PY-CEI-NRR-0447, Forwards Perry Nuclear Power Plant Emergency Instruction Validation Summary Rept, Prior to Initial Criticality,Per License Condition Described in Attachment 3 to License NPF-45.Addl Repts,Per Dcrdr Will Be Submitted by May 1986

From kanterella
(Redirected from PY-CEI-NRR-0447)
Jump to navigation Jump to search
Forwards Perry Nuclear Power Plant Emergency Instruction Validation Summary Rept, Prior to Initial Criticality,Per License Condition Described in Attachment 3 to License NPF-45.Addl Repts,Per Dcrdr Will Be Submitted by May 1986
ML20203G535
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 04/24/1986
From: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
To: Butler W
Office of Nuclear Reactor Regulation
Shared Package
ML20203G539 List:
References
PY-CEI-NRR-0447, PY-CEI-NRR-447, NUDOCS 8604290154
Download: ML20203G535 (1)


Text

.

THE CLEVELAND ELECTRIC ILLUMIN ATING COMP ANY P O. Box 5000 - CLEVELANo, OHto 44101 - TELEPHONE (216) 622-9800 - lLLUMINATING BloG - 55 PUBLIC$oVARE Semng The Best location in the Nation MURRAY R. EDELMAN VICE PRESIDENT NUCLEAR April 24, 1986 PY-CEI/NRR-0447 L Dr. W. D. Butler, Director BWR Project Directorate No. 4 Division of BWR Licensing U. S. Nuclear Regulatory Commission Washington, D.C.

20555 Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 PEI Validation Summary Report

Dear Dr. Butler:

We hereby submit the completed Perry Nuclear Power Plant Emergency Instruction Validation Summary Report prior to initial criticality to satisfy the license condition described in Attachment 3 to the Perry Operating License (NPF-45). Additional reports to address the Detailed Control Room Design Review license conditions identified in Item 1 of are expected to be submitted in early May.

Should you have any questions or commenta, please feel free to contact me.

Very truly yours,

/N Murray R. Edelman Vice President Nuclear Group MRE:jad Enclosure cc: