RBG-46103, March 2003 Monthly Operating Report for River Bend
| ML031060379 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 04/11/2003 |
| From: | King R Entergy Operations |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| G4.25, G9.5, RBF1-03-0064, RBG-46103 | |
| Download: ML031060379 (4) | |
Text
-Entergy Entergy Operations, Inc.
River Bend Station 5485 U S Highway 61 P 0 Box 220 St Francisville, LA 70775 Tel 225 336 6225 Fax 225 635 5068 Rick J. King Director Nuclear Safety Assurance April 11, 2003 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Subject:
Monthly Operating Report River Bend Station Docket No. 50-458 License No. NPF-47 File No.:
G9.5, G4.25 RBG-46103 RBF1 0064 Ladies and Gentlemen:
In accordance with River Bend Station Technical Specification 5.6.4, enclosed is the Monthly Operating Report for March 2003.
Sincerely, RJK/dhw enclosure
q-
Monthly Operating Report April 11, 2003 RBG-46103 RBFI 0064 Page 2 of 2 cc:
U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 NRC Senior Resident Inspector R-SB-14 INPO Records Center 700 Galleria Parkway Atlanta, GA 30339-3064 Mr. Jim Calloway Public Utility Commission of Texas 1701 N. Congress Ave.
Austin, TX 78711-3326 Dottie Sherman American Nuclear Insurers 29 South Main Street West Hartford, CT 06107
DOCKET NO. 50/458 RIVER BEND STATION DATE April 11,2003 COMPLETED BY Danny H. Williamson TITLE Sr. Licensing Specialist TELEPHONE 225-381-4279 PAGE 1
OF 2
OPERATING STATUS
- 1. REPORTING PERIOD:
March 2003
- 2. MAXIMUM DEPENDABLE CAPACITY (MWe-Net):
966
- 3. DESIGN ELECTRICAL RATING (MWe-Net):
966 MONTH YEAR TO CUMULATIVE DATE
- 4. NUMBER OF HOURS REACTOR WAS CRITICAL 380.0 1767.2 121,775.3
- 5. HOURS GENERATOR ON LINE 380.0 1750.8 118,096.2
- 6. UNIT RESERVE SHUTDOWN HOURS 0
0 0
- 7. NET ELECTRICAL ENERGY GENERATED (MWH) 310.788 1.594,171 105,659,547
PAGE 2
OF 2
UNIT SHUTDOWNS SHUTDOWN CAUSE I NUMBER DATE TYPE DURATION METHOD REASON CORRECTIVE ACTIONS 03-02 030316 S
364 hours0.00421 days <br />0.101 hours <br />6.018518e-4 weeks <br />1.38502e-4 months <br /> 2
C The plant was taken off line at 8:00 p.m. CST on March 16th for a refueling outage.
The outage was still in progress at the end of this reporting period.
LEGEND:
TYPE:
F - Forced S -Scheduled SHUTDOWN METHOD:
I -Manual 2 - Manual trip I scram 3 -Automatic trip 1 scram 4 - Continuation 5 - Other (explain)
REASON:
A - Equipment failure (explain)
B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator training / License Exam F -Administrative G - Operational error (explain)
H - Other (explain)
NOTES:
- 1. There were no challenges to the reactor safety relief valves in March.
<) et.
2
(,,
Danny H. Williamson