RBG-41155, Monthly Operating Rept for Dec 1994 for River Bend Station

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Dec 1994 for River Bend Station
ML20077S118
Person / Time
Site: River Bend Entergy icon.png
Issue date: 12/31/1994
From: James Fisicaro, Glueck D
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RBF1-95-0013, RBF1-95-13, RBG-41155, NUDOCS 9501230295
Download: ML20077S118 (6)


Text

-

q Ent:rgy Operations,Inc.

Arver Bend Station 5485 U.S Highway 61

' = ENTERGY l r*e" ""

u w5 Tel 504 336 6225 Fax 504 635 5(E8 James J. Fisicaro Director Nuclear Safety January 13,1995 l

U.S. Nuclear Regulatory Commission Document Control Desk M/S PI-37 Washington, DC 20555

Subject:

River Bend Station - Unit 1 Docket No. 50-458 i

Monthly Operating Report File No.:

G9.5, G4.25 REG-41155 RBF1-95-0013 Gentlemen:

In accordance with River Bend Station (RBS) Technical Specification 6.9.1.6, enclosed is the December 1994 Monthly Operating Report for RBS - Unit 1.

Sincerely, dg-6 Af KDG/jr i

enclosure 210hbb 9501230295 941231

~

DR ADOCK 050 g

./

I v

~

e 4

/

Decer$1ber 1994 Monthly Operating Report January 13,1995 RBG-41155 RBF1-95-0013 Page 2 of 2 cc:

U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 NRC Senior Resident Inspector P.O. Box 1051 l

St. Francisville, LA 70775 l

INPO Records Center 1100 Circle 75 Parkway Atlanta, GA 30339 l

Chester R. Oberg l

PUCT j

7800 Shoal Creek Blvd., Suite 400N Austin, TX 78757 Dottie Sherman American Nuclear Insurers 29 South Main Street West Hartford, CN 06107 Cajun Electric Power Co-op, Inc.

I u

=s

4 s

DOCKET NO. 50/458 RIVER BEND STATION UNIT 1 REPORT NO.

R-94-12 DATE January 10.1995 COMPLETED BY D. R. Glueck TITLE Senior Ennineer TELEPilONE 504-381-4317 MONTII December.1994 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER LEVEL POWER LEVEL (MWe-Net)

(MWe-Net) 1.

940.7 17.

924.4 2.

935.4 18.

942.0 3.

932.4 19.

940.5 4.

777.I 20.

937.8 5.

0 21.

936.8 6.

0 22.

938.9 7.

0 23, 936.5 8.

0 24, 940.9 9.

0 25.

941.0 10.

0 26.

940.8 11.

0 27.

939.5 12, 293.7 28.

936.5 x

13.

888.4 29, 936.0 14.

939.8 30.

929.3 I 5.

937.2 31.

913.6 16.

928.0

f M

i DOCKET NO. 50/458 RIVER BEND STATION UNIT 1 i

REPORT NO.

R-94-12 DATE January 10.1995 COMPLETED BY D. R. Glueck TITLE Senior Ennineer TELEPHONE-504-381-4317 L

PAGE 1

OF 2 OPERATING STATUS

1. REPORTING PERIOD: December 1994 GROSS IlOURS IN REPORTING PERIOD:

744

2. CURRENTLY AUTilORIZED POWER LEVEL (Mwt): 2894 MAX. DEPEND CAPACITY (MWe-Net): 926 DESIGN ELECTRICAL RATING (MWe-Net): 936 t
3. POWER LEVEL TO WillCli RESTRICTED (l!r ANY)(MWe-Net): N/A
4. REASONS FOR RESTRICTION (IF ANY): N/A i

THIS YR TO CUMU-MONTli DATE LATIVE

5. NUMBER OF 110URS REACTOR WAS CRITICAL 594.9 5684.3 56496.2
6. REACTOR RESERVE SIIUTDOWN IIOURS 0

0 0

7. IIOURS GENERATOR ON LINE 566.4 5457.7 53439.1 l
8. UNIT RESERVE SilUTDOWN llOURS 0

0 0

a

9. GROSS T11ERMAL ENERGY GENERATED (MWil) 1.605.590 15.373.344 143.073.013
10. GROSS ELECTRICAL ENERGY GENERATED (MWil) 553.365 5.218.447 48.382.055
11. NET ELECTRICAL ENERGY GENERATED (MWil) 518.572 4.886.231 45.275.732 i

DOCKET NO. 50/458 RIVER BEND STATION UNIT 1 REPORT NO.

R-94-12 DATE January 10.1995 COMPLETED BY D. R. Glueck TITLE Senior Eneineer TELEPHONE 504-381-4317 PAGE 2

OF 2

OPERATING STATUS tills YR TO CUMU-MONTII DATE LATIVE

12. REACTOR SERVICE FACTOR 80.0 64.9 70.7 13 REACTOR AVAILABILITY FACTOR 80.0 64.9 70.7
14. UNIT SERVICE FACTOR 76.1 62.3 68.4
15. UNIT AVAILABILITY FACTOR 76.1 62.3 68.4
16. UNIT CAPACITY FACTOR (USING MDC) 74.5 59.6 63.2
17. UNIT CAPACITY FACTOR (USING DESIGN MWe) 74.5 59.6 63.2
18. UNIT FORCED OUTAGE RATE 23.9 19.7 14.1
19. SIIUTDOWNS SCIIEDULED OVER NEXT SIX MONTIIS (TYPE, DATE, AND DURATION OF EACH):

NO SIIUTDOWNS SCIIEDULED OVER NEXT SIX MONTIIS

20. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

N/A

UNIT SHUTDOWNS AND POWER REDUCTIONS TIME TLME START RECOVER OF FROM DURATION TYPE REASON METHOD CORRECTIVE ACTION /

NO.

DATE OCCURR',NCE OCCURRENCE (HOURS)

NOTE (1) NOTE (2) NOTE (3)

COMMENTS FO 94-03 12-4-94 1958 12-12-94 0535 177.62 F

H 3

An automatic shutdown occurred when the isolation logic was satisfied and a full MSIV isolation occurred during the performance of STP 058-4501, Containment and Drywll ManualIsolation A tuation ChannelFuncuonalTest.

SUMMARY

NODI (1)

TYPE OF OCCURRENCE:

ENITIR CODE DOCKETNO. 50/458 F:

FORCED RIVER BEND STATION UNIT 1 S:

SCHEDULED NOTE (2)

PEASON FOR OCCURRENCE: ENTER CODE REPORT NO.

R-94-12 A:

EQUIPMENT FAILURE (EXPLAIN IN CORRECTIVE ACTIONS / COMMENTS)

B:

MALNTENANCE ORTEST REPORTMONTH December.1994 C:

REFUELING D:

REGULATORY RESTRICTION E:

OPERATORTRAINING AND LICENSE EXAMINATION DATE January 10.1995 F:

ADMINISTRATIVE G:

OPERATIONAL ERROR (EXPLAIN IN CORRECTIVE ACTIONC/ COMMENTS)

D. R. Glucck H:

OTHER (EXPLAIN IN CORRECTIVE ACTIONS / COMMENTS)

COMPLETED BY NOTE (3)

METHOD OF SHIJITING DOWN REACTOR OR REDUCING POWER:

ENTER ONE

'SIDNATURE 1.

MANUAL 2.

MANUAL SCRAM Senior Mech. Engineer 3.

AUTOMATIC SCRAM TTILE 4.

OTHER (EXPLAIN IN CORRECTIVE ACTION / COMMENTS)

(

TELEPHONE: 504-381-4317

~..

-