency Plan Document Revisions2024-06-28028 June 2024 Nuclear Radiological Emergency Plan Document Revisions RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report RS-24-014, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2024-02-22022 February 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-23-120, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information RS-23-103, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-13013 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor RS-23-084, Response to Request for Additional Information Regarding the Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis2023-07-24024 July 2023 Response to Request for Additional Information Regarding the Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations RS-23-048, Exigent Amendment Request to Revise Design Basis Related to Seismic Requirements2023-03-0707 March 2023 Exigent Amendment Request to Revise Design Basis Related to Seismic Requirements RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 RS-23-037, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station2023-02-22022 February 2023 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 RS-22-085, Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis2023-01-12012 January 2023 Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis RS-23-006, Supplemental Information Regarding License Amendment Request Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report2023-01-10010 January 2023 Supplemental Information Regarding License Amendment Request Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report RS-22-126, Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2022-11-30030 November 2022 Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI RS-22-109, Response to Request for Additional Information License Amendments Related to Fuel Storage2022-10-12012 October 2022 Response to Request for Additional Information License Amendments Related to Fuel Storage RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration RS-22-093, Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans2022-08-18018 August 2022 Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans RS-22-083, Response to Request for Additional Information Related to the License Amendment Request to Change New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical2022-06-17017 June 2022 Response to Request for Additional Information Related to the License Amendment Request to Change New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical RS-22-051, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-04-12012 April 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-049, Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for2022-04-0404 April 2022 Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for V RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations RS-22-035, Supplemental Information Regarding Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs2022-03-0404 March 2022 Supplemental Information Regarding Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs RS-22-033, Response to Request for Additional Information Regarding Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs2022-03-0303 March 2022 Response to Request for Additional Information Regarding Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs RS-22-032, Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs2022-03-0202 March 2022 Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs RS-22-023, Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement2022-02-23023 February 2022 Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement RS-22-027, Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated2022-02-23023 February 2022 Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated P RS-22-018, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station2022-02-22022 February 2022 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station RS-22-019, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-02-16016 February 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-015, Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC2022-02-0101 February 2022 Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC RS-22-004, Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-01-0404 January 2022 Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RS-21-121, Proposed Changes to Decommissioning Trust Agreements and Master Terms2021-12-15015 December 2021 Proposed Changes to Decommissioning Trust Agreements and Master Terms RS-21-115, Supplemental Information for License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical Specifications 4.3.1 and 5.6.52021-11-0404 November 2021 Supplemental Information for License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical Specifications 4.3.1 and 5.6.5 RS-21-109, Request to Withhold Meeting Materials for the Non-Public Meeting Held on September 2, 20212021-10-14014 October 2021 Request to Withhold Meeting Materials for the Non-Public Meeting Held on September 2, 2021 RS-21-091, Implementation of Insider Threat Program Requirements Associated with the Voluntary Security Clearance Program and Advisement of Leadership Changes2021-09-13013 September 2021 Implementation of Insider Threat Program Requirements Associated with the Voluntary Security Clearance Program and Advisement of Leadership Changes RS-21-078, Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel2021-08-19019 August 2021 Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel RS-21-085, Response to Request for Additional Information Regarding License Amendment Request to Incorporate Licensing Topical Report NEDE-33885PA, Revision 1, GNF CRDA Application Methodology (EPID-L-2021-LLA-0016)2021-08-17017 August 2021 Response to Request for Additional Information Regarding License Amendment Request to Incorporate Licensing Topical Report NEDE-33885PA, Revision 1, GNF CRDA Application Methodology (EPID-L-2021-LLA-0016) RS-21-070, Proposed Alternative to Utilize Code Case N-8932021-06-30030 June 2021 Proposed Alternative to Utilize Code Case N-893 RS-21-063, Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2021-06-30030 June 2021 Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RS-21-064, License Amendment Request Re New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies - Cover Letter2021-06-30030 June 2021 License Amendment Request Re New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies - Cover Letter 2024-09-12
[Table view] |
Text
AdEMW 4300 Winfield Road lamoulow Warrenville, IL 60555 ExeLon G 630 657 2000 Office RS-17-024 10 CFR 50.90 February 16, 2017 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 LaSalle County Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374
Subject:
Supplement to License Amendment Request for Permanent Extension of Type A and Type C Leak Rate Test Frequencies Regarding Hardened Containment Vent System (HCVS) Modifications and Installation of Primary Containment Isolation Valves (PCIVs)
References:
- 1) Letter from D. M. Gullott (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission, "License Amendment Request to Revise Technical Specifications 5.5.13, "Primary Containment Leakage Rate Testing Program,"
for Permanent Extension of Type A and Type C Leak Rate Test Frequencies,"
dated October 26, 2016 (ADAMS Accession No. ML16300A200)
- 2) EA-13-109, "Issuance of Order to Modify Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation under Severe Accident Conditions," dated June 6, 2013 (ADAMS Accession No. ML13143A321)
In Reference 1, Exelon Generation Company, LLC (EGC) requested an amendment to Renewed Facility Operating License Nos. NPF-11 and NPF-18 for LaSalle County Station (LSCS), Units 1 and 2. The proposed change revises Technical Specifications 5.5.13, "Primary Containment Leakage Rate Testing Program," to allow for the permanent extension of the Type A Integrated Leak Rate Testing (ILRT) and Type C Leak Rate Testing frequencies.
