PY-CEI-NRR-0447, Forwards Perry Nuclear Power Plant Emergency Instruction Validation Summary Rept, Prior to Initial Criticality,Per License Condition Described in Attachment 3 to License NPF-45.Addl Repts,Per Dcrdr Will Be Submitted by May 1986
| ML20203G535 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 04/24/1986 |
| From: | Edelman M CLEVELAND ELECTRIC ILLUMINATING CO. |
| To: | Butler W Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20203G539 | List: |
| References | |
| PY-CEI-NRR-0447, PY-CEI-NRR-447, NUDOCS 8604290154 | |
| Download: ML20203G535 (1) | |
Text
.
THE CLEVELAND ELECTRIC ILLUMIN ATING COMP ANY P O. Box 5000 - CLEVELANo, OHto 44101 - TELEPHONE (216) 622-9800 - lLLUMINATING BloG - 55 PUBLIC$oVARE Semng The Best location in the Nation MURRAY R. EDELMAN VICE PRESIDENT NUCLEAR April 24, 1986 PY-CEI/NRR-0447 L Dr. W. D. Butler, Director BWR Project Directorate No. 4 Division of BWR Licensing U. S. Nuclear Regulatory Commission Washington, D.C.
20555 Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 PEI Validation Summary Report
Dear Dr. Butler:
We hereby submit the completed Perry Nuclear Power Plant Emergency Instruction Validation Summary Report prior to initial criticality to satisfy the license condition described in Attachment 3 to the Perry Operating License (NPF-45). Additional reports to address the Detailed Control Room Design Review license conditions identified in Item 1 of are expected to be submitted in early May.
Should you have any questions or commenta, please feel free to contact me.
Very truly yours,
/N Murray R. Edelman Vice President Nuclear Group MRE:jad Enclosure cc:
Jay Silberg, Esq.
John Stefano (2)
J. Grobe dD (y
g 8604290154 860424 DR ADOCK 05000440 PDR m