Category:Letter type:RC
MONTHYEARRC-22-0004, (Vcsns), Unit 1 - 2021 Annual Letter of Certification and Testing Results of the Public Alerting System2022-01-14014 January 2022 (Vcsns), Unit 1 - 2021 Annual Letter of Certification and Testing Results of the Public Alerting System RC-18-0157, (Vcsns), Units 1, 2 and 3 Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses2018-12-28028 December 2018 (Vcsns), Units 1, 2 and 3 Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses RC-18-0149, ISFSI - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses2018-12-21021 December 2018 ISFSI - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses RC-18-0136, (Vcsns), Unit 1 - Request to Remove the Expired One-Time Extension to Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation and to Remove the Index from Technical Specifications (LAR-18-04683)2018-12-12012 December 2018 (Vcsns), Unit 1 - Request to Remove the Expired One-Time Extension to Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation and to Remove the Index from Technical Specifications (LAR-18-04683) RC-18-0144, (Vcsns), Unit 1 - Core Operating Limits Report (COLR) for Cycle 252018-11-20020 November 2018 (Vcsns), Unit 1 - Core Operating Limits Report (COLR) for Cycle 25 RC-18-0126, (Vcsns), Unit 1 - Notification of an Intended Change a Commitment Date for Open Phase Condition (OPC) Made in RC-17-01692018-11-0909 November 2018 (Vcsns), Unit 1 - Notification of an Intended Change a Commitment Date for Open Phase Condition (OPC) Made in RC-17-0169 RC-18-0070, (Vcsns), Unit 1 - Relief Request RR-4-14, Use of a Performance Based Testing Frequency for Pressure Isolation Valves as an Alternative to the Requirements of the American Society of Mechanical Engineers Code for ...2018-10-0808 October 2018 (Vcsns), Unit 1 - Relief Request RR-4-14, Use of a Performance Based Testing Frequency for Pressure Isolation Valves as an Alternative to the Requirements of the American Society of Mechanical Engineers Code for ... RC-18-0067, (Vcsns), Unit 1 - License Amendment Request - LAR-16-00644 - Revise Reactor Coolant System Operational Leakage Technical Specification Surveillance Requirement 4.4.6.2.22018-10-0808 October 2018 (Vcsns), Unit 1 - License Amendment Request - LAR-16-00644 - Revise Reactor Coolant System Operational Leakage Technical Specification Surveillance Requirement 4.4.6.2.2 RC-18-0123, NRC Request for Information Baseline Radiation Safety Inspection2018-10-0404 October 2018 NRC Request for Information Baseline Radiation Safety Inspection RC-18-0117, (Vcsns), Unit 1 - Fukushima Near-Term Task Force Recommendation 3.1: Seismic Probabilistic Risk Assessment2018-09-28028 September 2018 (Vcsns), Unit 1 - Fukushima Near-Term Task Force Recommendation 3.1: Seismic Probabilistic Risk Assessment RC-18-0112, (Vcsns), Unit 1 - Request for License Amendment to Virgil C. Summer Nuclear Station Technical Specification 3.8.2, D.C. Sources - Operating, Surveillance Requirements 4.8.2.1.B.2 and 4.8.2.1.C.32018-09-27027 September 2018 (Vcsns), Unit 1 - Request for License Amendment to Virgil C. Summer Nuclear Station Technical Specification 3.8.2, D.C. Sources - Operating, Surveillance Requirements 4.8.2.1.B.2 and 4.8.2.1.C.3 RC-18-0119, (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422, Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation2018-09-19019 September 2018 (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422, Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation RC-18-0118, (Vcsns), Unit 1 - Relief Request RR-4-18, Request for a Temporary Non-Code Repair of a Service Water System Flange2018-09-14014 September 2018 (Vcsns), Unit 1 - Relief Request RR-4-18, Request for a Temporary Non-Code Repair of a Service Water System Flange RC-18-0116, (Vcsns), Unit 1 - Request for a One-Time Extension to the Surveillance Frequency 4.4.4.6 of the Core Exit Temperature Instrumentation - Response to Request for Additional Information2018-09-11011 September 2018 (Vcsns), Unit 1 - Request for a One-Time Extension to the Surveillance Frequency 4.4.4.6 of the Core Exit Temperature Instrumentation - Response to Request for Additional Information RC-18-0113, (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation2018-08-31031 August 2018 (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation RC-18-0091, License Amendment Request - LAR-16-01490 National Fire Protection Association Standard 805 Program Revisions2018-08-29029 August 2018 License Amendment Request - LAR-16-01490 National Fire Protection Association Standard 805 Program Revisions RC-18-0111, License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation2018-08-24024 August 2018 License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation RC-18-0100, (Vcsns), Unit 1 - Technical Specification Change Request for the Revision of the Surveillance Frequency of the Turbine Trip Functional Unit: Response to Request for Additional Information2018-08-22022 August 2018 (Vcsns), Unit 1 - Technical Specification Change Request for the Revision of the Surveillance Frequency of the Turbine Trip Functional Unit: Response to Request for Additional Information RC-18-0105, (Vcsns), Unit 1 - Relief Request RR-4-17, Request to Utilize Code Case N-513-3 'Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1' for a Service Water ..2018-08-14014 August 2018 (Vcsns), Unit 1 - Relief Request RR-4-17, Request to Utilize Code Case N-513-3 'Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1' for a Service Water .. RC-18-0102, Withdrawal of Request to Revise Technical Specifications to Correct an Administrative Error2018-08-10010 August 2018 Withdrawal of Request to Revise Technical Specifications to Correct an Administrative Error RC-18-0098, (Vcsns), Units 1, 2 and 3 - Modification of Requested Latest Completion Date in Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses2018-07-30030 July 2018 (Vcsns), Units 1, 2 and 3 - Modification of Requested Latest Completion Date in Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses RC-18-0085, (Vcsns), Unit 1 - Notification of an Intended Change to a Commitment Made in RC-17-01262018-07-23023 July 2018 (Vcsns), Unit 1 - Notification of an Intended Change to a Commitment Made in RC-17-0126 RC-18-0090, (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Response to Request...2018-07-12012 July 2018 (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Response to Request... RC-18-0089, (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping2018-07-11011 July 2018 (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping RC-18-0084, Virgil C Summer Nuclear Station (Vcsns), Unit 1 - Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Laws in Moderate Energy Class 2 or 3 Piping Response to Requ2018-07-0303 July 2018 Virgil C Summer Nuclear Station (Vcsns), Unit 1 - Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Laws in Moderate Energy Class 2 or 3 Piping Response to Reques RC-18-0082, Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping2018-07-0303 July 2018 Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping RC-18-0079, Vigil C. Summer Nuclear Station (Vcsns), Unit 1 - Request to Revise Technical Specifications to Correct an Administrative Error2018-06-29029 June 2018 Vigil C. Summer Nuclear Station (Vcsns), Unit 1 - Request to Revise Technical Specifications to Correct an Administrative Error RC-18-0074, Change of the Commitment Date of DRIB/105A&B Door Submittal2018-06-18018 June 2018 Change of the Commitment Date of DRIB/105A&B Door Submittal RC-18-0060, (VCSNS) - Request to Revise Technical Specifications to Correct Administrative Error2018-05-30030 May 2018 (VCSNS) - Request to Revise Technical Specifications to Correct Administrative Error RC-18-0064, (Vcsns), Unit 1 - Annual Commitment Change Summary Report2018-05-18018 May 2018 (Vcsns), Unit 1 - Annual Commitment Change Summary Report RC-18-0063, Submittal of 10 CFR 72.48 Biennial Report for the Independent Spent Fuel Storage Installation2018-05-0202 May 2018 Submittal of 10 CFR 72.48 Biennial Report for the Independent Spent Fuel Storage Installation RC-18-0056, (Vcsns), Unit 1 - Licensee Event Reports (2016-001-02, 2016-002-01, 2016-003-02) - Revision to Correct Typographical Errors2018-04-25025 April 2018 (Vcsns), Unit 1 - Licensee Event Reports (2016-001-02, 2016-002-01, 2016-003-02) - Revision to Correct Typographical Errors RC-18-0059, Annual Radioactive Effluent Release Report2018-04-25025 April 2018 Annual Radioactive Effluent Release Report RC-18-0046, License Amendment Request LAR-14-01541 Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change Request for Additional Information2018-04-19019 April 2018 License Amendment Request LAR-14-01541 Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change Request for Additional Information RC-18-0036, (Vcsns), Unit 1 - Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds - Response to Request for Additional Information2018-04-0202 April 2018 (Vcsns), Unit 1 - Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds - Response to Request for Additional Information RC-18-0041, Report of Status of Decommissioning Funding2018-03-28028 March 2018 Report of Status of Decommissioning Funding RC-17-0175, Correction to Amendment No. 170 Request to Revise Technical Specifications to Correct Administrative Error2018-01-31031 January 2018 Correction to Amendment No. 170 Request to Revise Technical Specifications to Correct Administrative Error RC-18-0006, Independent Spent Fuel Storage Installation Re Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses2018-01-25025 January 2018 Independent Spent Fuel Storage Installation Re Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses RC-17-0169, Notification of an Intended Change of a Commitment Date for Open Phase Condition Made in RC-14-00192017-12-11011 December 2017 Notification of an Intended Change of a Commitment Date for Open Phase Condition Made in RC-14-0019 RC-17-0182, (VCSNS) - Anchor Darling Double Disc Gate Valve Information and Status2017-12-11011 December 2017 (VCSNS) - Anchor Darling Double Disc Gate Valve Information and Status RC-17-0172, Notification of Personnel Changes2017-11-30030 November 2017 Notification of Personnel Changes RC-17-0161, Submittal of Change of the Commitment Date of DRIB/105A&B Door2017-11-28028 November 2017 Submittal of Change of the Commitment Date of DRIB/105A&B Door RC-17-0135, Annual Commitment Change Summary Report2017-11-0303 November 2017 Annual Commitment Change Summary Report RC-17-0123, Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds2017-10-30030 October 2017 Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds RC-17-0140, Transmittal of 10 CFR 50.59 Biennial Report2017-10-23023 October 2017 Transmittal of 10 CFR 50.59 Biennial Report RC-17-0107, (Vcsns), Unit 1 - Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change2017-10-0606 October 2017 (Vcsns), Unit 1 - Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change RC-17-0134, Response to Request for Supplemental Information, License Amendment Request - LAR-15-01424; Implementation of WCAP-15376-P-A, Revision 12017-09-27027 September 2017 Response to Request for Supplemental Information, License Amendment Request - LAR-15-01424; Implementation of WCAP-15376-P-A, Revision 1 RC-17-0126, Reply to a Notice of Violation, Per Inspection Report 05000395/20170022017-09-0606 September 2017 Reply to a Notice of Violation, Per Inspection Report 05000395/2017002 RC-17-0112, Special Report (Spr) 2017-007 Regarding Waste Gas Holdup System Explosive Gas Monitoring System Being Inoperable for Greater than Thirty Days2017-09-0101 September 2017 Special Report (Spr) 2017-007 Regarding Waste Gas Holdup System Explosive Gas Monitoring System Being Inoperable for Greater than Thirty Days RC-17-0069, (Vcsns), Unit 1 - Quality Assurance Approval Certificate No. 0479, Transmittal of the Quality Assurance Program Description2017-08-30030 August 2017 (Vcsns), Unit 1 - Quality Assurance Approval Certificate No. 0479, Transmittal of the Quality Assurance Program Description 2022-01-14
[Table view] Category:Report
MONTHYEARML24155A2042024-05-31031 May 2024 Proposed Alternative Request RR-24-123, Containment Unbonded Post-Tensioning System Inservice Inspection Requirements ML23325A2022024-01-16016 January 2024 CFR Part 52 Construction Lessons-Learned Report ML23024A1542023-01-23023 January 2023 Proposed Reactor Vessel Surveillance Capsule Withdrawal Schedule to Support Potential Subsequent License Renewal Activity ML22286A1392022-10-13013 October 2022 Special Report 2022-005, Inoperable Radiation Monitoring Instrumentation Channel ML22279A9892022-09-23023 September 2022 Restoration Project - Final Status Survey Release Record North Protected Area Yard Survey Unit 12201C - Revision 2 ML22069B1172022-03-10010 March 2022 Application for Alternative Request - Extension of Steam Generator Primary Inlet Nozzle Dissimilar Metal Weld Inspection Interval (Volumetric Examination) ML22049B0242022-02-18018 February 2022 2021 Q4 Summary Page IR 05000395/20210052021-08-24024 August 2021 Updated Inspection Plan for Virgil C.Summer Nuclear Station, Unit 1 (Report 05000395/2021005) ML21175A2472021-06-24024 June 2021 2020 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the....- ML20296A7082020-10-22022 October 2020 (VCSNS) Unit 1 - Alternative Requests RR-4-25 for Elimination of Reactor Pressure Vessel Threads in Flange Examination for the Remainder of the Fourth 10-Year ISI Interval ML20247J6162020-09-0303 September 2020 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20212L5762020-07-30030 July 2020 Annual Commitment Change Summary Report ML20203M1602020-07-20020 July 2020 VA Elec. & Power Co., Dominion Energy Nuclear Co. Inc., Dominion Energy Sc Inc., Millstone Power Station 2, N. Anna & Surry Power Stations 1 & 2, Virgil C. Summer Station 1, Updated Anchor Darling Double Disc Gate Valve Information & Status ML19204A1172019-07-17017 July 2019 Vigil C. Summer, Unit 1, Proposed Alternative Request RR-4-20 Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography ML19122A5172019-05-0202 May 2019 Annual Commitment Change Summary Report ML19056A4122019-01-31031 January 2019 Virgil C. Summer Nuclear Station NPDES Permit No. SC0030856 Renewal Application, Source Water Baseline Biological Characterization Data ML19056A4112019-01-31031 January 2019 Virgil C. Summer Nuclear Station NPDES Permit No. SC0030856 Renewal Application, Cooling Water Intake Structure Data ML19056A4132019-01-31031 January 2019 Virgil C. Summer Nuclear Station NPDES Permit No. SC0030856 Renewal Application, Cooling Water System Data ML19056A4102019-01-31031 January 2019 Virgil C. Summer Nuclear Station NPDES Permit No. SC0030856 Renewal Application, Source Water Physical Data ML19056A4142019-01-31031 January 2019 Virgil C. Summer Nuclear Station NPDES Permit No. SC0030856 Renewal Application, Entrainment Performance Studies RC-18-0117, (Vcsns), Unit 1 - Fukushima Near-Term Task Force Recommendation 3.1: Seismic Probabilistic Risk Assessment2018-09-28028 September 2018 (Vcsns), Unit 1 - Fukushima Near-Term Task Force Recommendation 3.1: Seismic Probabilistic Risk Assessment ML18179A4162018-06-28028 June 2018 ECCS Evaluation Model Revisions Report RC-18-0064, (Vcsns), Unit 1 - Annual Commitment Change Summary Report2018-05-18018 May 2018 (Vcsns), Unit 1 - Annual Commitment Change Summary Report ML17206A4592017-09-26026 September 2017 Staff Assessment of Response to Information Request Pursuant to 10 CFR 50.54(F) - Recommendation 9.3 of the Near-Term Task Force, Communications Assessment RC-17-0089, Focused Evaluation for External Flooding2017-06-30030 June 2017 Focused Evaluation for External Flooding RC-17-0057, Emergency Core Cooling System Evaluation Model Revisions Annual Report2017-05-15015 May 2017 Emergency Core Cooling System Evaluation Model Revisions Annual Report ML19056A4152017-02-28028 February 2017 Virgil C. Summer Nuclear Station NPDES Permit No. SC0030856 Renewal Application, Appendix B, Entrainment Study, 2016 and Revised 2017 RC-16-0170, Mitigating Strategies Assessment (MSA) Report Submittal2016-12-22022 December 2016 Mitigating Strategies Assessment (MSA) Report Submittal RC-16-0143, (VCSNS) Unit 1 - Report of Full Compliance and Final Integrated Plan in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design...2016-10-31031 October 2016 (VCSNS) Unit 1 - Report of Full Compliance and Final Integrated Plan in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design... RC-16-0081, Submittal of 2015 Annual Commitment Change Summary Report2016-06-22022 June 2016 Submittal of 2015 Annual Commitment Change Summary Report RC-16-0086, Special Report 2016-003 Regarding Fire Barrier Not Restored to Operability Status within 7 Days of Inoperability2016-06-0909 June 2016 Special Report 2016-003 Regarding Fire Barrier Not Restored to Operability Status within 7 Days of Inoperability RC-16-0008, Transmittal of Expedited Seismic Evaluation Process Report, Revision 12016-01-28028 January 2016 Transmittal of Expedited Seismic Evaluation Process Report, Revision 1 ML15296A3772015-11-0303 November 2015 Supplement to Staff Assessment of Response to 10 CFR 50.54(f) Information Request- Flood Causing Mechanism Reevaluation RC-15-0153, Submittal of 10 CFR 50.59 Biennial Report2015-10-0707 October 2015 Submittal of 10 CFR 50.59 Biennial Report ML15194A0552015-07-20020 July 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations Relating to Recommendation 2.1 Fukushima Dai-Ichi RC-15-0020, Attachment 2 - Ihi Southwest Inner Diameter Examination Data, Part 2 of 22015-02-25025 February 2015 Attachment 2 - Ihi Southwest Inner Diameter Examination Data, Part 2 of 2 ML15061A0332015-02-25025 February 2015 Attachment 2 - Ihi Southwest Inner Diameter Examination Data, Part 2 of 2 ML14314A0332014-11-0505 November 2014 Submittal Special Report (Spr) 2014-006 ML14261A2762014-09-18018 September 2014 Draft September 23, 2014, Category 1 Public Meeting with V. C. Summer - Draft License Amendment Related to Approval of the Technical Support Center ML14141A4612014-06-0606 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-ichi Nuclear Power Plant Accident RC-14-0048, Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident2014-03-26026 March 2014 Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident ML14051A3632014-03-0505 March 2014 Closure Letter Concerning 2012 Annual Emergency Core Cooling System Evaluation Model Revisions Report (TAC No. Mf 2722) ML19056A4082014-02-28028 February 2014 Virgil C. Summer Nuclear Station NPDES Permit No. SC0030856 Renewal Application, Thermal Mixing Zone Evaluation, Addendum: Additional Modeling Cases for Revised Reservoir Ambient and Discharge Temperatures ML14034A3392014-02-21021 February 2014 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14037A2282014-02-21021 February 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Virgil C. Summer Nuclear Station, Unit 1, TAC MF2338 ML14010A4152014-01-30030 January 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-ichi Nuclear Power Plant Accident ML13309B0532013-11-0404 November 2013 ECCS Evaluation Model Revisions 30-Day Report RC-13-0130, WCAP-17758-NP, Rev. 0, Technical Basis for Westinghouse Embedded Flaw Repair for V.C. Summer Unit 1 Reactor Vessel Head Penetration Nozzles and Attachment Welds.2013-08-31031 August 2013 WCAP-17758-NP, Rev. 0, Technical Basis for Westinghouse Embedded Flaw Repair for V.C. Summer Unit 1 Reactor Vessel Head Penetration Nozzles and Attachment Welds. RC-13-0038, Flooding Hazard Reevaluation Response to NRC Request for Information Pursuant to 10 CFR 50.54(F) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task.2013-03-12012 March 2013 Flooding Hazard Reevaluation Response to NRC Request for Information Pursuant to 10 CFR 50.54(F) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task. RC-13-0037, Permanent ILRT Interval Extension Risk Impact Assessment2013-03-0101 March 2013 Permanent ILRT Interval Extension Risk Impact Assessment 2024-05-31
[Table view] Category:Miscellaneous
MONTHYEARML22286A1392022-10-13013 October 2022 Special Report 2022-005, Inoperable Radiation Monitoring Instrumentation Channel ML22049B0242022-02-18018 February 2022 2021 Q4 Summary Page IR 05000395/20210052021-08-24024 August 2021 Updated Inspection Plan for Virgil C.Summer Nuclear Station, Unit 1 (Report 05000395/2021005) ML20247J6162020-09-0303 September 2020 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20212L5762020-07-30030 July 2020 Annual Commitment Change Summary Report ML19122A5172019-05-0202 May 2019 Annual Commitment Change Summary Report ML18179A4162018-06-28028 June 2018 ECCS Evaluation Model Revisions Report RC-18-0064, (Vcsns), Unit 1 - Annual Commitment Change Summary Report2018-05-18018 May 2018 (Vcsns), Unit 1 - Annual Commitment Change Summary Report ML17206A4592017-09-26026 September 2017 Staff Assessment of Response to Information Request Pursuant to 10 CFR 50.54(F) - Recommendation 9.3 of the Near-Term Task Force, Communications Assessment RC-17-0057, Emergency Core Cooling System Evaluation Model Revisions Annual Report2017-05-15015 May 2017 Emergency Core Cooling System Evaluation Model Revisions Annual Report RC-16-0170, Mitigating Strategies Assessment (MSA) Report Submittal2016-12-22022 December 2016 Mitigating Strategies Assessment (MSA) Report Submittal RC-16-0081, Submittal of 2015 Annual Commitment Change Summary Report2016-06-22022 June 2016 Submittal of 2015 Annual Commitment Change Summary Report RC-16-0086, Special Report 2016-003 Regarding Fire Barrier Not Restored to Operability Status within 7 Days of Inoperability2016-06-0909 June 2016 Special Report 2016-003 Regarding Fire Barrier Not Restored to Operability Status within 7 Days of Inoperability RC-16-0008, Transmittal of Expedited Seismic Evaluation Process Report, Revision 12016-01-28028 January 2016 Transmittal of Expedited Seismic Evaluation Process Report, Revision 1 ML15296A3772015-11-0303 November 2015 Supplement to Staff Assessment of Response to 10 CFR 50.54(f) Information Request- Flood Causing Mechanism Reevaluation RC-15-0153, Submittal of 10 CFR 50.59 Biennial Report2015-10-0707 October 2015 Submittal of 10 CFR 50.59 Biennial Report ML15194A0552015-07-20020 July 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations Relating to Recommendation 2.1 Fukushima Dai-Ichi RC-15-0020, Attachment 2 - Ihi Southwest Inner Diameter Examination Data, Part 2 of 22015-02-25025 February 2015 Attachment 2 - Ihi Southwest Inner Diameter Examination Data, Part 2 of 2 ML15061A0332015-02-25025 February 2015 Attachment 2 - Ihi Southwest Inner Diameter Examination Data, Part 2 of 2 ML14314A0332014-11-0505 November 2014 Submittal Special Report (Spr) 2014-006 ML14261A2762014-09-18018 September 2014 Draft September 23, 2014, Category 1 Public Meeting with V. C. Summer - Draft License Amendment Related to Approval of the Technical Support Center ML14141A4612014-06-0606 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-ichi Nuclear Power Plant Accident