RBG-37907, Monthly Operating Rept for Nov 1992 for River Bend Station
| ML20126B096 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 11/30/1992 |
| From: | Hendl G, Odell W GULF STATES UTILITIES CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| RBG-37907, NUDOCS 9212210377 | |
| Download: ML20126B096 (5) | |
Text
<
5 -. -
CUEF STJkTES UTELITIES CODTPIANY
.w. wa ve x nm ana saw u nawsvut unuawam A% A t ODR 534 635 0094 346BM' December 15, 1992 RBG. 37907 File Nos. G9.5, G4.25 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Gentlemcn:
o River Bend Station - Unit 1 Docket No. 50458_
Gulf States Utilities Company has enciosed the November 1992 Monthly Operating Report for River Bend Station (RBS)- Unit 1. This report is submitted in accordance with RBS Technical Specification 6.9.1.6.
Sincerely, f'
,n
- f(,.
f}
W
\\ "
W.H. Odell-Manager - Oversight River Bend Nuclear Group ACZygO dAE/DNkJf g/kym OU cc:
U.5 Nuclear Regulatory Commission Chester R. Oberg Rib on IV PUCT i
61i Ryan Plaza Drive, Suit _e 400 7800 Shoal Creek Blvd.
Arlington, TX 76011 Suite 400N.
Austin, TX 78757-NRC Resident inspector P.O. Box 1051 Dottie Sherman St. Francisville, LA 70775 American Nuclear Insurers 29 South Main St.
INPO Records Center West Hartford, CN 06107 1100 Circle 75 Parkway Atlanta, GA 30339 Cajun Electric Power Coop, Inc.
e 9212210377 921130
)-
PDR ADOCK 05000458
/, F g 4
si R
PDR_
f l
4-DOCKET NO. 50/458 RIVER BEND STATION UNIT 1 REPORT NO.
E-L2-11 DATE D_Scember 11, 1932 COMPLETED BY G.
F.
Hendl TITLE Sr. Complipnce Annivat TELEPHONE 504-331-4732 MONTH NOVEMBJR. 1992_
DAY AVERAGE DAILY DAY AVERAGE DAILY-POWER LEVEL POWER LEVEL (MWe-Net)
(MWe-Ne t) 1.
925 17.
16 2.
922 18.
0 3.
918 19.
0 4.
931 20.
0 5.
-934
- 21. -
0 6.
931 22.
193 7.
933 23.
639 S.
933 24.
33 9.
929 25.
0 10.
858 26.
0
-11.
914 27.
407 12.
926 28.
927 13.
929 29.
930
'14.
932 30.
928 15, 931' 31.
N/A 16. -
896 i
n 2:
DOCKET NO. 50/458 RIVER BEND STATION UNIT 1 REPOkT NO.
R-92-11 DATE December 11, 1992 COMPLETED BY G.
F. Hendl TITLE Sr. ComD11ance Analyst TELEPHONE 504-381-4732 PAGE 1
OF 2
OPERATING STATGS 1.
REPORTING PERIOD: November. 1992 GROSS HOURS IN REPORTING PERIOD:
720 2.
CURRENTLY AUTHORIZED POWER LEVEL (Mwt):
2894 MAX.
DEPEND CAPACITY (MWe-Net):
M DESIGN ELECTRICAL RATING (MWe-Net):
M
-3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net):
N/A 4.
REASONS FOR RESTRICTION (IF ANY):
N/A THIS YR TO MONTH DATE CUMULATIVE 5.
NUMBER OF HOURS REACTOR WAS CRITICAL.
608.2 2.913.7 43.965.84 0
0 0
6.
REACTOR RESERVE SHUTDOWN HOURS.....
7.
HOURS GENERATOR ON LINE 520 0 2.662.9 41.354.68 8.
UNIT RESERVE SHUTDOWN HOURS 0
0 0
9.
GROSS THERMAL ENERGY GENERATED (MWH).
1.440.982 7.238.178 109.557.601
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 483.310 2.432,144 37.021.643
- 11. NET ELECTRICAL ENERGY GENERATED (MWH) 452,268 2.276.027 34.644.979 i
DOCKET NO. 50/458 RIVER BEND STATION UNIT 1 REPORT NO.
B-92-11 DATE December 11, 1992 COMPLETED BY G.
F.
Hendl TITLE Er. Compliance Analyst TELEPHONE 104-381-4732 PAGE 2
OF _2_
OPEPATING STATUS THIS YR TO CUMU-
. MONTH DATE LATIVE
- 12. REACTOR SERVICE FACTOR.
84.5 3 6. 2__
71.4
- 13. REACTOR AVAILABILITY FACTOR 84.5 36.2
-71.4
- 14. UNIT SERVICE FACTOR 72.2 33.1 69.1
- 15. UNIT AVAILABILITY FACTOR.
72.2 33.1 69.1
- 16. UNIT CAPACITY FACTOR (Using MDC).
67.1 30.2 63.5
- 17. UNIT CAPACITY FACTOR (Using Design MWe) 67.1-30.2 63.5
- 18. UNIT FORCED OUTAGE RATE.........
12.3 25.6 10.2-
- 19. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS '(TYPE, DATE, AND DURATION OF EACH) :
N/A.
I
- 20. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
l N/A l
l-o I
m..
~
UNIT SHUTDOWNS AND POWER REDUCTIONS
v TIME TIME START RECOVER OF FROM DURATION TYPE REASON METHOD NO.
DATE OCCURRENCE OCCURRENCE (HOURS)
NOTE (1)
NOTE (2)
NOTE (3)
CORRECTIVE ACTION / COMMENT.S 92-05 11/17/92 0321 11/22/92 127.3 S
A 2
Allow pump down of under-1038 vessel sump after' DFR pump A&B priming loss; troubleshoot and repair.
92-06 11/24/92 0054 11/27/92 72.7 F
A 3
Rx pressure spike from 0137 Main Steam A & B Bypass valve pressure regulator mismatch; troubleshoot and repair.
SUMMARY
NOTE (1)
. TYPE OF OCCURRENCE:
ENTER CODE DOCKET NO. 50/458 F:
FORCED RIVER BEND STATION UNIT 1 S
SCHEDULED NOTE (2)
REASON FOR OCCURRENCE:
ENTER CODE REPORT NO.
R-92-11 A:
EQUIPMENT' FAILURE (EXPLAIN IN CORRECTIVE ACTIONS / COMMENTS)
B:
MAINTENANCE OR TEST REPORT MONTH NOVEMBER, 1992 C:
R2 FUELING D:
REGULATORY RESTRICTION E:
OPERATOR TRAINING AND LICENSE EXAMINATION DATE December 11a_JS92
.F:
ADMINISTRATIVE G:
OPERATIONAL ERROR (EXPLAAN IN CORRECTIVE ACTIONS / COMMENTS)
G.
F. Hendl H
OTHER-(EXPLAIN IN CORRECTIVE TCTIONS/ COMMENTS)
COMPLETED *BY-.
~
i eW/
l
- / / -
NOTE (3)
METHOD OF SHOTTING.DOWN REACTOR OR REDUCING POWER:
ENTER ONE s
rr 1.
MANUAL SIGNATURE 2.
MANUAL SCRAM 3.
AUTOMATIC SCRAM Sr. C_omp_1_iance Analy_s_t_
4.
OTHER (EXPLAIN IN CORRECTIVE ACTION / COMMENTS)
TITLE TELEPHONE 504-381-47_3_2_