In Reference 2, the NRC issued Order EA-13-109. In response to Order EA-13-109, EGC is taking certain actions to ensure that its BWRs with Mark I and Mark II containments have a hardened containment vent system (HCVS) to remove decay heat from the containment and maintain control of containment pressure within acceptable limits following events that result in loss of active containment heat removal capability while maintaining the capability to operate under severe accident conditions resulting from an Extended Loss of AC Power.
As part of the HCVS modifications, two new primary containment isolation valves (PCIVs) will be installed on each LSCS unit. These installed PCIVs will be added to the 10 CFR 50 Appendix J program. The Unit 2 PCIVs associated with the spring 2017 refueling outage (L2R16) HCVS modification are installed on LSCS, Unit 2, but not yet operable. The PCIVs associated with the Unit 1 HCVS modification are scheduled to be installed at LSCS, Unit 1, in the spring 2018
February 16, 2017 U.S. Nuclear Regulatory Commission Page 2 refueling outage (1-1 R17). The information regarding the PCIV installation was not known at the time of submittal of Reference 1.
The Attachment to this letter provides information regarding the LSCS, Unit 1 and Unit 2, HCVS modifications and installation of the PCIVs.
EGC has reviewed the information supporting a finding of no significant hazards consideration that was previously provided to the NRC in Attachment 1 of Reference 1. The additional information provided in this submittal does not affect the bases for concluding that the proposed license amendments do not involve a significant hazards consideration.
There are no regulatory commitments contained within in this letter. Should you have any questions concerning this letter, please contact Ms. Lisa A. Simpson at (630) 657-2815.
Respectfully, David M. Gullott Manager Licensing Exelon Generation Company, LLC
Attachment:
Supplement Regarding Hardened Containment Vent System (HCVS) Modifications and Installation of Primary Containment Isolation Valves (PCIVs) cc: NRC Regional Administrator, Region III NRC Senior Resident Inspector, LaSalle County Station
ATTACHMENT Supplement Regarding Hardened Containment Vent System (HCVS) Modifications and Installation of Primary Containment Isolation Valves (PCIVs)
On October 26, 2016, Exelon Generation Company, LLC (EGC) requested an amendment to Renewed Facility Operating License Nos. NPF-11 and NPF-18 for LaSalle County Station (LSCS), Units 1 and 2 (Reference 1). The proposed change revises Technical Specifications (TS) 5.5.13, "Primary Containment Leakage Rate Testing Program," to allow for the permanent extension of the Type A Integrated Leak Rate Testing (ILRT) and Type C Leak Rate Testing frequencies.
On June 6, 2013, the U.S. Nuclear Regulatory Commission (NRC) issued Order EA-13-109, "Issuance of Order to Modify Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation under Severe Accident Conditions," to all operating Boiling Water Reactor (BWR) Licensees with Mark I and Mark II containments (Reference 2). The Order directed EGC to require its BWRs with Mark I and Mark II containments to take certain actions to ensure that these facilities have a hardened containment vent system (HCVS) to remove decay heat from the containment and maintain control of containment pressure within acceptable limits following events that result in loss of active containment heat removal capability. The HCVS must be capable of operation under severe accident (SA) conditions resulting from an Extended Loss of AC Power (ELAP).
The Order requirements are applied in a phased approach where:
"Phase 1 involves upgrading the venting capabilities from the containment wetwell to provide reliable, severe accident capable hardened vents to assist in preventing core damage and, if necessary, to provide venting capability during severe accident conditions". (Completed "no later than startup from the second refueling outage that begins after June 30, 2014, or June 30, 2018, whichever comes first.") These modifications make changes to the LSCS Containment Leakage Rate Testing Program and are described below.
"Phase 2 involves providing additional protections for severe accident conditions through installation of a reliable, severe accident capable drywell vent system or the development of a reliable containment venting strategy that makes it unlikely that a licensee would need to vent from the containment drywell during severe accident conditions." (Completed "no later than startup from the first refueling outage that begins after June 30, 2017, or June 30, 2019, whichever comes first.") Phase 2 actions do not involve the LSCS containment structure or Containment Leakage Rate Testing Program and will not be discussed further in this supplement.
LSCS venting actions for the EA-13-109 severe accident capable venting scenario can be summarized by the following:
- The HCVS will be initiated via manual action from the Main Control Room (MCR) or Remote Operating Station (ROS) at the appropriate time based on procedural guidance in response to plant conditions from observed or derived symptoms.
- The vent will utilize Containment Parameters of Pressure and Wetwell Level from the MCR instrumentation to monitor effectiveness of the venting actions.
Page 1 of 3
ATTACHMENT Supplement Regarding Hardened Containment Vent System (HCVS) Modifications and Installation of Primary Containment Isolation Valves (PCIVs)
- The vent operation will be monitored by HCVS Primary Containment Isolation Valve (PCIV) position, vent line temperature, and effluent radiation levels.
The PCIVs are fail-closed air-operated valves (AOVs) (gas-to-open, spring to close),
whose motive force will be provided by compressed nitrogen with enough installed capacity to operate for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Replenishment will be by use of portable equipment once the installed capacity is exhausted.
Venting actions will be capable of being maintained for a sustained period of up to 7 days.
An Engineering Change was processed to add a HCVS to LSCS, Units 1 and 2. The HCVS will provide a means to remove decay heat and maintain control of containment pressure within acceptable limits following events that result in loss of active containment heat removal capability or ELAP. The HCVS will have two Primary Containment Isolation Valves (PCIVs) and a rupture disc to maintain Secondary Containment. An argon purge system will be used after each vent cycle to ensure that a combustible mixture of hydrogen and oxygen is not present in the HCVS vent line.
The HCVS is designed to allow pressure testing of the piping, stroke testing of all AOVs, leak testing of the PCIVs and testing of system operation. The HCVS instrumentation is located within accessible areas of the Reactor Building and Auxiliary Building to allow for surveillance testing, calibration, and maintenance.
The HCVS modifications will install two new PCIVs for each unit at LSCS (i.e., 1 PC009A and 1 PC010A for Unit 1; 2PC009A and 2PC010A for Unit 2). The guidance contained within Section 6.2 of NEI 13-02, Revision 1, "Industry Guidance for Compliance with Order EA-13-109," (Reference 3) indicates that primary and secondary containment required leakage testing is covered under existing design basis testing programs. Therefore, the installed PCIVs will be added to the 10 CFR 50 Appendix J program and are to be leak tested in accordance with the existing criteria for 10 CFR 50 Appendix J.
The design basis temperature and pressure of the new HCVS piping up to and including the PCIVs is the same as the 24-inch vacuum breaker piping to which it connects. The existing criteria for the test pressure are based on the peak calculated containment internal pressure for the design basis loss of coolant accident (Pa), which is 42.6 psig. This value is documented in the LSCS TS 5.5.13, "Primary Containment Leakage Rate Testing Program." Even though the design pressure of the HCVS outboard of the PCIVs is based on the Primary Containment Pressure Limit (PCPL) of 60 psig, leak rate testing of the PCIVs is not required at this higher pressure per generic assumption 049-13 of HCVS-FAQ-06 (attached to NEI 13-02, Revision 1 Reference 3). By extension, the initial and ongoing pressure tests required by the Section XI inservice inspection (ISI) program are also limited to the existing criteria based on design basis requirements.
Page 2 of 3
ATTACHMENT Supplement Regarding Hardened Containment Vent System (HCVS) Modifications and Installation of Primary Containment Isolation Valves (PCIVs)
The PCIVs associated with the Unit 2 spring 2017 refueling outage (L2R16) HCVS modification are installed on LSCS, Unit 2, but are not yet operable. The PCIVs associated with the Unit 1 HCVS modification are scheduled to be installed on LSCS, Unit 1, in the spring 2018 refueling outage (1-1 R17). The PCIVs will be operable and will be added to the 10 CFR 50 Appendix J program by the conclusions of L2R16 and L1 R17, respectively.
The information regarding the PCIV installation was not known at the time of submittal of Reference 1.
The HCVS modification is expected to lower Core Damage Frequency (CDF) and lead to greater margins to risk metric thresholds. The HCVS method of heat removal is not credited in the Unit 1 and Unit 2 LSCS PRA models used to calculate ILRT extension risk metrics. A 2015 application specific LSCS PRA model was created to estimate the CDF impact of the HCVS modification. There was a meaningful reduction in CDF. Based on the risk analysis performed in 2015, it is expected that ILRT risk metric margins would increase.
References:
- 1) Letter from D. M. Gullott (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission, "License Amendment Request to Revise Technical Specifications 5.5.13, "Primary Containment Leakage Rate Testing Program," for Permanent Extension of Type A and Type C Leak Rate Test Frequencies," dated October 26, 2016 (ADAMS Accession No. ML16300A200)
- 2) EA-13-109, "Issuance of Order to Modify Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation under Severe Accident Conditions," dated June 6, 2013 (ADAMS Accession No. ML13143A321)
- 3) NEI 13-02, Revision 1, "Transmittal of NEI 13-02, Industry Guidance for Compliance with Order EA-13-109, Revision 1," dated April 2015 (ADAMS Accession No. ML1511313318)
Page 3 of 3