Letter Sequence Response to RAI |
---|
TAC:MD5286, Control Room Habitability (Approved, Closed) |
|
|
Response to Request for Additional Information, Exelon/Amergen Application to Revise Technical Specifications Control Room Envelope Habitability in Accordance with TSTF-448, Rev. 3, Using..ML080300012 |
Person / Time |
---|
Site: |
Three Mile Island, Quad Cities |
---|
Issue date: |
01/18/2008 |
---|
From: |
Cowan P AmerGen Energy Co, Exelon Generation Co, Exelon Nuclear |
---|
To: |
Document Control Desk, Office of Nuclear Reactor Regulation |
---|
References |
---|
5928-08-20018, RS-08-004, TSTF-448, Rev 3 |
Download: ML080300012 (7) |
|
|
---|
Category:Letter type:RS
MONTHYEARRS-24-097, Notice of Intent to Pursue Subsequent License Renewal for Three Mile Island Nuclear Station, Unit 12024-10-23023 October 2024 Notice of Intent to Pursue Subsequent License Renewal for Three Mile Island Nuclear Station, Unit 1 RS-24-080, Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in .2024-10-16016 October 2024 Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in . RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests RS-24-078, Alternative Request RV-08, Revision 1, Associated with Safety Relief Valve Testing Interval2024-08-20020 August 2024 Alternative Request RV-08, Revision 1, Associated with Safety Relief Valve Testing Interval RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations RS-24-053, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed2024-06-0606 June 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report RS-24-042, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion2024-05-10010 May 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion RS-24-046, 10 CFR 50.46 Annual Report2024-05-0606 May 2024 10 CFR 50.46 Annual Report RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests RS-24-032, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion2024-04-0505 April 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report RS-24-023, Report on Status of Decommissioning Funding.2024-03-22022 March 2024 Report on Status of Decommissioning Funding. RS-24-019, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Completion Times TSTF2024-03-19019 March 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Completion Times TSTF RS-24-020, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for Quad Cities Nuclear Power Station - Holtec MPC-68MCBS2024-03-15015 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for Quad Cities Nuclear Power Station - Holtec MPC-68MCBS RS-24-015, Submittal of RP-01 Relief Request Associated with the Sixth Inservice Testing Interval2024-02-29029 February 2024 Submittal of RP-01 Relief Request Associated with the Sixth Inservice Testing Interval RS-24-001, Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2024-01-0303 January 2024 Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval RS-23-128, Response to Request for Additional Information for the Emergency License Amendment Request – Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days2023-12-15015 December 2023 Response to Request for Additional Information for the Emergency License Amendment Request – Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days RS-23-123, Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days2023-12-13013 December 2023 Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days RS-23-104, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-113, Submittal of Updated Final Safety Analysis Report (Ufsar), Revision 17 and Fire Protection Report (Fpr), Revision 262023-10-20020 October 2023 Submittal of Updated Final Safety Analysis Report (Ufsar), Revision 17 and Fire Protection Report (Fpr), Revision 26 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-089, Sixth Ten-Year Interval Inservice Testing Program2023-09-0505 September 2023 Sixth Ten-Year Interval Inservice Testing Program RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs RS-23-086, Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2023-08-28028 August 2023 Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-060, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors2023-06-0808 June 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors RS-23-059, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0808 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling RS-22-067, 10 CFR 50.46 Annual Report2023-05-0404 May 2023 10 CFR 50.46 Annual Report RS-23-068, Response to Request for Additional Information for Quad Cities Relief Request I6R-11, Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell2023-04-28028 April 2023 Response to Request for Additional Information for Quad Cities Relief Request I6R-11, Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell RS-23-058, Submittal of Sixth Inservice Inspection Interval Relief Request I6R-11 Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell Flanges2023-04-24024 April 2023 Submittal of Sixth Inservice Inspection Interval Relief Request I6R-11 Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell Flanges RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations RS-23-007, Application to Adopt