PNO-II-95-046C, on 950801,both Units to Plant Had Been Shutdown in Anticipation of Hurricane Erin.Open Communication Line Will Be Established Upon Arrival of Hurricane Winds
| ML17353A303 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point, Saint Lucie |
| Issue date: | 08/01/1995 |
| From: | Belisle A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| References | |
| PNO-II-95-046C, PNO-II-95-46C, NUDOCS 9508100120 | |
| Download: ML17353A303 (3) | |
a.j:oared z
REGULATO
- i. 'HH'EOBRPRKBUTION rSTEM (RIDS)
'ACCESSION NBR:9508100120 DOC.DATE: 95/08/01 NOTARIZED: NO DOCKET g FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and,Light C
05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 50-335 St. Lucie Plant, Unit 1, Florida Power Lf'ight Co.
05000335 50-389 St. Lucie Plant, Unit 2, Florida Power 6 Light Co.
05000389 AUTH.NAME AUTHOR AFFILIATION BELISLEgA.
Region 2 (Post 820201)
RECIP.NAME RECl;PIENT AFFILIATION F
SUBJECT:
PNO-II-95-046C:on 950801,both Units to plant had been shutdown in anticipation of Hurricane Erin. Open communication line will be established upon arrival of hurricane winds.
DISTRIBUTION CODE:
IE34D COP1ES RECEIVED:LTR ENCL SIZE:
TITLE: Preliminary Notification-Occurrence/Non outine vent/Safeguards Even NOTES:
C RECIPIENT ID CODE/NAME INTERNAL~ 'ACRS NRR/DISP/PIPB NUDOCS-ABSTRACT RES/DRA RES/DSR DEPY RES/FMPAS RGN2 FILE 01 EXTERNAL LITCO BRYCEiJ H
NRC PDR COPIES LTTR ENCL RECIPIENT ID CODE/NAME FILE CENTER R
DOTS/TE OE DIR RES/DSIR/EIB RES/DST RES/RPHEB NOAC NUDOCS FULL TXT COPIES LTTR ENCL 1
1 1
1 1-1 D
U VOTE TO ALL"RIDS" RECIPIENTS:,
PLEASE HELP US TO REDUCE iVASTE!CONTACTTHE DOCL'MENTCONTROL DESk, ROOM P1.37 IEXT. 504-2033 ) TO EL Ih flNATE 5'OI:R 4AifE FROif DISTRIDI."I'IONLISTS FOR DOCUMENTS YOL'ON"I'EED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR ENCL 17
August 1,
1995 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE PNO-I I-95-046C This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance.
The information is as initially received without verification or evaluation, and is basically all that is known by Region II staff in Atlanta, Georgia on this date.
~Facil it Florida Power
& Light Co.
Turkey Point 3
4 Miami,Florida Dockets:
50-250,50-251 Licensee Emer enc Classification X Notification of Unusual Event Alert Site Area Emergency General Emergency Not Applicable Florida Power
& Light Co.
Saint Lucie 1
2 Florida Dockets:
50-335,50-389
Subject:
HURRICANE ERIN REGION II ACTIVATES INCIDENT RESPONSE CENTER As of 9:00 p.m.
Region II activated the Incident Response Center.
Hurricane Erin is located at 26.
8:00 p.m., August 1, 1995.
St.
80.4 longitude.
Both St. Lucie hurricane.
The licensee at St.
procedures and have established personnel have been sent home.
about 11:00 p.m.
Currently St.
40 mph winds.
7 latitude and 78.7 longitude as of Lucie is located at 27.3 latitude and units are shutdown in anticipation of the Lucie has implemented their emergency additional shift staffing.
Non essential Hurricane winds are anticipated onsite at Lucie is experiencing approximately The Hurricane Warning has been cancelled for Dade County as of 8:00 p.m.
on August 1,
1995.
Upon arrival of hurricane winds at St. Lucie, an open communication line will be established between St.
Lucie site, the Florida Power and Light's Emergency Offsite Facility in Miami, NRC Headquarters, and the Region II Incident Response Center.
Region II personnel are at St.
Lucie to augment the Resident staff.
The Region II State Agreement Officer is at the State Emergency Center in Tallahassee, Florida.
A Region II manager is at the Emergency Offsite Facility in Miami.
This information was received by telephone from the NRC Resident Inspectors onsite at St.
Lucie and is current as of 9:00 p.m.
The State of Florida has been notified.
GS Jdh.>f
" 9508iOOi20 95080i PDR ILE pMA-r t-oz-nnc.r ot n
Contact:
A. BfLISLf (404)331-4196