PNO-III-80-216, on 801114,util Notified That Director of IE Authorized Resumption of Receipt Insp for Util Mechanical Subcontractor,Cherne Contracting Corp & Electrical subcontractor,Commonwealth-Lord Jv

From kanterella
(Redirected from PNO-III-80-216)
Jump to navigation Jump to search
PNO-III-80-216:on 801114,util Notified That Director of IE Authorized Resumption of Receipt Insp for Util Mechanical Subcontractor,Cherne Contracting Corp & Electrical subcontractor,Commonwealth-Lord Jv
ML19351G046
Person / Time
Site: Marble Hill
Issue date: 11/14/1980
From: Fiorelli G, Schweibinz E, Williams C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
References
PNO-III-80-216, NUDOCS 8102230015
Download: ML19351G046 (1)


PRELIMINARY NOTIFICATION Date: 11/14/80 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURENCE--PNO-III-80-216

  1. %'i Q This creliminary notification constitutes EARLY notice of events of4$035!Bl?-

safety or cuolic interest sicnificance.

L infomation cresenteAV as s

s initially received witncut verification or evaluation and is bas /sylly,a Q

tna is kncwn by IE staff as of this date.

f g' Q g

Dd-FACILIn':

Public Service of Indiana Sj g [C Marble Hill Units 1 and 2 i?/

DOCKET NOS.:

50-546; 50-547

  1. 9

SUBJECT:

RESUMPTION OF RECEIPT INSPECTION BY PU3LIC SERVICE OF INDIA W (PSI)

SU3 CONTRACTORS Public Service of Indiana was notified today, November 14, 1980, that the Director of the Office of Inspection and Enforcement had authorized resumption of receipt inspection for PSI =echanical subcontractor Cherne Contracting Corporation (CCC) and electrical subcontractor Com=onwealth-Lord J.V.

This authorization was based on favorable NRC inspection findings which confirmed that appropriate corrective actions had been taken by the licensee and its subcontractors.

This PN is for information only and no further action by IE is planned.

Region III does not plan a presc release, however, it is expected that the licensee will issue one.

Considerable local =edia interest is expected.

The State of Indiana will be notified.

This information is current as of 9:30 a.=.

(CST) on Nove=ber 14, 1980.

Contact:

E. Schweibina, FTS C. Williams, FTS G. Fiore111, FTS 384-2579 3-

-2581 384-2695 Distribution:

Transmitted H

. /4 Chairman Ahearne Ccmmissioner Hendrie S. J. Chilk, SECY Ccmissioner Gilinsky Comissioner Bradford C. C. Kamerer, CA (ForDistributionp' ACRS Transmitted:

M'H3 /4.8 P. Bldg. [ [ 5 IE: XCOS /#./COEHQDist.)

W. J. Dircks, EC0" ~

~

H. R. Denton, NRR C. Michelson, AEOD R. H. Vollmer, NRR Landow (6 min /page)

J. J. Fouchard, PA R. J. Ma ttson, NRR J. J. Cummings, OIA N. M. Haller, MPA D. F. Ross, NRR

c. W. Kerr, OSP D. Eisenhut, NRR MAIL

/

R. Minogue, SD H. K. Shapar, ELD

5. H. Hanauer IE: XOOS Willste Bldg. /4-7 Document Mgt. Br. (For POR/LPD J. G. Davis, NMSS Segicnal Offices T. E. Mu rley, RES S. Ebbin, Executive Director kC -

Nuclear Safety Oversight Co=i t t e.

d ' ~~~ g e 113315th Street W Suite 307 PRELIMINARY NOTIFICATION j r

'3 ro Washington, DC 20003 S T- )/.: /

'd Z /; M c]O223006 I"