PNP 2021-013, Request for Rescission of Interim Compensatory Measure from Order EA-02-026
| ML21202A211 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 07/21/2021 |
| From: | Corbin D Entergy Nuclear Operations |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| EA-02-026, PNP 2021-013 | |
| Download: ML21202A211 (3) | |
Text
SAFEGUARDS INFORMATION 9 Ente,gx Entergy Nuclear Operations, Inc.
Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, Ml 49043-9530 Tel 269-764-2000 PNP 2021-013 July 21, 2021 Darrell W. Corbin Site Vice President EA-02-026 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001
Subject:
Request for Rescission of Interim Compensatory Measure from Order EA-02-026 Palisades Nuclear Plant NRC Docket No. 50-255 Renewed Facility Operating License No. DPR-20
References:
- 1) U. S. Nuclear Regulatory Commission (NRC) letter to Nuclear Management Company, LLC (NMC), Issuance of Order for Interim Safeguards and Security Compensatory Measures for-Palisades Plant, (ADAMS Accession No. ML020500572), dated February 25, 2002
- 2) U. S. Nuclear Regulatory Commission (NRC) letter to Nuclear Management Company, LLC (NMC) and Entergy Nuclear Operations, Inc. (Entergy), Order Approving Transfer of Licenses and Conforming Amendments Relating to Palisades Nuclear Plant (TAC No. MD2954), (ADAMS Accession Package No. ML070780038), dated April 6, 2007
- 3) Entergy Nuclear Operations, Inc. (Entergy) letter to U.S. Nuclear Regulatory Commission (NRC), Supplement to Certification of Permanent Cessation of Power Operations, (ADAMS Accession No. ML17292A032), dated October 19, 2017 In Reference 1, the U. S. Nuclear Regulatory Commission (NRC) issued Order EA-02-026, Order for Interim Safeguards and Security Compensatory Measures, to Nuclear Management Company, LLC (NMC) for Palisades Nuclear Plant (PNP). In Reference 2, the NRC issued an Order approving the transfer of the PNP operating license from NMC to Entergy Nuclear Operations, Inc. (Entergy).
In Reference 3, Entergy notified the NRC that it has decided to permanently cease operations at PNP no later than May 31, 2022. Once certifications for permanent cessation of operations and permanent removal of fuel from the reactor vessel are submitted to the NRC in accordance with NOTICE: The Enclosure to this letter contains "Safeguards Information." Upon separation of the Enclosure from this letter this page becomes "DECONTROLLED."
SAFEGUARDS INFORMATION
SAFEGUARDS INFORMATION PNP 2021-013 Page 2 of 2 Title 10 of the Code of Federal Regulations, Part 50, Section 82 (10 CFR 50.82), Termination of license, Subparagraphs 50.82(a)(1)(i) and (ii), per 10 CFR 50.82(a)(2), the 10 CFR part 50 license no longer authorizes operation of the reactor or emplacement or retention of fuel into the reactor vessel.
In accordance with Section 111.D of Order EA-02-026, a request to rescind Interim Compensatory Measure (ICM) 8.1.a is provided in the enclosure to this letter. The recission request is part of the transition from an operating facility to a non-operating facility. The enclosure to this letter provides the basis for rescission of the subject security order and contains Safeguards Information as defined by 10 CFR 73.21, Protection of Safeguards Information: Performance Requirements, and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended.
Entergy requests recission of the Order no later than May 31, 2022 and that the recission become effective immediately following submittal of the required 1 O CFR 50.82(a)(1 )(ii) certification that Entergy has permanently removed fuel from the PNP reactor vessel.
This letter contains no new commitments and no revised commitments.
Should you have any questions or require additional information, please contact Jim Miksa, regulatory assurance engineer at (269) 764-2945.
Respectfully, 7fo)~
Darrell W. Corbin DWC/jpm
Enclosure:
Basis for Rescission of Interim Compensatory Measure from Order EA-02-026 cc:
NRC Region Ill Regional Administrator NRC Senior Resident Inspector - Palisades Nuclear Plant NRC Project Manager - Palisades Nuclear Plant NOTICE: The Enclosure to this letter contains "Safeguards Information." Upon separation of the Enclosure from this letter this page becomes "DECONTROLLED."
SAFEGUARDS INFORMATION
SAFEGUARDS INFORMATION Enclosure to PNP 2021-013 Basis for Rescission of Interim Compensatory Measure from Order EA-02-026 NOTICE: The Enclosure to this letter contains "Safeguards Information." Upon separation of the Enclosure from this letter this page becomes "DECONTROLLED."
SAFEGUARDS INFORMATION