RBG-22-381, Monthly Operating Rept for Sept 1985
| ML20138B218 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 09/30/1985 |
| From: | Booker J, Stuart W GULF STATES UTILITIES CO. |
| To: | Scroggins R NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| References | |
| R-85-002, R-85-2, RBG-22-381, NUDOCS 8512120244 | |
| Download: ML20138B218 (5) | |
Text
_
DOCKET NO.
50/458 s
RIVER BEND STATION UNIT 1 REPORT No. R-85-002 PAGE 2
op 2
OPERATING STATUS ATTACHMENT III THIS YR TO CUMU-MONTH DATE LATIVE 12.
REACTOR SERVICE FACTOR.
N/A' 13.
REACTOR AVAILABILITY FACTOR N/A 14.
UNIT SERVICE FACTOR.
N/A 15.
UNIT AVAILABILITY FACTOR.
N/A 16.
UNIT CAPACITY FACTOR (Using MDC)
N/A 17.
UNIT CAPACITY FACTOR (Using Design.
N/A MWe) 18.
UNIT FORCED OUTAGE RATE.
N/A
' 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
- 20.
IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 10/25/85 21.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY 10/25/85 INITIAL ELECTRICITY 11/09/85 COMMERCIAL OPERATION
- 1.
11/21/85 from 20% power, shutdown from outside control room, 3 day outage.
2.
12/07/85 from 35% power, scram LOOSP, 3 day outage.
3.
01/23/86 plan scram from 100% power, 5 day outage.
4.
02/24/86 scram after completion of 100% testing run.
- Earliest completion of 100% power testing 12/25/85.
Latest expected completion of 100% power testing 03/21/86.
(
h2120244850930 t
p ADOCK 05000458
'\\- '
\\x
F'
'0 DOCKET NO.
50/458 RIVER BEND STATION UNIT 1 REPORT NO.
R-85-002 DATE 10/07/85 COMPLETED BY W; S.
Stuart TITLE Reactor Engineer TELEPHONE (504)635-6094, Ext. 236 ;
Page 1 of 2 Attachment III OPERATING STATUS 0000 2400 1.
REPORTING PERIOD: 9/1/85 9/30/85 GROSS HOURS IN REPORTING PERIOD: 720 Hours 2.
CURRENTLY AUTHORIZED POWER LEVEL (Mwt):
144 7 MAX. DEPEND. CAPACITY (MWe-Net):
0 DESIGN ELECTRICAL RATING (MWe-Net):
936 3.
POWER LEVEL TO WHICH RESTRICTED.(IF ANY) (MWe-Net):
N/A 4.
REASONS FOR RESTRICTION (IF ANY):
N/A THIS YR TO CUMU-MONTH DATE LATIVE 5.
NUMBER OF HOURS REACTOR WAS CRITICAL.
0 0
0 6.
REACTOR RESERVE SHUTDOWN HOURS.
0 0
0 7.
HOURS GENERATOR ONLINE 0
0 0
8.
UNIT RESERVE SHUTDOWN HOURS 0
0 0
9.
GROSS THERMALENERGY GENERATED (MWH) 0 0
0
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH).0 0
0
- 11. NET ELECTRICAL ENERGY GENERATED (MWH).
0 0
0
4 DOCKET NO. 50/458 RIVER BEND STATION UNIT 1 REPORT N0.
R-85-002 DATE
/o-f.5-&6 COMPLETED BY C.P. Bogolin TITLE Operations suaer TELEPHONE 635-6094 X2553 MONTH September 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1.
0 17.
0 2.
0 18.
0 3.
0 19.
0 4.
0 20.
0 5.
0 21.
0 6.
0 22.
0 7.
0 23.
0 8.
0 24.
0 9.
0 25.
0 10.
0 26.
0 11.
0 27.
0 12.
0 28.
0 13.
0 29.
0 14.
0 30.
O 15.
0-31.
N/A 16.
0 1
} ;'
,8
s UNIT SHUTDOWNS AND POWER REDUCTIONS TIME TIME START-REC 0VER 0F FROM DURATION TYPE REASON METHOD I
DATE OCCURANCE OCCURANCE (HOURS)
NOTE (1)
NOTE (2)
NOTE (3)
CORRECTIVE ACTIONS / COMMENTS NO
SUMMARY
- None - Unit has not reached initial criticality.
NOTE (1) TYPE OF OCCURANCE:
ENTER CODE DOCKET NO. 50/458 F:
FORCED RIVER BEND STATION UNIT I S: SCHEDULED REPORT N0. R-85-002
+
NOTE (2) REASON FOR OCCURANCE:
ENTER CODE A:
EQUIPMENT FAILURE (EXPLAIN IN CORRECTIVE ACTIONS / COMMENTS)
REPORT MONTH September 1985 B: MAINTENANCE OR TEST C:
REFUELING DATE
/d-/J-Bf-D:
REGULATORY RESTRICTION E: OPERATOR TRAINING AND LICENSE EXAMINATION C.P. Bogolin F: ADMINISTRATIVE COMPLETED BY RINT)
G: OPERATIONAL ERROR (EXPLAIN IN CORRECTIVE ACTIONS / COMMENTS) jg H: OTHER (EXPLAIN IN CORRECTIVE ACTIONS / COMMENTS)
/. r-NOTE (3) METHOD OF SHUTTING D0WN REACTOR OR REDUCING POWER:
ENTER CODE 1: MANUAL Operations Supervisor 2: MANUAL SCRAM TITLE 1
3: AUTOMATIC SCRAM.
4: OTHER (EXPLAIN.IN CORRECTIVE ACTIONS / COMMENTS)
TELEPHONE 635-6094 X2558 FORM-50M-024 REV. O i
e 7
' as e
afs' GULF STATES UTILITIES COMPANY RIVEH BEND STATION POST OFFICE BOX 220 ST FRANCISVILLE. LOUISIANA 70775 AREA CODE 504 635 6094 34 & 8651 October 15, 1985 RBG-22,381 File Nos. G9.5, G9.25.1.5 Mr. Ronald M.
Scroggins Director, Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Scroggins:
River Bend Station - Unit 1 Docket No. 50-458 Please find enclosed three (3) copies of Gulf States Utilities Company's Monthly Operating Report for September, 1985 for River. Bend Station
- Unit 1.
This report is submitted in accordance'with Technical Specification 6.9.1.6.
Sincerely, fb 4b y J. E.
Booker Manager-Engineering, Nuclear Fuels & Licensing River Bend Nuclear Group JEB/ER/h!N/je Enclosure cc: Regional Administrator U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 U. S. NRC Document Control Desk ps4