PY-CEI-NRR-1358, Forwards Perry Power Plant Simulation Facility Certification
| ML20077G622 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 06/28/1991 |
| From: | Lyster M CENTERIOR ENERGY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20077G624 | List: |
| References | |
| PY-CEI-NRR-1358, NUDOCS 9107020101 | |
| Download: ML20077G622 (1) | |
Text
..
_. _ _. _ _ _ __. ~ _ _.... -
3' gy
.s ERRY NUOLEAR POWER PLANT it ss:
Michael D, Lyster PERRY, OHIO 44081 VICE PRESIDENT. NUCtE AR t
Y, H10 4 081 (216) 054 3737 n
8 June 28, 1991 PY-CEI/NRR-1358 L U.S Nuclear Regulatory Commission Docunent Control Desk Washington, D.C.
20555 Perry Nuclear Power Plant Docket No. 50-440 Submittal of NRC Form 474,
Sitaulation Facility Certifi, cation" Centlemen Pursuant to 10CFR55.45(b)(5)(i), we are hereby cub'mitting NRC Form 474,
" Simulator Facility Certification" along with the following supporting document.atian for certificatton of Perry Nuclear Power Plant's new simulation facility: ' lab A - Certification Overview, Tab B - Exceptiont to ANS 3.5, Tab C - Simulexor Tests, a description of performance testing completed for the f acility as regaieed by 10CFR55.45(b)(5)(vi), and Tab D - Four Year Test Schedule, a schedule for the conduct of approximately 25% of the performance tests per year for the subsequent four years as required by 10CFR55.45(b)(5)(vi).
If you have any questions, please feel free to call.
Sinceriz,.
b n
t s
L Michael D. Lyster Attachment MDL:CJF:sc cc: USNRC, Director, Office of NRR l
USNRC Project Manager USNRC Resident Inspector l
USNRC Region III l
i O
{, { ' pasq crw n o
r e"c i we'<c 9107020101 910628
,l i
PDR ADOCK 05000440
_.__.P_,_
,_._ _ _. _ __.,_. _ _, _,_.___._._,_ _., __ _.~