PRELIMINARY NOTIFICATION Date:
December 19, 1980 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO-III-80 233 This preliminary notification constitutes EARLY notice of events of PQSfH.'6;
$(,,
safety or public interest significance.
The inforraation presented /f.- a initially received without verification or evaluation and is basigg)( a Mpf.
j7 T
d that is known by IE staff as of this date.
/,9 4 % \\/y/%
f 4
i FACILITY:
Consumers Power Company Big Rock Point Nuclear Power Plant i
Docket 50-155
- \\ s Cbarlevoix, Michigan g'hi b p' p b [.
SUBJECT:
EQUIPMENT PROBLEMS RESULTING IN A PLANT SHUTDOWN IN EXCESS
=
DAYS Inspections and evaluations performed by a subcontractor (Bechtel) to determine the environmental qualifications of certain electrical connectors located inside contain-ment reveals that adequate material and/or test data does not exist to make a determ-ination of acceptability for a number of these electrical connectors.
The licensee has identified a program to rework all of the questionable connectors during this refueling outage. This program will result in an extension of the refueling outage by an estimated one to three weeks.
The State of Michigan will be not;.ified.
Neither Region III nor the licensee plans to issue a press release.
Region III received notification of this matter frcm the licensee on December 19, 1980.
This PN is being issued because the shutdown has been extended for greater than two days.
This information is current as of 1:00 P.M.
(EDT) on December 19, 1980.
%%* Wrigh'E, Res. Insp.
%SF kE W-w-
CONTACT:
G.
D. C. Boyd R. F. Heishman 616/547-4086 384-2546 (FTS) 384-2540 (FTS)
Distribution:
Transmitted H St lE*.7.4 P.N.
Chairman Ahearne Commissioner Hendrie S. J. Chilk, SECY Commissioner Gilinsky Commissioner Bradford C. C. Kammerer, CA ACRS or Distribution)
Transmitted: MUBB f.2 P. Bldg. $
/>q IE:TAS /J # (IE:HQ Dist.)
W. J. Dirchs, ED0 H. R.-Denton, NRR C. !!ichelson, AEOD R. H. Vollmer, NRR Landow ff min /page)
J. J. Fouchard, PA F. Schroeder, NRR J. J. Cummtags, OIA N. M. Halle r, MPA D. F. Ross, NRR G. W. Kerr, OSP D. Eisenhut, NRR MAIL ll. K. Shapar, ELI' S. H. Ilanauer,NRR R. Smith, SD l 2 (PM 3,
IE:TAS V
Willste Bld;.
Document Mgt. 1r. (For PDR/LPD)
Region I
{ F d t/t [/
Region II J. G. Dav ts, !. MSS F
R. Minogue, RES S. Ebbin. Executive Director
([GJ(7/
R e m o n I'.'
(
fM/
Region '.
y / Nuclear Sa tety ' ee rs i.;h t Comm t'.ce S.SFG s /2 nu :sta Sucet :. W. sutte m m
Washington, DC 20005 810304003Y PRE m : nar = :rIC.m cN CW