RBG-45979, May 2002 Monthly Operating Report for River Bend Station
| ML021700269 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 06/11/2002 |
| From: | King R Entergy Operations |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| RBF 1-02-0103, RBG-45979 | |
| Download: ML021700269 (4) | |
Text
a
~ En tergy Entergy Operations, Inc.
River Bend Station 5485 U.S. Highway 61 R 0. Box 220 St. Francisville, LA 70775 Tel 225 336 6225 Fax 225 635 5068 Rick J. King Director Nuclear Safety Assurance June 11, 2002 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555
Subject:
File No.:
Monthly Operating Report River Bend Station Docket No. 50-458 License No. NPF-47 G9.5, G4.25 RBG-45979 RBF1-02-0103 Ladies and Gentlemen:
In accordance with River Bend Station Technical Specification 5.6.4, enclosed is the Monthly Operating Report for May 2002.
Sincerely, RJKJdhw enclosure
Monthly Operating Report June 11, 2002 RBG-45979 RBF1-02-0103 Page 2 of 2 cc:
U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 NRC Senior Resident Inspector P. 0. Box 1050 St. Francisville, LA 70775 INPO Records Center 700 Galleria Parkway Atlanta, GA 30339-3064 Mr. Jim Calloway Public Utility Commission of Texas 1701 N. Congress Ave.
Austin, TX 78711-3326 Dottie Sherman American Nuclear Insurers 29 South Main Street West Hartford, CT 06107
DOCKET NO. 501458 RIVER BEND STATION DATE June 11, 2002 COMPLETED BY Danny H. Williamson TITLE Sr. Licensing Specialist TELEPHONE 225-381-4279 PAGE 1
OF 2
OPERATING STATUS
- 1. REPORTING PERIOD:
May 2002
- 2. MAXIMUM DEPENDABLE CAPACITY (MWe-Net):
966
- 3. DESIGN ELECTRICAL RATING (MWe-Net):
966 MONTH YEAR TO CUMULATIVE DATE
- 4. NUMBER OF HOURS REACTOR WAS CRITICAL 676.1 3555.1 114930.6
- 5. HOURS GENERATOR ON LINE 652.4 3531.4 111295.9
- 6. UNIT RESERVE SHUTDOWN HOURS 0
0 0
- 7. NET ELECTRICAL ENERGY GENERATED (MWH) 624,080 3,513,706 99,106,653
PAGE 2
OF 2
UNIT SHUTDOWNS SHUTDOWN CAUSE /
NUMBER DATE TYPE DURATION METHOD REASON CORRECTIVE ACTIONS 02-01 020512 S
91.6 hrs.
2 B
Planned outage to correct minor steam leaks contributing to unidentified drywell leakage LEGEND:
TYPE:
SHUTDOWN METHOD:
REASON:
F - Forced I - Manual A - Equipment failure (explain)
S - Scheduled 2 - Manual trip I scram B - Maintenance or Test 3 - Automatic trip / scram C - Refueling 4 - Continuation D - Regulatory restriction 5 - Other (explain)
E - Operator training I License Exam F - Administrative G - Operational error (explain)
H - Other (explain)
NOTES:
- 1. There were no challenges to the reactor safety relief valves in May.
Danny H. Williamson