PY-CEI-NRR-1358, Forwards Perry Power Plant Simulation Facility Certification

From kanterella
Jump to navigation Jump to search
Forwards Perry Power Plant Simulation Facility Certification
ML20077G622
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 06/28/1991
From: Lyster M
CENTERIOR ENERGY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20077G624 List:
References
PY-CEI-NRR-1358, NUDOCS 9107020101
Download: ML20077G622 (1)


Text

..

_. _ _. _ _ _ __. ~ _ _.... -

3' gy

.s ERRY NUOLEAR POWER PLANT it ss:

Michael D, Lyster PERRY, OHIO 44081 VICE PRESIDENT. NUCtE AR t

Y, H10 4 081 (216) 054 3737 n

8 June 28, 1991 PY-CEI/NRR-1358 L U.S Nuclear Regulatory Commission Docunent Control Desk Washington, D.C.

20555 Perry Nuclear Power Plant Docket No. 50-440 Submittal of NRC Form 474,

Sitaulation Facility Certifi, cation" Centlemen Pursuant to 10CFR55.45(b)(5)(i), we are hereby cub'mitting NRC Form 474,

" Simulator Facility Certification" along with the following supporting document.atian for certificatton of Perry Nuclear Power Plant's new simulation facility: ' lab A - Certification Overview, Tab B - Exceptiont to ANS 3.5, Tab C - Simulexor Tests, a description of performance testing completed for the f acility as regaieed by 10CFR55.45(b)(5)(vi), and Tab D - Four Year Test Schedule, a schedule for the conduct of approximately 25% of the performance tests per year for the subsequent four years as required by 10CFR55.45(b)(5)(vi).

If you have any questions, please feel free to call.

Sinceriz,.

b n

t s

L Michael D. Lyster Attachment MDL:CJF:sc cc: USNRC, Director, Office of NRR l

USNRC Project Manager USNRC Resident Inspector l

USNRC Region III l

i O

{, { ' pasq crw n o

r e"c i we'<c 9107020101 910628

,l i

PDR ADOCK 05000440

_.__.P_,_

PDR

,_._ _ _. _ __.,_. _ _, _,_.___._._,_ _., __ _.~