PNO-II-95-046A, on 950731,plants Made Preparations for Anticipation of Hurricane Erin W/Shutting Down of St Lucie Unit 2.Region II Personnel Sent to Turkey Point Site to Augment Staff & All Four Emergency Diesels Tested
| ML17353A302 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point, Saint Lucie |
| Issue date: | 08/01/1995 |
| From: | Belisle A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| References | |
| PNO-II-95-046A, PNO-II-95-46A, NUDOCS 9508100116 | |
| Download: ML17353A302 (3) | |
RIDRIT'Y Z REGULATO-1IIEIKMHHX81DTION RSTEM (RIDS)
-ACCESSION NBR:9508100116 DOC.DATE: 95/08/01 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C- 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 50-335 St. Lucie Plant, Unit 1, Florida Power 6 Light Co.
05000335 50-389 St. Lucie Plant, Unit 2, Florida Power a Light Co.
05000389 AUTH.NAME AUTHOR AFFILIATION BELISLE,A.
Region 2 (Post 820201)
RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
PNO-II-95-046A:on 950731,plants made preparations for F
anticipation of hurricane Erin w/shutting down of St Lucie Unit 2.Region II personnel sent to Turkey Point site to augment staff 6 all four emergency diesels tested.
C DISTRIBUTION CODE:
IE34D COPIES RECEIVED:LTR NCL SIZE:
TITLE: Preliminary Notification-Occurrence/Non-outine vent/Safeguards Even NOTES:
RECIPIENT ID CODE/NAME INTERNAL: ACRS NRR/DISP/PIPB NUDOCS-ABSTRACT RES/DRA RES/DSR DEPY RES/FMPAS RGN2 FILE 01 EXTERNAL: LITCO BRYCEgJ H
NRC PDR COPIES LTTR ENCL RECIPIENT ID CODE/NAME GENRE NRR/DOTS/TERB OE DIR RES/DSIR/EIB RES/DST RES/RPHEB NOAC NUDOCS FULL TXT COPIES LTTR ENCL C
N VOTE TO ALL"RIDS" RECIPIENTS:.
PLEASE HELP US TO REDUCE iVASTE!COiTACTTHE DOCL'MEiTCOiTROL DESh, ROOM P!.37 (EXT. 504-20S3
) TO E LIMIYATE 5'Ol 'R NAME FROTI DISTRIDL"I'IONLISTS FOR DOCUMENTS YOL'Oi "I' EED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR ENCL 17
g-August 1,
1995 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE PNO-I I-95-046A This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance.
The information is as initially received without verification or evaluation, and is basically all that is known by Region II staff in Atlanta, Georgia on this date.
~Faci 1it Florida Power
& Light Co.
Turkey Point 3 4 Hiami,Florida Dockets:
50-250,50-25Y Licensee Emer enc Classification X Notification of Unusual Event Alert Site Area Emergency General.
Emergency Not Applicable Florida Power
& Light Co.
Saint Lucie 1
2 Florida Dockets:
50-335,50-389
Subject:
HURRICANE ERIN At 11:00 p.m.
on July 31, 1995, Tropical Storm Erin was upgraded to a hurricane.
Both Turkey Point and St. Lucie sites continued to make preparations for the hurricane.
St. Lucie Unit 2 is being shutdown in anticipation of the hurricane.
Both units at Turkey Point are at 100%
power.
Region II personnel have arrived in Florida to augment the Turkey Point Resident staff.
The Emergency
Response
Vehicle has also arrrived in Florida and is prepared to respond as needed.
The Region II State Agreement Officer has departed the Atlanta area for the State Emergency Center in Tallahassee, Florida.
Region II personnel closely tracked Hurricane Erin's progress throughout the evening from the Incident Response Center.
Hurricane Erin is located at latitude 24.3 and longitude 76.00 as of 5:00 a.m.,
August 1, 1995.
The Turkey Point plant is located at latitude 25.4 and longitude 80.4.
The licensee is expecting hurricane winds at midnight tonight at the Turkey Point site and is making preparations for the hurricane.
All four emergency diesels have been tested and two operating crews designated to be on shift during the passing of the hurricane have been conducting simulator training for anticipated scenarios.
This information was received by telephone from the NRC Resident Inspectors onsite at Turkey Point and St.
Lucie and is current as of 8:30 a.m.
fthm~
t ()
~ rn
~
~'a A at I 0$10
The State of Florida has been notified.
Contact:
A. BELISLE (404)331-4196