RBG-22812, Monthly Operating Rept for Nov 1985
| ML20137U465 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 11/30/1985 |
| From: | Booker J, Fredieu A, Simmons J GULF STATES UTILITIES CO. |
| To: | Scroggins R NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| References | |
| R-85-004, R-85-4, RBG-22812, NUDOCS 8602190203 | |
| Download: ML20137U465 (5) | |
Text
_ _ _
UNIT SHUTDOWNS AND POWER REDUCTIONS i
TIME TI6E START REC 0VER OF FROM DURATION TYPE REASON METHOD NO DATE OCCURANCE OCCURANCE (HOURS)
NOTE (1)
NOTE (2)
NOTE (3)
CORRECTIVE ACTIONS / COMMENTS
- Due to Stby Svce Wtr being 85-01 11/14/85 0000 1438 86h/38m F
- A, E
- 2 (4) declared Inop due to structural 11/17/85 support problems / work completed.
- Manual Scram for training 85-02 11/21/85 0122 0947 8h/25m F
A 3
purposes.
11/21/85
- Failure to range up IRM's in a timely manner.
85-03 11/28/85 1844 0025 53h/ 41m F
- G 3
12/01/85
SUMMARY
NOTE (1) TYPE OF OCCURANCE:
ENTER CODE DOCKET NO. 50/458 F:
FORCFD RIVER BEND STATION UNIT 1 S: SCHEDULED REPORT NO.
R-85-004 NOTE (2) REASON FOR OCCURANCE: ENTER CODE A:
EQUIPMENT I AILURE (EXPLAIN IN CORRECTIVE ACTIONS /COPNENTS)
REPORT MONTH Navember 1985 B: MAINTENANCE OR TEST C: REFUELING DATE 12/10/85 D:
REGULATORY RESTRICTION E: OPERATOR TRAINING AND LICENSE EXAMINATION Anthony O. Fredieu F: ADMINISTRATIVE COMPLLIED BY (PRINT)
G: OPERATIONAL ERROR (EXPLAIN IN CORRECTIVE ACTI6NS/ COMMENTS)
H: 0THER (EXPLAIN IN CORRECTIVE ACTIONS / COMMENTS)
,_., O k,vi s N.
~
gSIORTURE NOTE (3) METHOD OF SHUTTING DOWN REACTOR OR REDUCING POWER: ENTER CODE Y
1: MAN"AL B602190203 851130 Assistant Operations Supervisor ADOCK O 4]B 2: MANUAL SCRAM
{DR TITLE N
?
4: OTHER (EXPLAIN IN CORRECTIVE ACTIONS / COMMENTS)
TELEPHONE 635-6094 X2557 FORM-50M-024 REV. 0
DOCKET N0. 50/458 RIVER BEND STATION UNIT 1 REPORT N0.
R-85-004 DATE 12/10/85
()
COMPLETED BY A.O. Fredieu tej@pi_,
TITLE Asst. Ops. Super /
TELEPHONE 635-6094 X2557 MONTH November 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1.
0 17.
0 2.
0 18.
0 3.
0 19.
O i
4.
0 20.
0 5.
0 21.
0 6.
0 22.
0 7.
0 23.
0 8.
0 24.
0 9.
0 25.
0 10.
0 26.
0 11.
0 27.
0 12.
0 28.
0 13.
0 29.
0 14.
0 30.
0 15.
0 31.
16.
0
'f f
O a
-.-,,,.-,...-.---..,-_.-,.,-.--.-....-,__-~,-,,_-..__--__-.-_,_-..,--_,..---_m._
DOCKET NO.
50/458 RIVER BEND STATION UNIT 1 REPORT NO.
R-85-004 DATE 12-03-85 COMPLETED BY Jef f sianonsa pff TITLE Reactor Engineer TELEPHONE (504) 635-6094 x-2315 Page 1 of 2 Attachment III OPERATING STATUS 0000 2400 1.
REPORTING PERIOD: 11-1-85 11-30-85GROSS HOURS IN REPORTING PERIOD:
720 2.
CURRENTLY AUTHORIZED POWER LEVEL (Mwt):
2894 MAX.
DEPEND. CAPACITY (MWe-Net):
0 DESIGN ELECTRICAL RATING (MWe-Net):
936 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (.We-Net):
N/A 4.
REASONS FOR RESTRICTION (IF ANY): N/A THIS YR TO CUMU-MONTH DATE LATIVE 5.
SUMBER OF HOURS REACTOR WAS CRITICAL... 568.8 589.4 589.4 6.
REACTOR RESERVE SHUTDOWN HOURS..........
O
__ 0 0
7.
HOURS GENERATOR ON LINE................
n 0
0 8.
UNIT RESERVE SHUTDOWN HOURS............
0 0
0 9.
GROSS THERMAL ENERGY GENERATED (MWH)... 24,992.5* 24,992.5 24,992.5 10.
GROSS ELECTRICAL ENERGY GENERATED (MWH).
0 0
0 11.
NET ELECTRICAL ENERGY GENERATED (MWH)...
n n
0
DOCKET NO.
50/458 RIVER BEND STATION UNIT 1 REPORT NO.
R-85-004 PAGE 2
0F 2
OPERATING STA'IUS THIS YR TO CUMU-MONTH DATE LATIVE 12.
REACTOR SERVICE FACTOR........... N/A N/A N/A 13.
REACTOR AVAILABILITY FACTOR...... N/A N/A N/A 14.
UNIT SERVICE FACTOR.............. N/A N/A N/A 15.
UNIT AVAILABILITY FACTOR......... N/A N/A N/A 16.
UNIT CAPACITY FACTOR (Using MDC).. N/A N/A N/A 17.
UNIT CAPACITY FACTOR (Using Design MWe)
...................... N/A N/A N/A 18.
UNIT FORCED OUTAGE RATE...........
N/A N/A N/A 19.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
01-03-86 from 25% power, shutdown from outside control room, 3 days IF SHUTDOWN AT"END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
20.
' /A 21.
UNITS IN TEST STATUS (PRIOR TO COMMERICAL OPERATIC.N):
FORECAST ACHIEVED INITIAL CRITICALITY N/A 10-31-85 0037 i
INITIAL ELECTRICITY N/A 12-03-85 0344 COMMERCIAL OPERATION N/A
- Iatest expected completion of 100% power testing 03-31-86.
?
eg GULF STATES UTILITIES COMPANY RIVER BEND STATION POST OFf6CE BOX 220 ST FRANCISVILLE. LOUISIANA 70775 AREA CODE 504 635 6094 346 8651 December 13, 1985 RBG-22812 File Nos. G9.5, G9.25.1.5 Mr. Ronald M.
Scroggins Director, Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D. C.
20555
Dear Mr. Scroggins:
River Bend Station - Unit 1 Docket No. 50-458 Please find enclosed three (3) copies of Gulf States Utilities Company's Monthly Operating Report for
- November, 1985 for River Bend Station
- Unit 1.
This r3 port is submitted in accordance with Technical Specifications 6.9.1.6.
Sincerely,
/
L p J.
E.
Booker Manager-Engineering, Nuclear Fuels & Licensing River Bend Nuclear Group JNk 55d JEB/WJR/ ERG /dEH/amg Enclosure cc: Regional Administrator U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 fd U.S. NRC Document Contr.al Desk
-