PMNS20220366, Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request to Replace Reactor Coolant Pump Seals for the Turkey Point Generating Unit Nos. 3 and 4
Letter Sequence Meeting | |
---|---|
EPID:L-2022-LLA-0128, License Amendment Request 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project (Non-Proprietary) (Approved, Closed) | |
Initiation Administration | |
MONTHYEARPMNS20220366, Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request to Replace Reactor Coolant Pump Seals for the Turkey Point Generating Unit Nos. 3 and 42022-04-22022 April 2022
[Table View]Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request to Replace Reactor Coolant Pump Seals for the Turkey Point Generating Unit Nos. 3 and 4 Project stage: Meeting ML22243A1612022-08-26026 August 2022 Submittal of License Amendment Request 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project Project stage: Request L-2022-110, License Amendment Request 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project (Non-Proprietary)2022-08-26026 August 2022 License Amendment Request 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project (Non-Proprietary) Project stage: Request ML22243A1622022-08-26026 August 2022 Submittal of License Amendment Request 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project Project stage: Request ML22265A1522022-09-21021 September 2022 NRR E-mail Capture - Acceptance Review - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - LAR to Revise Fire Protection Program (L-2022-LLA-0128) Project stage: Acceptance Review ML22264A0072022-09-29029 September 2022 Request for Withholding Information from Public Disclosure for Turkey Point Nuclear Generating Unit Nos. 3 and 4 Project stage: Withholding Request Acceptance ML23006A0262023-01-0505 January 2023 NRR E-mail Capture - Audit Plan - Turkey Point Fire Protection Changes to Support RCP Seal Replacement LAR Project stage: Approval ML23129A8322023-05-0505 May 2023 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - RCP LAR (L-2022-LLA-0128) Project stage: RAI L-2023-069, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-05-31031 May 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project Project stage: Response to RAI ML23157A1822023-06-27027 June 2023 Request for Withholding Information from Public Disclosure for Turkey Point Nuclear Generating Unit Nos. 3 and 4 Project stage: Withholding Request Acceptance ML23248A1292023-06-29029 June 2023 NRR E-mail Capture - St Lucie 50.69 - Additional Audit Questions Project stage: Other ML23242A0922023-08-0606 August 2023 Request for Withholding Information from Public Disclosure for Turkey Point Nuclear Generating Unit Nos. 3 and 4 Project stage: Withholding Request Acceptance L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-08-25025 August 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project Project stage: Response to RAI ML23249A2412023-09-25025 September 2023 Regulatory Audit Summary for the Review of License Amendment Request to Revise the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project Project stage: Approval ML23320A3062024-01-22022 January 2024 Issuance of Amendment Nos. 298 and 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project Project stage: Approval 2023-05-05 |
ML22112A110 | |
Person / Time | |
---|---|
Site: | Turkey Point |
Issue date: | 04/22/2022 |
From: | Office of Nuclear Reactor Regulation |
To: | |
References | |
PMNS20220366 | |
Download: ML22112A110 (4) | |
Similar Documents at Turkey Point | |
---|---|
Category:Meeting Notice
MONTHYEARPMNS20230969, Public Meeting to Receive Comments on the Draft Site-Specific Turkey Point Environmental Impact Statement2023-09-0707 September 2023
[Table view]Public Meeting to Receive Comments on the Draft Site-Specific Turkey Point Environmental Impact Statement PMNS20230973, Public Meeting to Receive Comments on the Draft Site-Specific Turkey Point Environmental Impact Statement2023-09-0707 September 2023 Public Meeting to Receive Comments on the Draft Site-Specific Turkey Point Environmental Impact Statement PMNS20230932, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-08-14014 August 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230879, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-08-0101 August 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230809, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-07-11011 July 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230775, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-06-30030 June 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230732, Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request for Transition to a 24-month Fuel Cycle for Turkey Point Generating Unit Nos. 3 and 42023-06-26026 June 2023 Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request for Transition to a 24-month Fuel Cycle for Turkey Point Generating Unit Nos. 3 and 4 PMNS20230718, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-06-12012 June 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230673, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-05-26026 May 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230599, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-05-15015 May 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230594, Annual Assessment Meeting2023-05-0404 May 2023 Annual Assessment Meeting PMNS20230447, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-04-20020 April 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230449, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-04-18018 April 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230409, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-04-11011 April 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230253, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-04-0707 April 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230278, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-04-0303 April 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230308, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-03-27027 March 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230226, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-03-0707 March 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230223, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-03-0606 March 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230192, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-03-0101 March 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230168, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-02-22022 February 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230134, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-02-22022 February 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230159, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-02-15015 February 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230049, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-01-27027 January 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230080, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-01-26026 