RBG-39198, Monthly Operating Rept for Sept 1993 for Rbs,Unit 1

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Sept 1993 for Rbs,Unit 1
ML20058P214
Person / Time
Site: River Bend Entergy icon.png
Issue date: 09/30/1993
From: James Fisicaro, Hendl G
GULF STATES UTILITIES CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RBG-39198, NUDOCS 9310220156
Download: ML20058P214 (5)


Text

>

t 1

  • B GULF STATES UTXLITIES COh7P22NY P 0 81 O F T I C l' BOX 220 sT.

F F1 A N C I S V ( L L 0 L O U t S i A P4 A 70775 A T2 i A CODE 504 636-3737 387-4267 October 15, 1993 RBG-39198 File Nos. G9.5, G4.25 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gemlemen:

River Bend Station - ' Unit 1 Docket No. 50-458 Pursuant to River Bend Station Technical Specification 6.9.1.6 enclosed is the September 1993 Monthly Operating Repon.

Sincerely, q

QU?rw h):isn.

g

' James J. Disicaro Manager - Safety Assessment and Quality Verification xc: U. S. Nuclear Regulatory Commission Chester R. Obert Region IV PUCT 611 Ryan Plaza Drive, Suite 400 7800 Shoal Creek Blvd.

Arlington, TX 7601i Suite 400N Austin, TX 78757 NRC Resident Inspector P. O. box 1051 Dottie Shennan St. Francisville, LA 70775 American Nuclear Insurers 29 South Main St.

INPO Records Center West Hartford, CN 06107 1100 Circle 75 Parkway Atlanta, GA 30339 Cajun Electric Power Co-Op, Inc.

22000 9310220156 930930 W

((2y f

PDR ADDCK 05000458 N

R PDR W

ll

l 4

DOCKET NO. 50/458'

-l

~

RIVER BEND STATI

  • iTNIT 1 REPORT NO.

R-93-09'

-l I/ ATE October 12,1993 COMPLETED BY.

G.- F. Hendl

-i TITLE Sr. Comoliance-Analyst TELEPHONE 504-381-4732 MONTII September 1993 9

DAY AVERAGE DAILY DAY AVERAGE DAILY -

l POWER LEVEL POWER LEVEL (MWe-Net)

(MWe-Net) 1.

0 17.

922 2.

27

18. '

919 l

1 3.

253 19.

880 4.

517 20.

917 5.

746 21.

915 6.

915 22.

915 7.

920-23.

916 9

8.

923 24.

913

+

9.

921

- 25.

918 10, 918 26.

920 1

1 11.

916 27, 928 r

12.

920 28.

931 i

f 13.

916 29.

927 14.

915 30.

926 l

15.

917 31.

N/A

+

16.

848 I

9 i

m-s

I DOCKET NO. 50/458 RIVER BEND STATION UNIT 1 REPORT NO.

R-93-09 DATE October 12,1993 COMPLETED HY G. F. Ilendl TITLE Sr. Complia nce Analyst TELEPIIONE 504-381-4732 PAGE I

OF 2 OPERATING STATIIS i

1. REPORTING PERIOD: September 1993 GROSS IlOURS IN REPORTING PERIOD:

720

2. CURRENTLY AUTIIORIZED POWER LEVEL (Mwt): 2894 MAX. DEPEND CAPACITY (MWe-Net): 93L6 i

DESIGN ELECTRICAL RATING (MWe-Net): 936

3. POWER LEVEL TO WillCII RESTRICTED (IF ANY)(MWe-Net): N/A
4. REASONS FOR RESTRICTION (IF ANY): N/A Tills YR TO CUMU-

[

MONTil DATE LATIVE l

5. NUMBER OF IIOURS REACTOR WAS CRITICAL 720 4,156.5 48,695.90
6. REACTOR RESERVE S!!UTDOWN llOURS 0

0 0

7. IIOURS GENERATOR ON LINE 680.1 3,983.1 45,886
8. UNIT RESERVE S11UTDOWN llOURS 0

0 0

i

9. GROSS TilERMAL ENERGY GENERATED (MWil) 1,867,555 10.827,246 121,917.236
10. GROSS ELECTRICAL ENERGY GENERATED (MWil) 627,793 3,654,086 41.195,656.

I1. NET ELECTRICAL ENERGY GENERATED (MWII) 586,022 3,417,207 38.548,837 l

l r

E

~

w i

i

.I DOCKET NO. 50/458 -

RIVER BEND STATION UNIT 1 REPORT NO.

-R-93-09

'l DATE October 12.1993 COMPLETED BY G. F. Hendi-TITLE Sr. Comah==ce Analyst -

l TELEPHONE 504-381-4732-PAGE 2

OF 2,

OPERATING STATUS f

THIS YR-TO

' CUMU-MONTH DATE LATIVE l

12. REACTOR SERVICE FACTOR 100 63.5 70.7 = a 13 REACTOR AVAILABILITY FACTOR 100 63.5 70.7'
14. UNIT SERVICE FACTOR 94.5 60.8-6813
15. UNIT AVAILABILITY FACTOR 94.5-60.8

'68.3

16. UNIT CAPACITY FACTOR (USING MDC) 87 55.7 62.8-i
17. UNIT CAPACITY FACTOR (USING DESIGN MWe) 87 55.7 62.8 C
18. UNIT FORCED OUTAGE RATE 5.5 36.9

-13.8

19. SHUTDOWNS SCIIEDULED OVER NEXT SIX MONTIIS (TYPE, DATE, AND DURATION OF EACH):

N/A l

20. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

N/A a

!.j e

~

UNIT SIIUTDOWNS AND POWER REDUCTIONS Tihm TINE START RECOVER OF FROM DURATION TYPE REASON hETHOD CORRECTIVE ACTION /

NO.

DATE OCCURRENCE OCCURRENCE (IIOURS)

NOTE (1)

NOTE (2)

NOTE (3)

COMMENTS b

93-07 8/10/93 2150 1552 546.1 F

G 3

SCRAM 93-01 DUE TO 9/2/93 MISAPPLIED PROBE ON EXTENDER CARD DURING FREQUENCY RESPONSE TEST OF *B" PRESSURE CONTROL LOOP FOR MAIN STEAM BYPASS SYSTEM.

j

SUMMARY

NOTE (1)

TYPE OF OCCURRENCE: ENTER CODE DOCKET NO. 50/458 F:

FORCED RIVER BEND STATION UNIT 1 S:

SCIIEDULED NOTE (2)

REASON FOROCCURRENCE: ENER CODE REPORT NO.

R-93-09 A:

EQUIPNENT FAILURE (EXPLAIN IN CORRECTIVE ACTIONS / COMMENTS)

B:

MAINTENANCE OR EST REPORT MONTil Scotember 1993 C:

REFUELING D:

REGULATORY RESTRICTION E:

OPERATOR TRAINING AND LICENSE EXAMINATION DATE October 12.1993 F:

ADMINISTRATIVE G:

OPERATIONAL ERROR (EXPLAIN IN CORRECTIVE ACTIONS / COMMENTS)

G. F. Hendl II:

OTHER(EXPLAIN IN CORRECTIVE ACTIONS / COMMENTS) iPL p D Y NOTE (3)

METilOD OF SHlTITING DOWN REACTOR OR REDUCING POWER-ENTER ONE Mr e7/3

'31GNATURE 1.

MANUAL 2.

MANUALSCRAM 3.

ALTFOMATIC SCRAM Sr. Compliance Analyst 4.

OTIIER (EXPLAIN IN CORRECTIVE ACTION /COMhENTS)

TITLE TELEPHONE: 504-381-4732

~k J

-