RBG-42466, Documents Extension of Commitment Developed in Response to NRC Violation 9325-04
| ML20097F184 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 02/08/1996 |
| From: | James Fisicaro ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| RBF1-96-0045, RBF1-96-45, RBG-42466, NUDOCS 9602150303 | |
| Download: ML20097F184 (2) | |
Text
)
Entergy operations,Inc.
',e River Bend Station 5485 U S. Highway 61
= ENTERGY l # 22L w on5 Tel 504 336 6225
. Fax 504 635 5068 James J. Fisicaro Dwector Nucmar Safety February 8,1996 U. S. Nuclear Regulatory Commission Document Control Desk Mail Stop PI-37 Washington, DC 20555
Subject:
River Bend Station - Unit I Docket No. 50-458 Commitment Due Date Extension File No:
G9.5, G9.16 RBG-42466 RBF1-96-0045 Gentlemen:
This letter is being submitted to document the extension of a commitment developed in response to NRC Violation 9325-04. This issue was discussed with Mr. David Proulx of your office on February 7,1996.
NRC Violation 9325-04, example 7, concerned the repetitive failure of two radiation monitor flow switches. The associated commitment was to install a new design flow switch and was to be completed during Refueling Outage 6. The package is currently ready for implementation and is expected to be implemented within 60 days after plant startup from the outage.
If you have any questions or would like additional information, please call David Lorfing at (504) 381-4157.
Sincerely,
.M h L
JJF/RMM/kym l
60
- e;rnan i
0 9602150303 960208 PDR ADOCK 05000450 G
is
"' Commitment Due Date Extension Febrtfary"8,1996 RBG-42466 RBF1-96-0045 Page 2 of 2 cc:
U. S. Nuclear Regulatory. Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011
. NRC Sr. Resident Inspector P. O. Box 1051 -
St Francisville, L.A 70775 INPO Records Center
- 700 Galleria Parkway Atlanta, GA 30339-3064 Mr. C. R. Oberg Public Utility Commission of Texas 7800 Shoal Creek Blvd., Suite 400 North
- Austin, TX 78757 r
-