December 2002 Monthly Operating Report for River Bend Station
ML030160184
Person / Time
Site: River Bend Entergy icon.png
Issue date: 01/13/2003
From: King R
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
G4.25, G9.5, RBF1-03-0003, RBG-46057
Download: ML030160184 (4)


Text

-

Entergy Entergy Operations, Inc.

River Bend Station 5485 U S Highway 61 P 0 Box 220 St Francisville, LA 70775 Tel 225 336 6225 Fax 225 635 5068 Rick J King Director Nuclear Safety Assurance January 13, 2003 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Monthly Operating Report River Bend Station Docket No. 50-458 License No. NPF-47 File No.:

G9.5, G4.25 RBG-46057 RBF1-03-0003 Ladies and Gentlemen:

In accordance with River Bend Station Technical Specification 5.6.4, enclosed is the Monthly Operating Report for December 2002.

Sincerely, RJKedhl enclosure

/S'-

Monthly Operating Report January 13, 2003 RBG-46057 RBF1-03-0003 Page 2 of 2 cc:

U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 NRC Senior Resident Inspector R-SB-14 INPO Records Center 700 Galleria Parkway Atlanta, GA 30339-3064 Mr. Jim Calloway Public Utility Commission of Texas 1701 N. Congress Ave.

Austin, TX 78711-3326 Dottie Sherman American Nuclear Insurers 29 South Main Street West Hartford, CT 06107

DOCKET NO. 501458 RIVER BEND STATION DATE January 13, 2003 COMPLETED BY Danny H. Williamson TITLE Sr. Licensing Specialist TELEPHONE 225-381-4279 PAGE 1

OF 2

OPERATING STATUS

1. REPORTING PERIOD:

December 2002

2. MAXIMUM DEPENDABLE CAPACITY (MWe-Net):
3. DESIGN ELECTRICAL RATING (MWe-Net):

966

4.
5.
6.

7.

966 MONTH YEAR TO CUMULATIVE DATE NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 8632.7 120,008.2 HOURS GENERATOR ON LINE 744.0 8580.9 116,345.4 UNIT RESERVE SHUTDOWN HOURS 0

0 0

NET ELECTRICAL ENERGY GENERATED (MWH) 733,393 8,472,429 104,065,376

PAGE 2

OF 2

UNIT SHUTDOWNS SHUTDOWN CAUSE /

NUMBER DATE TYPE DURATION METHOD REASON CORRECTIVE ACTIONS (none)

LEGEND:

SHUTDOWN METHOD:

I - Manual 2 - Manual trip I scram 3 - Automatic trip I scram 4 - Continuation 5 - Other (explain)

REASON:

A - Equipment failure (explain)

B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator training I License Exam F - Administrative G - Operational error (explain)

H - Other (explain)

NOTES:

1. There were no challenges to the reactor safety relief valves in December.

Danny H. Williamson TYPE:

F - Forced S - Scheduled