RBG-22812, Monthly Operating Rept for Nov 1985

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1985
ML20137U465
Person / Time
Site: River Bend 
Issue date: 11/30/1985
From: Booker J, Fredieu A, Simmons J
GULF STATES UTILITIES CO.
To: Scroggins R
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
R-85-004, R-85-4, RBG-22812, NUDOCS 8602190203
Download: ML20137U465 (5)


Text

_ _ _

UNIT SHUTDOWNS AND POWER REDUCTIONS i

TIME TI6E START REC 0VER OF FROM DURATION TYPE REASON METHOD NO DATE OCCURANCE OCCURANCE (HOURS)

NOTE (1)

NOTE (2)

NOTE (3)

CORRECTIVE ACTIONS / COMMENTS

  • Due to Stby Svce Wtr being 85-01 11/14/85 0000 1438 86h/38m F
  • A, E
    • 2 (4) declared Inop due to structural 11/17/85 support problems / work completed.

A 3

purposes.

11/21/85

      • Failure to range up IRM's in a timely manner.

85-03 11/28/85 1844 0025 53h/ 41m F

      • G 3

12/01/85

SUMMARY

NOTE (1) TYPE OF OCCURANCE:

ENTER CODE DOCKET NO. 50/458 F:

FORCFD RIVER BEND STATION UNIT 1 S: SCHEDULED REPORT NO.

R-85-004 NOTE (2) REASON FOR OCCURANCE: ENTER CODE A:

EQUIPMENT I AILURE (EXPLAIN IN CORRECTIVE ACTIONS /COPNENTS)

REPORT MONTH Navember 1985 B: MAINTENANCE OR TEST C: REFUELING DATE 12/10/85 D:

REGULATORY RESTRICTION E: OPERATOR TRAINING AND LICENSE EXAMINATION Anthony O. Fredieu F: ADMINISTRATIVE COMPLLIED BY (PRINT)

G: OPERATIONAL ERROR (EXPLAIN IN CORRECTIVE ACTI6NS/ COMMENTS)

H: 0THER (EXPLAIN IN CORRECTIVE ACTIONS / COMMENTS)

,_., O k,vi s N.

~

gSIORTURE NOTE (3) METHOD OF SHUTTING DOWN REACTOR OR REDUCING POWER: ENTER CODE Y

1: MAN"AL B602190203 851130 Assistant Operations Supervisor ADOCK O 4]B 2: MANUAL SCRAM

{DR TITLE N

3: AUTOMATIC SCRAM

?

4: OTHER (EXPLAIN IN CORRECTIVE ACTIONS / COMMENTS)

TELEPHONE 635-6094 X2557 FORM-50M-024 REV. 0

DOCKET N0. 50/458 RIVER BEND STATION UNIT 1 REPORT N0.

R-85-004 DATE 12/10/85

()

COMPLETED BY A.O. Fredieu tej@pi_,

TITLE Asst. Ops. Super /

TELEPHONE 635-6094 X2557 MONTH November 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1.

0 17.

0 2.

0 18.

0 3.

0 19.

O i

4.

0 20.

0 5.

0 21.

0 6.

0 22.

0 7.

0 23.

0 8.

0 24.

0 9.

0 25.

0 10.

0 26.

0 11.

0 27.

0 12.

0 28.

0 13.

0 29.

0 14.

0 30.

0 15.

0 31.

16.

0

'f f

O a

-.-,,,.-,...-.---..,-_.-,.,-.--.-....-,__-~,-,,_-..__--__-.-_,_-..,--_,..---_m._

DOCKET NO.

50/458 RIVER BEND STATION UNIT 1 REPORT NO.

R-85-004 DATE 12-03-85 COMPLETED BY Jef f sianonsa pff TITLE Reactor Engineer TELEPHONE (504) 635-6094 x-2315 Page 1 of 2 Attachment III OPERATING STATUS 0000 2400 1.

REPORTING PERIOD: 11-1-85 11-30-85GROSS HOURS IN REPORTING PERIOD:

720 2.

CURRENTLY AUTHORIZED POWER LEVEL (Mwt):

2894 MAX.

DEPEND. CAPACITY (MWe-Net):

0 DESIGN ELECTRICAL RATING (MWe-Net):

936 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY) (.We-Net):

N/A 4.

REASONS FOR RESTRICTION (IF ANY): N/A THIS YR TO CUMU-MONTH DATE LATIVE 5.

SUMBER OF HOURS REACTOR WAS CRITICAL... 568.8 589.4 589.4 6.

REACTOR RESERVE SHUTDOWN HOURS..........

O

__ 0 0

7.

HOURS GENERATOR ON LINE................

n 0

0 8.

UNIT RESERVE SHUTDOWN HOURS............

0 0

0 9.

GROSS THERMAL ENERGY GENERATED (MWH)... 24,992.5* 24,992.5 24,992.5 10.

GROSS ELECTRICAL ENERGY GENERATED (MWH).

0 0

0 11.

NET ELECTRICAL ENERGY GENERATED (MWH)...

n n

0

  • Based on average APRM readings and corrected for 20% conservatism in APRM gains.

DOCKET NO.

50/458 RIVER BEND STATION UNIT 1 REPORT NO.

R-85-004 PAGE 2

0F 2

OPERATING STA'IUS THIS YR TO CUMU-MONTH DATE LATIVE 12.

REACTOR SERVICE FACTOR........... N/A N/A N/A 13.

REACTOR AVAILABILITY FACTOR...... N/A N/A N/A 14.

UNIT SERVICE FACTOR.............. N/A N/A N/A 15.

UNIT AVAILABILITY FACTOR......... N/A N/A N/A 16.

UNIT CAPACITY FACTOR (Using MDC).. N/A N/A N/A 17.

UNIT CAPACITY FACTOR (Using Design MWe)

...................... N/A N/A N/A 18.

UNIT FORCED OUTAGE RATE...........

N/A N/A N/A 19.

SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

01-03-86 from 25% power, shutdown from outside control room, 3 days IF SHUTDOWN AT"END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

20.

' /A 21.

UNITS IN TEST STATUS (PRIOR TO COMMERICAL OPERATIC.N):

FORECAST ACHIEVED INITIAL CRITICALITY N/A 10-31-85 0037 i

INITIAL ELECTRICITY N/A 12-03-85 0344 COMMERCIAL OPERATION N/A

    • Iatest expected completion of 100% power testing 03-31-86.

?

eg GULF STATES UTILITIES COMPANY RIVER BEND STATION POST OFf6CE BOX 220 ST FRANCISVILLE. LOUISIANA 70775 AREA CODE 504 635 6094 346 8651 December 13, 1985 RBG-22812 File Nos. G9.5, G9.25.1.5 Mr. Ronald M.

Scroggins Director, Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D. C.

20555

Dear Mr. Scroggins:

River Bend Station - Unit 1 Docket No. 50-458 Please find enclosed three (3) copies of Gulf States Utilities Company's Monthly Operating Report for

November, 1985 for River Bend Station

- Unit 1.

This r3 port is submitted in accordance with Technical Specifications 6.9.1.6.

Sincerely,

/

L p J.

E.

Booker Manager-Engineering, Nuclear Fuels & Licensing River Bend Nuclear Group JNk 55d JEB/WJR/ ERG /dEH/amg Enclosure cc: Regional Administrator U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 fd U.S. NRC Document Contr.al Desk

-