ML14051A3632014-03-0505 March 2014 Closure Letter Concerning 2012 Annual Emergency Core Cooling System Evaluation Model Revisions Report (TAC No. Mf 2722) ML14010A4152014-01-30030 January 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-ichi Nuclear Power Plant Accident ML13309B0532013-11-0404 November 2013 ECCS Evaluation Model Revisions 30-Day Report RC-12-0104, Submittal of ECCS Evaluation Model Revisions 30-Day Report2012-10-16016 October 2012 Submittal of ECCS Evaluation Model Revisions 30-Day Report RC-15-0020, Attachment 5 - Westinghouse LTR-PAFM-12-86 Flaw Tolerance Evaluation to Support Re-Categorization of V.C. Summer Unit 1 Steam Generator Nozzle to Safe End Dissimilar Metal Weld Inspection Requirements2012-07-31031 July 2012 Attachment 5 - Westinghouse LTR-PAFM-12-86 Flaw Tolerance Evaluation to Support Re-Categorization of V.C. Summer Unit 1 Steam Generator Nozzle to Safe End Dissimilar Metal Weld Inspection Requirements RC-11-0178, Submittal of Twenty-Second Report to 10 CFR 50.59(d)(2) Changes2011-11-0404 November 2011 Submittal of Twenty-Second Report to 10 CFR 50.59(d)(2) Changes RC-11-0119, 30-Day Special Report (Rt 2800) Groundwater Protection Initiative (GPI) - Voluntary Special Report for On-Site Liquid Effluent Line Leak2011-08-0303 August 2011 30-Day Special Report (Rt 2800) Groundwater Protection Initiative (GPI) - Voluntary Special Report for On-Site Liquid Effluent Line Leak ML1019304172010-05-0606 May 2010 Tritium Database Report ML0921001332009-07-24024 July 2009 Submittal of Special Report (Spr) 09-0001 RC-09-0050, Submittal of 2008 Emergency Core Cooling System (ECCS) Evaluation Model Revisions Report2009-05-14014 May 2009 Submittal of 2008 Emergency Core Cooling System (ECCS) Evaluation Model Revisions Report ML0810701772008-04-11011 April 2008 Submittal of Special Report 2008-001, Pursuant to Requirements of Technical Specification 3.3.3.10.a RC-08-0019, Request for Use of Higher Assigned Protection Factors with Use of French-Designed Air-Line Respirator Equipment2008-02-19019 February 2008 Request for Use of Higher Assigned Protection Factors with Use of French-Designed Air-Line Respirator Equipment RC-08-0006, Application to Use Weighting Factors for External Exposure2008-02-19019 February 2008 Application to Use Weighting Factors for External Exposure RC-07-0169, Virgil Summer - 10 CFR 50.59 Biennial Report Covering the Period from October 1, 2005 Until October 1, 20072007-11-0606 November 2007 Virgil Summer - 10 CFR 50.59 Biennial Report Covering the Period from October 1, 2005 Until October 1, 2007 RC-07-0081, ECCS Evaluation Model Revisions Annual Report2007-06-0101 June 2007 ECCS Evaluation Model Revisions Annual Report RC-06-0216, License Condition 2.C(5), 14-Day Report on Exceeding Surveillance Frequency2006-12-13013 December 2006 License Condition 2.C(5), 14-Day Report on Exceeding Surveillance Frequency RC-06-0205, ECCS Evaluation Model Revisions Report2006-12-0404 December 2006 ECCS Evaluation Model Revisions Report RC-06-0202, V. C. Summer - ECCS Evaluation Model Revisions Report, Addresses the Effect of Using a Finer Break Spectrum2006-11-15015 November 2006 V. C. Summer - ECCS Evaluation Model Revisions Report, Addresses the Effect of Using a Finer Break Spectrum RC-06-0196, Special Report (Spr) 2006-0052006-10-27027 October 2006 Special Report (Spr) 2006-005 RC-05-0076, Operating License, Special Report (Spr 2005-001)2005-05-19019 May 2005 Operating License, Special Report (Spr 2005-001) ML0727008492005-01-31031 January 2005 Caldon Experience in Nuclear Feedwater Flow Measurement ML0406307712004-02-25025 February 2004 Transmittal of Semi-Annual Fitness-for-Duty Report for Period Ending December 31, 2003 2022-02-18
[Table view] |
Text
Jeffrey B. Archie Vice President,Nuclear Operations 803.345.4214 May 14, 2009 A SCANA COMPANY Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555
Dear Sir / Madam:
Subject:
VIRGIL C. SUMMER NUCLEAR STATION DOCKET NO. 50/395 OPERATING LICENSE NO. NPF-12 ECCS EVALUATION MODEL REVISIONS REPORT South Carolina Electric & Gas Company (SCE&G), acting for itself and as agent for South Carolina Public Service Authority hereby submits the 2008 Emergency Core Cooling System (ECCS) Evaluation Model Revisions Annual Report for the Virgil C.
Summer Nuclear Station (VCSNS). This report is being submitted pursuant to 10 CFR 50.46, which requires licensees to notify the NRC on at least an annual basis of corrections to or changes in the ECCS Evaluation Models.
Summary sheets describing changes and enhancements to the ECCS Evaluation Models for 2008 are included in Attachment I. Peak Clad Temperature (PCT) sheets are included in Attachment I1.
If you have any questions, please call Mr. Bruce L. Thompson at (803) 931-5042.
GAR/JBA/dr Attachments c: K. B. Marsh R. E. Martin S. A. Byrne NRC Resident Inspector N. S. Carns K. M. Sutton J. H. Hamilton NSRC R. J. White RTS (LTD 321, RR 8375)
K. J. Browne File (818.02-17)
L. A. Reyes PRSF (RC-09-0050)
SCE&G I Virgil C.Summer Nuclear Station
- P.0. Box 88 . Jenkinsville, South Carolina 29065 -T (803) 345.5209 www.scona.com
Document Control Desk Attachment I LTD 321 RC-09-0050 Page 1 of 5 Attachment I Changes and Enhancements to the ECCS Evaluation Models for 2008
Document Control Desk Attachment I LTD 321 RC-09-0050 Page 2 of 5 ERRORS IN REACTOR VESSEL LOWER PLENUM SURFACE AREA CALCULATIONS (Non-Discretionary Change)
Background
Two errors were discovered in the calculations of reactor vessel lower plenum surface area. The corrected values have been evaluated for impact on current licensing-basis analysis results and will be incorporated on a forward-fit basis. These changes represent a closely-related group of Non-Discretionary Changes in accordance with Section 4.1.2 of WCAP- 13451.
