RC-16-0038, (VCSNS) Unit 1 - Notification of Compliance to NRC Security Order EA-13-228

From kanterella
Jump to navigation Jump to search
(VCSNS) Unit 1 - Notification of Compliance to NRC Security Order EA-13-228
ML16067A134
Person / Time
Site: Summer, 07201038  South Carolina Electric & Gas Company icon.png
Issue date: 03/03/2016
From: Lippard G
South Carolina Electric & Gas Co
To:
Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
CR-14-00415, EA-13-228, RC-16-0038
Download: ML16067A134 (2)


Text

AR

~George A.

L~ippard Vice President, Nuclear Operations (803) 345-4810 March 3, 2016 A SCANA COMPANY R-603 U. S. Nuclear Regulatory Commission Document Controi Desk Dir'ector, Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-000 1

Dear Sir/Madam:

Subject:

VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT 1 DOCKET NOs. 50-395 and 72-1 038 OPERATING LICENSE NO. NPF-12 NOTIFICATION OF COMPLIANCE TO NRC SECURITY ORDER EA-1 3-22 8

Reference:

1. NRC Order Number EA-1 3-228, "Issuance of Order for Implementation of Additional Security Measures and Fingerprinting for Unescorted Access for Virgil C. Summer Nuclear Station Independent Spent Fuel Storage Installation," dated January 28, 2014 [ML 1329A541]
2. South Carolina Electric & Gas Company Response to Order for Implementation of Additional Security Measures and Fingerprinting for Unescorted Access for the Virgil C. Summer-Nuclear Station Independent Spent Fuel Storage Installation, dated February 17, 2014 [ML14050A111]
3. South Carolina Electric & Gas Company Revised Implementation Schedule for Implementation of Additional Security Measures-NRC Order EA-13-228 dated January 27, 2015
4. South Carolina Electric & Gas Company Revised Implementation Schedule for Implementation of Additional Security Measures-NRC Order EA-1 3-228 dated April 1, 2015
5. South Carolina Electric & Gas Company Notification of Compliance to NRC

Gas Company (SCE&G), the licensee for Virgil C. Summer Nuclear Station Unit 1 (VCSNS), to comply with Additional Security Measures (ASMs). SCE&G responded (Reference 2) with a schedule to achieve compliance with the ASMs. Subsequently, the implementation date was revised (References 3 and 4) based on current fuel load plans.

NOTE: WHEN SEPARATED FROM SAFEGUARDS INFORMATION ENCLOSURES, THIS DoUCUMNT" Is DECONT'ROLLED, PROVIDED THE TRANSMITTAL DOCUENT DOES NOT OTHERWISE wARATyPROTECTION FR'OM UNAUTHORIED DISCLOSURE_.

Document Control Desk C R-14-00415 R C 0038,,

,,.o.:..

Page 2 of 2 In a letter dated December 16, 2015 (Reference 5), VCSNS provided notification to the NRC that VCSNS was in full compliance with the requirements of Security Order EA-13-228 as of December 10, 2015.

This letter provides a detailed response for each requirement described in NRC Order EA 228. VCSNS will store fuel in the Independent Spent Fuel Storage Installation on or after March 21, 2016.

This letter contains no new or modified regulatory commitments. Should you have any questions concerning the content of this letter, please contact Bruce L. Thompson at (803) 931-5042.

I certify under penalty of perjury that the information contained herein is true and correct.

Executed on Geo Af. Lippard SBR/GAL/sr Attachment Enclosures c:

K. B. Marsh S. A. Byrne J. B. Archie N. S. Cams J. H. Hamilton

,J. W. Williams W. M. Cherry C. Haney S. A. Williams M.D. Lombard NRC Resident Inspector K. M. Sutton NSRC NMSS RTS (CR-14.-00415)

File (810.64, 815.07)

PRSF (RC-16-0038)

NOTE:WE SEPARA ORQ SAFEGUARDS I-FORMATION ENCLOSURES, TI DOUCUMENT IS DECONTROLLED PROVIDED THE TRANSM[TTAL DOCUMENT DOES NOT OTHE3RWISE WARRANT PROTECTION FROM UNAUTHORIZED DISCLOSURE.

AR

~George A.

L~ippard Vice President, Nuclear Operations (803) 345-4810 March 3, 2016 A SCANA COMPANY R-603 U. S. Nuclear Regulatory Commission Document Controi Desk Dir'ector, Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-000 1

Dear Sir/Madam:

Subject:

VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT 1 DOCKET NOs. 50-395 and 72-1 038 OPERATING LICENSE NO. NPF-12 NOTIFICATION OF COMPLIANCE TO NRC SECURITY ORDER EA-1 3-22 8

Reference:

1. NRC Order Number EA-1 3-228, "Issuance of Order for Implementation of Additional Security Measures and Fingerprinting for Unescorted Access for Virgil C. Summer Nuclear Station Independent Spent Fuel Storage Installation," dated January 28, 2014 [ML 1329A541]
2. South Carolina Electric & Gas Company Response to Order for Implementation of Additional Security Measures and Fingerprinting for Unescorted Access for the Virgil C. Summer-Nuclear Station Independent Spent Fuel Storage Installation, dated February 17, 2014 [ML14050A111]
3. South Carolina Electric & Gas Company Revised Implementation Schedule for Implementation of Additional Security Measures-NRC Order EA-13-228 dated January 27, 2015
4. South Carolina Electric & Gas Company Revised Implementation Schedule for Implementation of Additional Security Measures-NRC Order EA-1 3-228 dated April 1, 2015
5. South Carolina Electric & Gas Company Notification of Compliance to NRC

Gas Company (SCE&G), the licensee for Virgil C. Summer Nuclear Station Unit 1 (VCSNS), to comply with Additional Security Measures (ASMs). SCE&G responded (Reference 2) with a schedule to achieve compliance with the ASMs. Subsequently, the implementation date was revised (References 3 and 4) based on current fuel load plans.

NOTE: WHEN SEPARATED FROM SAFEGUARDS INFORMATION ENCLOSURES, THIS DoUCUMNT" Is DECONT'ROLLED, PROVIDED THE TRANSMITTAL DOCUENT DOES NOT OTHERWISE wARATyPROTECTION FR'OM UNAUTHORIED DISCLOSURE_.

Document Control Desk C R-14-00415 R C 0038,,

,,.o.:..

Page 2 of 2 In a letter dated December 16, 2015 (Reference 5), VCSNS provided notification to the NRC that VCSNS was in full compliance with the requirements of Security Order EA-13-228 as of December 10, 2015.

This letter provides a detailed response for each requirement described in NRC Order EA 228. VCSNS will store fuel in the Independent Spent Fuel Storage Installation on or after March 21, 2016.

This letter contains no new or modified regulatory commitments. Should you have any questions concerning the content of this letter, please contact Bruce L. Thompson at (803) 931-5042.

I certify under penalty of perjury that the information contained herein is true and correct.

Executed on Geo Af. Lippard SBR/GAL/sr Attachment Enclosures c:

K. B. Marsh S. A. Byrne J. B. Archie N. S. Cams J. H. Hamilton

,J. W. Williams W. M. Cherry C. Haney S. A. Williams M.D. Lombard NRC Resident Inspector K. M. Sutton NSRC NMSS RTS (CR-14.-00415)

File (810.64, 815.07)

PRSF (RC-16-0038)

NOTE:WE SEPARA ORQ SAFEGUARDS I-FORMATION ENCLOSURES, TI DOUCUMENT IS DECONTROLLED PROVIDED THE TRANSM[TTAL DOCUMENT DOES NOT OTHE3RWISE WARRANT PROTECTION FROM UNAUTHORIZED DISCLOSURE.