TSTF-564, Safety Limit MCPR2023-03-0303 March 2023 Application to Adopt TSTF-564, Safety Limit MCPR RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 RS-23-032, Application to Move SR 3.5.1.2 Note to LCO 3.5.1 in Accordance with TSTF-416, LPCI Valve Alignment Verification Note Location2023-02-0303 February 2023 Application to Move SR 3.5.1.2 Note to LCO 3.5.1 in Accordance with TSTF-416, LPCI Valve Alignment Verification Note Location RS-23-034, Notification of Extension to the Fifth Ten-Year Interval of the Inservice Testing Program2023-02-0202 February 2023 Notification of Extension to the Fifth Ten-Year Interval of the Inservice Testing Program RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 RS-23-033, Request for Exemption from 10 CFR 2.109(b)2023-01-27027 January 2023 Request for Exemption from 10 CFR 2.109(b) RS-23-005, Response to Request for Additional Information for Quad Cities Relief Request RV-04, Inservice Testing of High Pressure Coolant Injection Drain Pot Solenoid Valves2023-01-17017 January 2023 Response to Request for Additional Information for Quad Cities Relief Request RV-04, Inservice Testing of High Pressure Coolant Injection Drain Pot Solenoid Valves RS-22-127, Submittal of Sixth Inservice Inspection Interval Relief Request I6R-10 Reactor Pressure Vessel Penetration N-11B Repair2022-12-14014 December 2022 Submittal of Sixth Inservice Inspection Interval Relief Request I6R-10 Reactor Pressure Vessel Penetration N-11B Repair RS-22-126, Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2022-11-30030 November 2022 Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI RS-22-119, Withdrawal of Relief Request RV-11 Associated with the Sixth Inservice Testing Interval2022-10-31031 October 2022 Withdrawal of Relief Request RV-11 Associated with the Sixth Inservice Testing Interval RS-22-109, Response to Request for Additional Information License Amendments Related to Fuel Storage2022-10-12012 October 2022 Response to Request for Additional Information License Amendments Related to Fuel Storage RS-22-112, Submittal of RV-04 Relief Request Associated with the Sixth Inservice Testing Interval2022-10-0707 October 2022 Submittal of RV-04 Relief Request Associated with the Sixth Inservice Testing Interval RS-22-108, Response to Request for Additional Information LaSalle County Station, Units 1 and 2 and Quad Cities Nuclear Power Station, Units 1 and 2 License Amendments Related to Fuel Storage2022-10-0505 October 2022 Response to Request for Additional Information LaSalle County Station, Units 1 and 2 and Quad Cities Nuclear Power Station, Units 1 and 2 License Amendments Related to Fuel Storage RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration RS-22-093, Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans2022-08-18018 August 2022 Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans RS-22-102, Supplement to Request to Revise Technical Specification 3.1.4, Control Rod Scam Times2022-08-18018 August 2022 Supplement to Request to Revise Technical Specification 3.1.4, Control Rod Scam Times 2024-08-20
[Table view] |
Text
AmerGensm Exelkno An Exelon Company www.exeloncorp.com Nuclear AmerGen Energy Company, LLC Exelon Generation 4300 Winfield Road Warrenville, IL 60555 4300 Winfield Road Warrenville, IL 60555 10 CFR 50.90 RS-08-004 5928-08-20018 January 18, 2008 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Three Mile Island Nuclear Station, Unit 1 Facility Operating License No. DPR-50 NRC Docket No. 50-289 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265
Subject:
Response to Request for Additional Information - Exelon/AmerGen Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process
Reference:
(1) Exelon/AmerGen Letter to USNRC, "Exelon/AmerGen Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process," dated April 12, 2007 This letter provides additional information in response to an NRC request for additional information (RAI) received via NRC email, dated October 25, 2007, regarding Three Mile Island Nuclear Station, Unit 1 (TMI Unit 1), and Quad Cities Nuclear Power Station, Units 1 and 2 (Quad Cities) Technical Specification (TS) Change Requests implementing TSTF-448, Revision 3, "Control Room Habitability," submitted to the NRC for review on April 12, 2007 (Reference 1).
The additional information is provided in Enclosure 1.
Exelon Generation Company, LLC/AmerGen Energy Company, LLC have reviewed the information supporting a finding of no significant hazards consideration that was previously provided to the NRC in Reference 1. The additional information provided in this submittal does not affect the bases for concluding that the proposed license amendment does not involve a significant hazards consideration.
No new regulatory commitments are established by this submittal. Ifany additional information is needed, please contact Mr. David J. Distel at (610) 765-5517.
4A102
/%J1i0\
Response to Request for Additional Information - LAR TSTF-448 Control Room Envelope Habitability January 18, 2008 Page 2 on the 18 th I declare under penalty of perjury that the foregoing is true and correct. Executed day of January, 2008.
Sincerely, OIW4A14 Pamela B. C*wan Director - Licensing and Regulatory Affairs Exelon Generation Company, LLC AmerGen Energy Company, LLC
Enclosure:
- 1) Response to Request for Additional Information cc: Regional Administrator, NRC Region I Regional Administrator, NRC Region Ill NRC Senior Resident Inspector - TMI Unit 1 NRC Senior Resident Inspector - Quad Cities Nuclear Power Station C. Gratton, NRC Senior Project Manager P. J. Bamford, NRC Project Manager, TMI Unit 1 J. Wiebe, NRC Senior Project Manager, Quad Cities Nuclear Power Station Illinois Emergency Management Agency - Division of Nuclear Safety Director, Bureau of Radiation Protection, Pennsylvania Department of Environmental Resources Chairman, Board of County Commissioners of Dauphin County, PA Chairman, Board of Supervisors of Londonderry Township, PA J. H. Riley - NEI
ENCLOSURE 1 Three Mile Island Nuclear Station, Unit 1 Quad Cities Nuclear Power Station, Units I and 2 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION TECHNICAL SPECIFICATION CHANGE REQUESTS TO IMPLEMENT TSTF-448, REVISION 3, "CONTROL ROOM HABITABILITY"
ENCLOSURE 1 THREE MILE ISLAND NUCLEAR STATION, UNIT 1 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION TECHNICAL SPECIFICATION CHANGE REQUESTS TO IMPLEMENT TSTF-448, REVISION 3, "CONTROL ROOM HABITABILITY" The April 12, 2007, LAR identifies TSTF-448 exceptions as being:
- 1. TMI Unit 1 has not adopted the Standardized Technical Specification format.
TSTF-448 has been incorporated into the existing TS sections with new sections being added as applicable.
- 2. TS Section 3.15.1.5 states that fuel handling operations shall be terminated in 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, in lieu of immediately, from the time that both control room air treatment systems are made or found to be inoperable due to an inoperable CRE boundary.
The 2-hour time period is consistent with current TMI Unit 1 TS requirements for inoperability of both trains of the control room air treatment system during fuel handling operations and allows orderly completion of fuel handling tasks in progress.
Given the above, the NRC staff requests the following information:
- 1. NRC Question Your proposed Specification 3.15.1.5 reads:
From the date that one or both control room air treatment systems are made or found to be inoperable due to an inoperable Control Room Envelope boundary, actions to implement mitigating actions shall be initiated immediately, verification that the mitigating actions ensure CRE occupant exposures to radiological, chemical, and smoke hazards will not exceed limits shall be performed within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and the CRE boundary shall be restored to operable status within 90 days. Irradiated fuel handling operations shall be terminated in 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. If the CRE boundary cannot be made operable in 90 days, reactor shutdown shall be initiated and the reactor shall be in cold shutdown within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.
TSTF-448, TS 3.7.10, ACTION E, states for one or more control room emergency ventilation system (CREVS) trains inoperable due to an inoperable CRE boundary during movement of irradiated fuel assemblies, immediately suspend movement of irradiated fuel assemblies.
The TSTF-448 Bases for ACTION E reads: "...action must be taken immediately to suspend activities that could result in release of radioactivity that might require isolation of the CRE.
This places the unit in a condition that minimizes the accident risk. This does not preclude the movement of fuel to a safe position."
- a. Explain why the deviation from the TSTF-448 suggested wording to the 2-hour allowance to terminate irradiated fuel handling would be acceptable.
Enclosure 1 Response to Request for Additional Information Page 2 of 4
Response
It is recognized that the TSTF-448, TS 3.7.10, Action E statement requiring immediate suspension of movement of irradiated fuel assemblies for one or more Control Room Emergency Ventilation (CREV) trains inoperable due to an inoperable CRE boundary is worded to be consistent with the existing STS 3.7.10, Action E statement to immediately suspend movement of irradiated fuel assemblies with two CREV trains inoperable. TMI Unit 1 does not have Standard Technical Specifications (STS). Therefore, the proposed TS 3.15.1.5 wording for both CREV systems inoperable due to an inoperable CRE boundary was adopted to be consistent with the existing TMI Unit 1 TS 3.15.1.4 wording for both CREV systems inoperable, which currently specifies that irradiated fuel handling operations shall be terminated in 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. The 2-hour action statement in the TMI Unit 1 existing TS 3.15.1.4, and the proposed TS 3.15.1.5, allows movement of fuel to a safe position, consistent with the TSTF-448 Bases for Action E to not preclude movement of fuel to a safe position.
Therefore, the proposed TMI Unit 1 TS action statement wording was adopted to be consistent with the existing TMI Unit 1 TS action statements for inoperable CREV systems, and maintains consistency with the intent of the TSTF-448 Bases to allow movement of a fuel assembly to a safe position in the event both CREV systems are inoperable.
TSTF-448 has the TS 3.7.10, ACTION C for being in MODE 5 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />, if the 90-day completion time is not met.
- b. Explain why the deviation from the TSTF-448 suggested wording for being in MODE 5 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> to your proposed 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> to cold shutdown would be acceptable.
Response
It is recognized that the TSTF-448, TS 3.7.10, Action C statement for being in Mode 5 (Cold Shutdown) in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />, if the 90-day completion is not met for one or more Control Room Emergency Ventilation (CREV) trains inoperable due to an inoperable CRE boundary, reflects the existing STS 3.7.10, Action C requirement when one inoperable CREV train cannot be restored to operable status within the 7 day completion time or both CREV trains are inoperable. TMI Unit 1 does not have Standard Technical Specifications (STS). Therefore, the proposed TS 3.15.1.5 requirement to be in cold shutdown within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> if the 90-day completion time for both CREV systems inoperable due to an inoperable CRE boundary was adopted to be consistent with the existing TMI Unit 1 TS 3.15.1.4 requirement for both CREV systems inoperable. The existing TMI Unit 1 TS 3.15.1.4 requirement for both CREV systems inoperable currently requires the reactor to be in cold shutdown within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> from the date both CREV systems become inoperable, or an inoperable CREV train cannot be made operable within 7 days.
Enclosure 1 Response to Request for Additional Information Page 3 of 4 Therefore, the proposed TMI Unit 1 TS action statement wording for an inoperable CRE boundary was adopted to be consistent with the existing TMI Unit 1 TS action statements for inoperable CREV systems.
- 2. NRC Question Your proposed TS 6.19 d. reads:
Measurement, at designated locations, of the CRE pressure relative to all external areas adjacent to the CRE boundary during the pressurization mode of operation by one train of the Control Room Ventilation System, operating at the design flow rate, at a Frequency of 24 months.
TSTF-448 has the suggested wording for 5.5.15 read:
Measurement, at designated locations, of the CRE pressure relative to all external areas adjacent to the CRE boundary during the pressurization mode of operation by one subsystem of the [ ] System, operating at the flow rate required by the VFTP, at a Frequency of [ ] months on a STAGGERED TEST BASIS.
Explain why the deviation from the TSTF-448 suggested wording, for CRE boundary differential pressure test performance on a staggered test basis, would be acceptable.
Response
The existing TMI Unit 1 TS do not include a definition of STAGGERED TEST BASIS. The TMI Unit 1 CRE boundary differential pressure test, required by the proposed TS 6.19.d, will be performed as part of the Emergency Control Room Air Treatment System flow surveillance specified in TMI Unit 1 TS 4.12.1, each refueling interval (24 months). This TS surveillance tests the design flow of each train of the Emergency Control Room Air Treatment System each refueling interval. Once the test equipment is setup, each train of the ventilation system is tested individually. Since most of the system ductwork is common, this testing only requires swap over from the "A" train to the "B" train of the Emergency Control Room Air Treatment System. The CRE boundary differential pressure test for each train of the Emergency Control Room Air Treatment System will be performed as part of the same test plan. This approach is more conservative than the TSTF-448 requirement since both trains of the TMI Unit 1 Emergency Control Room Air Treatment system will be required to demonstrate adequate CRE pressure relative to external areas every 24 months, whereas the TSTF-448 requirement would test a single ventilation system train every 24 months with both trains being tested every 48 months in accordance with the Standard Technical Specifications (NUREG-1430) definition of STAGGERED TEST BASIS.
Enclosure 1 Response to Request for Additional Information Page 4 of 4 QUAD CITIES NUCLEAR POWER STATION, UNITS 1 and 2 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION TECHNICAL SPECIFICATION CHANGE REQUESTS TO IMPLEMENT TSTF-448, REVISION 3, "CONTROL ROOM HABITABILITY"
- 1. NRC Question The licensee included Bases changes with the proposed TS changes. Since the information contained in the Bases is not a part of the TS, the NRC staff reviewed the Bases only to assure consistency with the proposed change. As such, the NRC staff has the following comment on the Quad Cities, Units 1 and 2, Bases:
On mark-up page B 3.7.4-8, in the modified section now titled "D.1 and D.2," the second section was not modified and continues to read "...the required Actions of Condition C are modified..." It appears that the sentence is no longer consistent with the proposed mark-up for TS 3.7.4.
Response
Exelon Generation Company (EGC) agrees with the NRC comment on the proposed Bases changes. The Bases page should read, "...the Required Actions of Condition D are modified..." EGC will correct this item prior to implementation in accordance with the TS Bases Control Program.