Affected Evaluation Models 1985 Westinghouse Small Break LOCA Evaluation Model with NOTRUMP Estimated Effect The differences in vessel lower plenum surface area are relatively minor and would be expected to produce a negligible effect on small break LOCA analysis results, leading to an estimated PCT impact of 0°F for 10 CFR 50.46 reporting purposes.
DISCREPANCY IN METAL MASSES USED FROM DRAWINGS (Non-Discretionary Change)
Background
Discrepancies were discovered in the use of metal masses from drawings. The updated reactor vessel metal masses and fluid volumes have been evaluated for impact on current licensing-basis analysis results and will be incorporated on a forward-fit basis. These changes represent a closely-related group of Non-Discretionary Changes in accordance with Section 4.1.2 of WCAP-13451.
Affected Evaluation Model 1985 Westinghouse Small Break LOCA Evaluation Model with NOTRUMP Estimated Effect The differences in the reactor vessel metal mass and fluid volume are relatively minor and would be expected to produce a negligible effect on small break LOCA analysis results, leading to an estimated PCT impact of 00 F for 10 CFR 50.46 reporting purposes.
Document Control Desk Attachment I LTD 321 RC-09-0050 Page 3 of 5 GENERAL CODE MAINTENANCE (Discretionary Change)
Background
Various changes have been made to enhance the usability of the codes and to help preclude errors in analyses. This includes items such as modifying input variable definitions, units, and defaults; improving the input diagnostic checks; enhancing the code output; optimizing active coding; and, eliminating inactive coding. These changes represent Discretionary Changes that will be implemented on a forward-fit basis in accordance with Section 4.1.1 of WCAP-13451.
Affected Evaluation Model 1985 Westinghouse Small Break LOCA Evaluation Model with NOTRUMP Estimated Effect The nature of these changes leads to an estimated PCT impact of 0°F.
,GENERAL CODE MAINTENANCE (Discretionary Change)
Background
A number of coding changes were made as part of normal code maintenance. Examples include additional information in code outputs, improved automation and diagnostics in the codes, increased code dimensions, and general code cleanup. All of these changes are considered to be Discretionary Changes in accordance with Section 4.1.1 of WCAP- 13451.
Affected Evaluation Model 1996 Westinghouse Best Estimate Large Break LOCA Evaluation Model Estimated Effect The nature of these changes leads to an estimated PCT impact of 0°F for 10 CFR 50.46 reporting purposes.
Document Control Desk Attachment I LTD 321 RC-09-0050 Page 4 of 5 HOTSPOT BURST TEMPERATURE LOGIC ERRORS (Non-Discretionary Change)
Background
The HOTSPOT code has been updated to incorporate the following corrections to the burst temperature logic: (1) change the rod internal pressure used to calculate the cladding engineering hoop stress from the value in the previous time step to the value in the current time step; (2) revise the average cladding heat-up rate calculation to reset selected variables to zero at the beginning of each trial and use the instantaneous heat-up rate when fewer than five values are available; and, (3) reflect the assumed saturation of ramp rate effects above 28°C/s for Zircaloy-4 cladding from Equation 7-66 of Reference 1. These changes represent a closely-related group of Non-Discretionary Changes in accordance with Section 4.1.2 of WCAP- 13451.
Affected Evaluation Model 1996 Westinghouse Best Estimate Large Break LOCA Evaluation Model Estimated Effect Sample calculations for each change showed no effect on peak cladding temperature, leading to an estimated impact of 0°F for 10 CFR 50.46 reporting purposes.
Reference
- 1. WCAP-12945-P-A, Volume 1 (Revision 2) and Volumes 2-5 (Revision 1),
"Code Qualification Document for Best Estimate LOCA Analysis," S. M. Bajorek et al.,
March 1998.
Document Control Desk Attachment I LTD 321 RC-09-0050 Page 5 of 5 MODELING OF ANNULAR PELLETS (Non-Discretionary Change)
Background
It was identified that annular pellets were not addressed in the VCSNS small break loss-of-coolant accident (SBLOCA) analysis of record (AOR). A plant specific evaluation was completed to estimate the effect of modeling annular pellets in the VCSNS SBLOCA analysis.
This change represents a Non-Discretionary Change in accordance with Section 4.1.2 of WCAP-13451.
Affected Evaluation Model 1985 Appendix K Small Break LOCA Evaluation Model with NOTRUMP Estimated Effect A plant specific evaluation of annular pellets on the limiting peak cladding temperature (PCT) and limiting transient oxidation break sizes was performed. The evaluation determined that annular pellets have a negligible effect on the VCSNS SBLOCA analysis results, leading to an estimated PCT impact of 00 F for 10 CFR 50.46 reporting purposes.
PCT ASSESSMENT OF TRANSVERSE MOMENTUM CELLS FOR ZERO CROSS-FLOW BOUNDARY CONDITION ERROR IN THE VCSNS BEST-ESTIMATE LARGE BREAK LOCA ANALYSIS (Non-Discretionary Change)
Background
An error was identified in the calculation of the transverse momentum cells for zero cross-flow boundary condition during the course of performing a Best-Estimate Large Break LOCA (BE LBLOCA) evaluation to assess the impact of a conversion of the barrel-baffle region to an upflow configuration. A plant specific evaluation was performed using the WCOBRA/TRAC code to estimate the effect of the error discovered in the VCSNS BE LBLOCA analysis.
Affected Evaluation Model 1996 Westinghouse Best Estimate Large Break LOCA Evaluation Model Estimated Effect The VCSNS Reference Transient was re-run using WCOBRA/TRAC to establish an estimated effect on the PCT. This evaluation resulted in a I°F increase in PCT during the Blowdown period, a 9°F reduction in PCT during the Reflood 1 period, and a 14'F reduction in PCT during the Reflood 2 period. Based on these results, it is concluded that VCSNS continues to maintain a margin of safety to the limits prescribed by 10 CFR 50.46.
