PREL.lARY NOTIFICATION Date: December 24, 1980 This reliminary notification constitutes EARLY notice of safetv or ublic interest si nificance.
The information resented i initially received without verification or evaluation and is basica that is known by IE staff as ~f this date, Facilitv:
Commonwealth Edison Company Dresden. Nu~lear Power Station Unit 3 (Docket No.
Morris, IL*
Subject:
EXCEEDING TECHNICAL SPECIFICATION L.C,O. FOR PRIMARY CONTAINMENT HPCI, AND ISOLATION CONDENSER WHILE. SHUT DOWN This PN updates PNO-III-80-234 issued onDecember 22, 1980.
The unit is returning-to power operation (critical 5: 10 a. m. CST) following the outage for scheduled maintenance and modifications.
During the outage, the reactor pressure was allowed to increase above cold shutdown (175 psig). while the Primary Containment was open, the High Pressure Coolant Injection.System.was out of service, and the Isolation Condenser was isolated.
An Immediate Action letter was issued on December 23, i980 which confirmed actions to prevent recurrence of the event.
Actions included review by the onsite Review Board; issuance of a station operating order to assure maintenance of flow and therefore adequate mixing of reactor coolant in the core; and inclusion in the_
- report of the event* the permanent changes to be. implemented to preclude recurrence of simi1ar events.
Neither the licen*see nor Region III is planning to issue a press release.
The State of Illinois is being notified.
This information is current as of 9:00 Contact*. i!. r4;kue, SRI, 815/942-92.6 7 a.m., December 24, 1980:.
R. F. ~man, RIII, 312/932-2540 Distributlon:
Transmitted H St 1-3.L Chairman Ahearne Commissioner Hendrie Commissioner Gilinsky.
~om~issioner Bradford ACRS Trarismi tted':
MNBB ~*
W. J. Dircks, EDO C. Michelson, AEOD J. J. FouchJr<l, PA N. M. Haller, MPA G. W. Kerr, OSP IL K. Shapar, ELD Region I Re<>ion II
(_."7;/~
Region IV
,*)
.:.,,, ~ -
Region v
.. \\*,;..-
P~
H.
R.
F.
D.
. D.
- s.
Cf "2 "'":>
Bldg.
- .. ~;?--
R. Denton, NRR II. Voll111er, NRR
. Schroedc r, NHR F. Ross, NRR Eiscnhut, NRR
![. Jlanauer,NHR ti *'""? --;
Willste Bldg.12_!
J. G. D.:ivis, ;-;t-1ss R.
~li.nogue, RES PRELIMINARY ~iOTIFIC\\TI0.'1 S. J. Chilk, SECY C.. C. Kainmerer, CA (For Distribution)
IE:Ti\\S o/1.?D (IE:HQ Dist.)
.I.a-ttd-ow--
~6 min/ pa gc)
J. J. Cummin3s, OIA.
MAIL R. Smith, SD IE: Ti\\S Dorn111ent i'lgt. Br. (for PDR/LPD)
S~ Ebbin, Executive Director Nt1clc.:ir Safety Ovcrsi.gt1t Committee
.1133 lSt!t Street N\\~, Suite 307
\\.Ja sh i ug ton, DC 2 0005