RBG-46034, October 2002 Monthly Operating Report for River Bend

From kanterella
Jump to navigation Jump to search
October 2002 Monthly Operating Report for River Bend
ML023190288
Person / Time
Site: River Bend Entergy icon.png
Issue date: 11/11/2002
From: Leavines J
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
G4.25, G9.5, RBF1-02-0179, RBG-46034
Download: ML023190288 (4)


Text

SEntergy Entergy Operations, Inc River Bend Station 5485 U S Highway 61 P 0 Box 220 St Francisville, LA 70775 Tel 225 336 6225 Fax 225 635 5068 Rick J. King Director Nuclear Safety Assurance November 11, 2002 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Monthly Operating Report River Bend Station Docket No. 50-458 License No. NPF-47 File No.:

G9.5, G4.25 RBG-46034 RBF1-02-0179 Ladies and Gentlemen:

In accordance with River Bend Station Technical Specification 5.6.4, enclosed is the Monthly Operating Report for October 2002.

Sincerely, RJKedhw enclosure

I*j2i

Monthly Operating Report November 11, 2002 RBG-46034 RBF1-02-0179 Page 2 of 2 cc:

U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 NRC Senior Resident Inspector R-SB-14 INPO Records Center 700 Galleria Parkway Atlanta, GA 30339-3064 Mr. Jim Calloway Public Utility Commission of Texas 1701 N. Congress Ave.

Austin, TX 78711-3326 Dottie Sherman American Nuclear Insurers 29 South Main Street West Hartford, CT 06107

DOCKET NO. 50/458 RIVER BEND STATION DATE November 11, 2002 COMPLETED BY Danny H. Williamson TITLE Sr. Licensing Specialist TELEPHONE 225-381-4279 PAGE 1

OF 2

OPERATING STATUS

1. REPORTING PERIOD:

October 2002

2. MAXIMUM DEPENDABLE CAPACITY (MWe-Net):
3. DESIGN ELECTRICAL RATING (MWe-Net):

966 MONTH YEAR TO CUMULATIVE DATE

4. NUMBER OF HOURS REACTOR WAS CRITICAL 745.0 7168.7 118,544.2
5. HOURS GENERATOR ON LINE 745.0 7116.9 114,881.4
6. UNIT RESERVE SHUTDOWN HOURS 0

0 0

7. NET ELECTRICAL ENERGY GENERATED (MWH) 738,648 7,022,150 102,615,097 966

PAGE 2

OF 2

UNIT SHUTDOWNS SHUTDOWN CAUSE I NUMBER DATE TYPE DURATION METHOD REASON CORRECTIVE ACTIONS (none)

LEGEND:

SHUTDOWN METHOD:

I - Manual 2 - Manual trip I scram 3 - Automatic trip I scram 4 - Continuation 5 - Other (explain)

REASON:

A - Equipment failure (explain)

B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator training I License Exam F - Administrative G - Operational error (explain)

H - Other (explain)

1. There were no challenges to the reactor safety relief valves in October.

D,,qcA- --

Danny H. Williamson TYPE:

F - Forced S - Scheduled NOTES: