RBG-46034, October 2002 Monthly Operating Report for River Bend
| ML023190288 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 11/11/2002 |
| From: | Leavines J Entergy Operations |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| G4.25, G9.5, RBF1-02-0179, RBG-46034 | |
| Download: ML023190288 (4) | |
Text
SEntergy Entergy Operations, Inc River Bend Station 5485 U S Highway 61 P 0 Box 220 St Francisville, LA 70775 Tel 225 336 6225 Fax 225 635 5068 Rick J. King Director Nuclear Safety Assurance November 11, 2002 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
Subject:
Monthly Operating Report River Bend Station Docket No. 50-458 License No. NPF-47 File No.:
G9.5, G4.25 RBG-46034 RBF1-02-0179 Ladies and Gentlemen:
In accordance with River Bend Station Technical Specification 5.6.4, enclosed is the Monthly Operating Report for October 2002.
Sincerely, RJKedhw enclosure
I*j2i
Monthly Operating Report November 11, 2002 RBG-46034 RBF1-02-0179 Page 2 of 2 cc:
U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 NRC Senior Resident Inspector R-SB-14 INPO Records Center 700 Galleria Parkway Atlanta, GA 30339-3064 Mr. Jim Calloway Public Utility Commission of Texas 1701 N. Congress Ave.
Austin, TX 78711-3326 Dottie Sherman American Nuclear Insurers 29 South Main Street West Hartford, CT 06107
DOCKET NO. 50/458 RIVER BEND STATION DATE November 11, 2002 COMPLETED BY Danny H. Williamson TITLE Sr. Licensing Specialist TELEPHONE 225-381-4279 PAGE 1
OF 2
OPERATING STATUS
- 1. REPORTING PERIOD:
October 2002
- 2. MAXIMUM DEPENDABLE CAPACITY (MWe-Net):
- 3. DESIGN ELECTRICAL RATING (MWe-Net):
966 MONTH YEAR TO CUMULATIVE DATE
- 4. NUMBER OF HOURS REACTOR WAS CRITICAL 745.0 7168.7 118,544.2
- 5. HOURS GENERATOR ON LINE 745.0 7116.9 114,881.4
- 6. UNIT RESERVE SHUTDOWN HOURS 0
0 0
- 7. NET ELECTRICAL ENERGY GENERATED (MWH) 738,648 7,022,150 102,615,097 966
PAGE 2
OF 2
UNIT SHUTDOWNS SHUTDOWN CAUSE I NUMBER DATE TYPE DURATION METHOD REASON CORRECTIVE ACTIONS (none)
LEGEND:
SHUTDOWN METHOD:
I - Manual 2 - Manual trip I scram 3 - Automatic trip I scram 4 - Continuation 5 - Other (explain)
REASON:
A - Equipment failure (explain)
B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator training I License Exam F - Administrative G - Operational error (explain)
H - Other (explain)
- 1. There were no challenges to the reactor safety relief valves in October.
D,,qcA- --
Danny H. Williamson TYPE:
F - Forced S - Scheduled NOTES: