Text

Thomas D. Gatlin GeneralManager, Nuclear Plant Operations 803.345.4342 ASCANA coMPANY, December 16, 2015 RC-1 5-0189 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001

Dear Sir / Madam:

Subject:

VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT I DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 COMMITMENT TO MAINTAIN SEVERE ACCIDENT MANAGEMENT GUIDELINES The Nuclear Energy Institute (NEI) Nuclear Strategic Issues Advisory Committee (NSIAC) recently approved an industry initiative to implement and maintain Severe Accident Management Guidelines (SAMGs). This letter establishes commitments related to SAMGs for Virgil C. Summer Nuclear Station Unit 1. These guidelines would-be used by emergency response personnel during accident conditions that progress beyond the mitigation capabilities described in Emergency Operating Procedures (EOPs). SAMG strategies are intended to arrest the progression of fuel damage, maintain the capability of the containment as long as possible, and minimize radiological releases.

It is expected that NRC personnel will conduct periodic inspection of our SAMGs; and performance deficiencies, if any, will be assessed using the Reactor Oversight Process.

We also understand that inspection activities will not extend to NRC review and approval of SAMG strategies or the use of equipment described in the SAMGs.

The new SAMG commitments are listed in Attachment 1.

Should you have any questions regarding this report, please contact Bruce L.

Thompson at (803) 931-5042.

Very truly yours, Thomas D. Gatlin PFITDG/ts

Attachment:

List of Regulatory Commitments V.C.Summer Nuclear Station

  • P.O.Box 88. Jenkinsville, SC.* 29065 F(83)94-97

Document Control Desk CR-i15-05995 RC-1 5-0189 Page 2 of 2 c: K. B. Marsh S. A. Byrne J. B. Archie N. S. Camns J. H. Hamilton J. W. Williams W. M. Cherry L. D. Wert S. A. Williams NRC Resident Inspector K. M. Sutton W. M. Dean NSRC RTS (CR-I15-05995)

File (810.65)

PRSF (RC-15-0189)

Document Control Desk Attachment CR-i15-059.95 RC-1 5-0189 Page 1 of 2 VIRGIL C. SUMMER NUCLEAR STATION UNIT I DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 ATTACHMENT LIST OF REGULATORY COMMITMENTS

Document Control Desk Attachment CR-i15-05995 RC-I15-0189 Page 2 of 2 List of Regulatory Commitments The following table identifies those actions committed to by South Carolina Electric &

Gas Company in this document. Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments. Please direct questions regarding commitments to Bruce L. Thompson at (803) 931-5042.

Commitment ScheduledDate Completion Item Virgil C. Summer Nuclear Station Unit 1 will consider the site SAMGs within plant configuration October 31, 2016 management processes in order to ensure that the SAMGs reflect changes to the facility over time.

Virgil C. Summer Nuclear Station Unit 1 will update the site SAMGs to future revisions of the PWROG generic severe accident technical guidelines, and Within 2 refueling the SAMGs will be integrated with other emergency outages or 3 years of 2 response guideline sets and symptom-based the publication date of Emergency Operating Procedures, and validated, the guidelines, using the guidance in NEI 14-01, Emergency whichever is greater Response Procedures and Guidelines for Beyond Design Basis Events and Severe Accidents.

Thomas D. Gatlin GeneralManager, Nuclear Plant Operations 803.345.4342 ASCANA coMPANY, December 16, 2015 RC-1 5-0189 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001

Dear Sir / Madam:

Subject:

VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT I DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 COMMITMENT TO MAINTAIN SEVERE ACCIDENT MANAGEMENT GUIDELINES The Nuclear Energy Institute (NEI) Nuclear Strategic Issues Advisory Committee (NSIAC) recently approved an industry initiative to implement and maintain Severe Accident Management Guidelines (SAMGs). This letter establishes commitments related to SAMGs for Virgil C. Summer Nuclear Station Unit 1. These guidelines would-be used by emergency response personnel during accident conditions that progress beyond the mitigation capabilities described in Emergency Operating Procedures (EOPs). SAMG strategies are intended to arrest the progression of fuel damage, maintain the capability of the containment as long as possible, and minimize radiological releases.

It is expected that NRC personnel will conduct periodic inspection of our SAMGs; and performance deficiencies, if any, will be assessed using the Reactor Oversight Process.

We also understand that inspection activities will not extend to NRC review and approval of SAMG strategies or the use of equipment described in the SAMGs.

The new SAMG commitments are listed in Attachment 1.

Should you have any questions regarding this report, please contact Bruce L.

Thompson at (803) 931-5042.

Very truly yours, Thomas D. Gatlin PFITDG/ts

Attachment:

List of Regulatory Commitments V.C.Summer Nuclear Station

  • P.O.Box 88. Jenkinsville, SC.* 29065 F(83)94-97

Document Control Desk CR-i15-05995 RC-1 5-0189 Page 2 of 2 c: K. B. Marsh S. A. Byrne J. B. Archie N. S. Camns J. H. Hamilton J. W. Williams W. M. Cherry L. D. Wert S. A. Williams NRC Resident Inspector K. M. Sutton W. M. Dean NSRC RTS (CR-I15-05995)

File (810.65)

PRSF (RC-15-0189)

Document Control Desk Attachment CR-i15-059.95 RC-1 5-0189 Page 1 of 2 VIRGIL C. SUMMER NUCLEAR STATION UNIT I DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 ATTACHMENT LIST OF REGULATORY COMMITMENTS

Document Control Desk Attachment CR-i15-05995 RC-I15-0189 Page 2 of 2 List of Regulatory Commitments The following table identifies those actions committed to by South Carolina Electric &

Gas Company in this document. Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments. Please direct questions regarding commitments to Bruce L. Thompson at (803) 931-5042.

Commitment ScheduledDate Completion Item Virgil C. Summer Nuclear Station Unit 1 will consider the site SAMGs within plant configuration October 31, 2016 management processes in order to ensure that the SAMGs reflect changes to the facility over time.

Virgil C. Summer Nuclear Station Unit 1 will update the site SAMGs to future revisions of the PWROG generic severe accident technical guidelines, and Within 2 refueling the SAMGs will be integrated with other emergency outages or 3 years of 2 response guideline sets and symptom-based the publication date of Emergency Operating Procedures, and validated, the guidelines, using the guidance in NEI 14-01, Emergency whichever is greater Response Procedures and Guidelines for Beyond Design Basis Events and Severe Accidents.