PNO-III-80-203:on 801031,notification Received of Petition Filed by Pollution & Environ Control,Inc to Shut Down Facilities.Petition Challenges Capability of Requirement to Verify That Water Not Accumulating in Scram Discharge Vols
ML19351F979
Person / Time
Site: Dresden, Quad Cities  
Issue date: 10/31/1980
From: Reimann F, Warnick R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
References
PNO-III-80-203, NUDOCS 8102200696
Download: ML19351F979 (1)


~'

~~

~PRELIMINARE fl0T'I'F'ICATICh

~~

.i Date: October 31, 1980 PRELIMI?!ARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRE!!CE--PNO-III-80 203 This oreliminary notification constitutes EARLY notice of events of dE A safety or oublic interest sicnificance.

The information presented W ?af

" i.u initially received without verification or evaluation and is basicatT[v atV %. ..'

',}

+

that is kncwn oy IE staff as of this date.

./

f

,2

.?

Facilities:

Cor. onwealth Edison Company 1

3 Dresden Units 2 & 3 (50-10, 50-237, 50-249), Morris,. M Mk, O k}

'.e J t

Quad Cities U: 4 rs 1 & 2 (50-254, 50-265) Cordova, IL '.

~i,.,,

3., '

A Subj ect: PE"'ITION TO SHUT DOWN 4 BWR's

's

', s 'y ?

At 1:37 p.m.,

October 31, 1980, Region III wrs informed by IE:HQ and the ELD-tha't a petition has been filed by Pollution & Environmental Controls, Inc., pursuant to 10 CFR 2.206, to shut down Dresden Units 2 & 3, and Quad Cities Units 1 & 2.

The pctition appears to challenge the capability of the current NRC requirement to verify that water is not accumulating in the af fected unit's scram discharge volumes.

This requirement was imposed as a result of IEB 80-17 (Failure of Control Rods to Scram at a BWR),and was reinforced by an NRC confirmatory order issued October 5, 1980.

The 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> monitoring requirement is an interim measure pending completion of the installa tion of a continuous monitoring system by December, 1980.

Neither the licensee nor Region III are planning a press release.

l 1he State of Illinois is being notified.

This PN is issued f or information only, further action will be taken if requested.

This information is current as of 2:00 p.m., October 31, 1980.

Yf y

Contact:

F. W. Reimann, R. W. Warnick (312) 932-2549 (312) 932-2565 Distribution:

Transmitted H St. 3,S7 Chairman Ahearne Commissione~r Hendrie S. J. Chilk, SECY Ccm.issioner Gilinsky Ce".nissioner Bradford C. C. Kam erer, CA ZRS (For Dist.ribution)

Transmi t ted:

M'IBB 9. VC P. Bldg. 3.'O IE:XOOS E' %.C(IE:HQ Dist. )

'd. J. Di rcks, EDO H. R. Denton, NRR C. Michelson, AE00 R. H. Vollmer, NRR Landow (6 min /page)

J. J. Fouchard, PA R. J. Mattson, NRR J. J. Cummings, OIA N. M. Hall 2r, MPA D. F. Ross,tiRR c. 'J. h rr. Osp D. Eisenhut,.NRR MAIL H. X. Shapar, ELD S. H. Hanauer R. Minogue, SD IE:X005

' dill ste Bldg. W [ 9 Document Mgt. B r. (For POR/LPD:-

J. G. Davis tiMSs Rc';icnal Offices F-T. E. Murley, ars M

s. w PRELIMINARY NOTIFICATION fly z : Si-

_8102200(e g Q f '% >'

r y

,. -,.. - _. - -. -., -. -. -. - -, -