Document Control Desk Attachment II LTD 321 RC-09-0050 Page 1 of 7 Attachment II PCT Rackup Sheets
Document Control Desk Attachment II LTD 321 RC-09-0050 Page 2 of 7 Westinghouse LOCA Peak Clad Temperature Summary for Best Estimate Large Break Plant Name: V. C. Summer Utility Name: South Carolina Electric & Gas Revision Date: 1/27/09 Composite Analysis Information EM: CQD (1996) Analysis Date: 2/3/03 Limiting Break Size: Guillotine FQ: 2.5 FdH: 1.7 Fuel: Vantage + SGTP (%): 10 Notes: Delta 75 Replacement Steam Generator Uprate Core Power 2900 MWt Clad Temp ('F) Ref. Notes LICENSING BASIS Analysis-Of-Record PCT 1988 1 PCT ASSESSMENTS (Delta PCT)
A. PRIOR ECCS MODEL ASSESSMENTS
- 1. Backfit Through 2001 Reporting Year 0 2
- 2. Revised Blowdown Heatup Uncertainty Distribution 5 3 B. PLANNED PLANT MODIFICATION EVALUATIONS
- 1. Fan Cooler Performance Increase 2 2 C. 2008 ECCS MODEL ASSESSMENTS
- 1. Transverse Momentum Cells for Zero Cross-flow Boundary Condition -14 4 Error D. OTHER
- 1. None 0 LICENSING BASIS PCT + PCT ASSESSMENTS PCT= 1981
References:
- 1. WCAP- 16043, "Best Estimate Analysis of the Large Break Loss of Coolant Accident for the Virgil C.
Summer Nuclear Station," June 2003.
- 2. CGE-03-12, "10 CFR 50.46 Annual Notification and Reporting for 2002," March 2003.
- 3. CGE-05-20, "10 CFR 50.46 Annual Notification and Reporting for 2004," April 2005.
- 4. LTR-LIS-08-578, Revision 2, "Large Break LOCA Evaluation for V. C. Summer (CGE) Upflow Conversion and Assessment of Transverse Momentum Cells for Zero Cross-flow Boundary Condition Error," January 2009.
Notes:
None
Document Control Desk Attachment II LTD 321 RC-09-0050 Page 3 of 7 Westinghouse LOCA Peak Clad Temperature Summary for Best Estimate Large Break Plant Name: V. C. Summer Utility Name: South Carolina Electric & Gas Revision Date: 1/27/09 Blowdown Analysis Information EM: CQD (1996) Analysis Date: 2/3/03 Limiting Break Size: Guillotine FQ: 2.5 FdH: 1.7 Fuel: Vantage + SGTP (%): 10 Notes: Delta 75 Replacement Steam Generator Uprate Core Power 2900 MWt Clad Temp ('F) Ref. Notes LICENSING BASIS Analysis-Of-Record PCT 1860 1 PCT ASSESSMENTS (Delta PCT)
A. PRIOR ECCS MODEL ASSESSMENTS
- 1. Backfit Through 2001 Reporting Year 0 2
- 2. Revised Blowdown Heatup Uncertainty Distribution 49 3 B. PLANNED PLANT MODIFICATION EVALUATIONS
- 1. Fan Cooler Performance Increase 0 2 C. 2008 ECCS MODEL ASSESSMENTS
- 1. Transverse Momentum Cells for Zero Cross-flow Boundary Condition 1 4 Error D. OTHER
- 1. None 0 LICENSING BASIS PCT + PCT ASSESSMENTS PCT = 1910
References:
- 1. WCAP-16043, "Best Estimate Analysis of the Large Break Loss of Coolant Accident for the Virgil C.
Summer Nuclear Station," June 2003.
- 2. CGE-03-12, "10 CFR 50.46 Annual Notification and Reporting for 2002," March 2003.
- 3. CGE-05-20, "10 CFR 50.46 Annual Notification and Reporting for 2004," April 2005.
- 4. LTR-LIS-08-578, Revision 2, "Large Break LOCA Evaluation for V. C. Summer (CGE) Upflow Conversion and Assessment of Transverse Momentum Cells for Zero Cross-flow Boundary Condition Error," January 2009.
Notes:
None
Document Control Desk Attachment II LTD 321 RC-09-0050 Page 4 of 7 Westinghouse LOCA Peak Clad Temperature Summary for Best Estimate Large Break Plant Name: V. C. Summer Utility Name: South Carolina Electric & Gas Revision Date: 1/27/09 Reflood 1 Analysis Information EM: CQD (1996) Analysis Date: 2/3/03 Limiting Break Size: Guillotine FQ: 2.5 FdH: 1.7 Fuel: Vantage + SGTP (%): 10 Notes: Delta 75 Replacement Steam Generator Uprate Core Power 2900 MWt Clad Temp ('F) Ref. Notes LICENSING BASIS Analysis-Of-Record PCT 1808 1 PCT ASSESSMENTS (Delta PCT)
A. PRIOR ECCS MODEL ASSESSMENTS
- 1. Backfit Through 2001 Reporting Year 0 2
- 2. Revised Blowdown Heatup Uncertainty Distribution 5 3 B. PLANNED PLANT MODIFICATION EVALUATIONS
- 1. Fan Cooler Performance Increase 1 2 C. 2008 ECCS MODEL ASSESSMENTS
- 1. Transverse Momentum Cells for Zero Cross-flow Boundary Condition -9 4 Error D. OTHER
- 1. None 0 LICENSING BASIS PCT + PCT ASSESSMENTS PCT= 1805
References:
- 1. WCAP- 16043, "Best Estimate Analysis of the Large Break Loss of Coolant Accident for the Virgil C.
Summer Nuclear Station," June 2003.
- 2. CGE-03-12, "10 CFR 50.46 Annual Notification and Reporting for 2002," March 2003.
- 3. CGE-05-20, "10 CFR 50.46 Annual Notification and Reporting for 2004," April 2005.
- 4. LTR-LIS-08-578, Revision 2, "Large Break LOCA Evaluation for V. C. Summer (CGE) Upflow Conversion and Assessment of Transverse Momentum Cells for Zero Cross-flow Boundary Condition Error," January 2009.
Notes:
None
Document Control Desk Attachment II LTD 321 RC-09-0050 Page 5 of 7 Westinghouse LOCA Peak Clad Temperature Summary for Best Estimate Large Break Plant Name: V. C. Summer Utility Name: South Carolina Electric & Gas Revision Date: 1/27/09 Reflood 2 Analysis Information EM: CQD (1996) Analysis Date: 2/1/03 Limiting B]reak Size: Guillotine FQ: 2.5 FdH: 1.7 Fuel: Vantage + SGTP (%): 10 Notes: Delta 75 Replacement Steam Generator Uprate Core Power 2900 MWt Clad Temp ('F) Ref. Notes LICENSING BASIS Analysis-Of-Record PCT 1988 1 PCT ASSESSMENTS (Delta PCT)
A. PRIOR ECCS MODEL ASSESSMENTS
- 1. Backfit Through 2001 Reporting Year 0 2
- 2. Revised Blowdown Heatup Uncertainty Distribution 5 3 B. PLANNED PLANT MODIFICATION EVALUATIONS
- 1. Fan Cooler Performance Increase 2 2 C. 2008 ECCS MODEL ASSESSMENTS
- 1. Transverse Momentum Cells for Zero Cross-flow Boundary Condition -14 4 Error D. OTHER
- 1. None 0 LICENSING BASIS PCT + PCT ASSESSMENTS PCT = 1981
References:
- 1. WCAP- 16043, "Best Estimate Analysis of the Large Break Loss of Coolant Accident for the Virgil C.
Summer Nuclear Station," June 2003.
- 2. CGE-03-12, "10 CFR 50.46 Annual Notification and Reporting for 2002," March 2003.
- 3. CGE-05-20, "10 CFR 50.46 Annual Notification and Reporting for 2004," April 2005.
- 4. LTR-LIS-08-578, Revision 2, "Large Break LOCA Evaluation for V. C. Summer (CGE) Upflow Conversion and Assessment of Transverse Momentum Cells for Zero Cross-flow Boundary Condition Error," January 2009.
Notes:
None
Document Control Desk Attachment II LTD 321 RC-09-0050 Page 6 of 7 Westinghouse LOCA Peak Clad Temperature Summary for Appendix K Small Break Plant Name: V. C. Summer Utility Name: South Carolina Electric & Gas Revision Date: 1/27/09 Analysis Information EM: NOTRUMP Analysis Date: 9/12/06 Limiting Break Size: 3 Inch FQ: 2.4 FdH: 1.62 Fuel: Vantage + SGTP (%): 10 Notes:
Clad Temp ('F) Ref. Notes LICENSING BASIS Analysis-Of-Record PCT 1775 9 (a)
PCT ASSESSMENTS (Delta PCT)
A. PRIOR ECCS MODEL ASSESSMENTS
- 1. None 0 B. PLANNED PLANT MODIFICATION EVALUATIONS
- 1. None 0 C. 2008 ECCS MODEL ASSESSMENTS
- 1. None 0 D. OTHER
- 1. None 0 LICENSING BASIS PCT + PCT ASSESSMENTS PCT = 1775
References:
I. CGE-94-205, "South Carolina Electric and Gas Company, Virgil C. Summer Station, 10 CFR 50.46 Notification and Reporting Information," February 8, 1994.
- 2. CGE-94-228, "South Carolina Electric and Gas Company, Virgil C. Summer Station, SBLOCTA Axial Nodalization," October 27, 1994.
- 3. CGE-95-201, "South Carolina Electric and Gas Company, Virgil C. Summer Station, 10 CFR 50.46 Notification and Reporting Information," February 3, 1995.
- 4. CGE-96-202, "South Carolina Electric and Gas Company, Virgil C. Summer Station, 10 CFR 50.46 Annual Notification and Reporting," February 9, 1996.
- 5. CGE-96-213, "South Carolina Electric and Gas Company, Virgil C. Summer Station, 10 CFR 50.46 Small Break LOCA Notification and Reporting," July 8, 1996.
- 6. CGE-00-044, "South Carolina Electric and Gas Company, Virgil C. Summer Nuclear Station, 10 CFR 50.46 Appendix K (BART / BASH / NOTRUMP) Evaluation Model, Mid-Year Notification and Reporting for 2000," June 30, 2000.
- 7. CGE-03-80, "10 CFR 50.46 Mid-Year Notification and Reporting for 2003," January 2004.
- 8. LTR-LIS-06-344, "Transmittal of Updated V. C. Summer SBLOCA PCT Rackup Sheets," November 2006.
- 9. LTR-LIS-06-662, Transmittal of V. C. Summer SBLOCTA PCT Rackup Sheets for HHSI Throttle Valve Replacement," November 2006.
Document Control Desk Attachment II LTD 321 RC-09-0050 Page 7 of 7 Notes:
(a) The Rebaseline Analysis includes the impacts of the following model assessments:
1-LUCIFER Error Corrections (Ref. 1) 2-Effect of SI in Broken Loop (Ref. 1) 3-Effect of Improved Condensation Model (Ref. 1) 4-Axial Nodalization, RIP Model Revision and SBLOCTA Error Corrections Analysis (Ref. 2) 5-Boiling Heat Transfer Error (Ref. 3) 6-Steam Line Isolation Logic Error (Ref. 3) 7-NOTRUMP Specific Enthalpy Error (Ref. 4) 8-SALIBRARY Double Precision Error (Ref. 4) 9-SBLOCTA Fuel Rod Initialization Error (Ref. 5) 10-NOTRUMP Mixture Level Tracking / Region Depletion Errors (Ref. 6) 1I-NOTRUMP Bubble Rise / Drift Flux Model Inconsistency Corrections (Ref. 7) 12-Refined Break Spectrum (Ref. 8) 13-High Head Safety Injection (HHSI) Flow Increase (Ref. 9)