January 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230060, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-01-18018 January 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230003, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-01-0505 January 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20221243, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Planned Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 32022-12-0202 December 2022 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Planned Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and PMNS20221177, Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request for Transition to a 24-month Fuel Cycle Turkey Point Generating Unit Nos. 3 and 42022-11-22022 November 2022 Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request for Transition to a 24-month Fuel Cycle Turkey Point Generating Unit Nos. 3 and 4 PMNS20221132, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2022-10-31031 October 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20221080, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2022-10-17017 October 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20221057, Meeting Between the U.S. Nuclear Regulatory Commission and Florida Power & Light Company to Discuss Review of Digital Instrumentation and Controls License Amendment Requests for Turkey Point Nuclear Generating, Units 3 and 42022-10-11011 October 2022 Meeting Between the U.S. Nuclear Regulatory Commission and Florida Power & Light Company to Discuss Review of Digital Instrumentation and Controls License Amendment Requests for Turkey Point Nuclear Generating, Units 3 and 4 PMNS20220997, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2022-10-0303 October 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20220998, Notice of Meeting with Florida Power and Light Company (FPL) Regarding Turkey Point Setpoint Methodologies as It Relates to the Improved Technical Specification (ITS) Conversion License Amendment Request2022-09-22022 September 2022 Notice of Meeting with Florida Power and Light Company (FPL) Regarding Turkey Point Setpoint Methodologies as It Relates to the Improved Technical Specification (ITS) Conversion License Amendment Request PMNS20220876, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss Review of Defense-in-Depth and Diversity (D3) Evaluation for Turkey Point Nuclear Generating, Units 3 and 4 (Turkey Point)2022-09-22022 September 2022 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss Review of Defense-in-Depth and Diversity (D3) Evaluation for Turkey Point Nuclear Generating, Units 3 and 4 (Turkey Point) PMNS20220935, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests2022-09-0909 September 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests PMNS20220930, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss Acceptance Review of the Turkey Point Digital Instrumentation and Controls License Amendment Request2022-09-0808 September 2022 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss Acceptance Review of the Turkey Point Digital Instrumentation and Controls License Amendment Request PMNS20220832, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests2022-08-16016 August 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests PMNS20220799, Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request to Extend the Completion Time for an Inoperable Reactor Trip Breaker for the Turkey Point Generating, Unit Nos. 3 and2022-08-16016 August 2022 Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request to Extend the Completion Time for an Inoperable Reactor Trip Breaker for the Turkey Point Generating, Unit Nos. 3 and 4 PMNS20220748, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests2022-08-0303 August 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests PMNS20220701, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-07-14014 July 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request PMNS20220683, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-06-28028 June 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request PMNS20220609, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-06-14014 June 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request PMNS20220582, Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request to Replace Reactor Coolant Pump Seals for the Turkey Point Generating Unit Nos. 3 and 42022-06-10010 June 2022 Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request to Replace Reactor Coolant Pump Seals for the Turkey Point Generating Unit Nos. 3 and 4 PMNS20220592, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-06-0606 June 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request PMNS20220454, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-05-17017 May 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request PMNS20220478, Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request to Replace Reactor Coolant Pump Seals for the Turkey Point Generating Unit Nos. 3 and 42022-05-11011 May 2022 Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request to Replace Reactor Coolant Pump Seals for the Turkey Point Generating Unit Nos. 3 and 4 PMNS20220468, Notice of Meeting with NextEra Energy Llc/Florida Power & Light Company2022-05-0404 May 2022 Notice of Meeting with NextEra Energy Llc/Florida Power & Light Company PMNS20220427, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-04-27027 April 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request PMNS20220366, Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request to Replace Reactor Coolant Pump Seals for the Turkey Point Generating Unit Nos. 3 and 42022-04-22022 April 2022 Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request to Replace Reactor Coolant Pump Seals for the Turkey Point Generating Unit Nos. 3 and 4 2023-09-07 Category:Meeting Agenda MONTHYEARPMNS20230969, Public Meeting to Receive Comments on the Draft Site-Specific Turkey Point Environmental Impact Statement2023-09-0707 September 2023
[Table view]Public Meeting to Receive Comments on the Draft Site-Specific Turkey Point Environmental Impact Statement PMNS20230973, Public Meeting to Receive Comments on the Draft Site-Specific Turkey Point Environmental Impact Statement2023-09-0707 September 2023 Public Meeting to Receive Comments on the Draft Site-Specific Turkey Point Environmental Impact Statement PMNS20230932, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-08-14014 August 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230879, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-08-0101 August 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230809, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-07-11011 July 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230775, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-06-30030 June 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230732, Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request for Transition to a 24-month Fuel Cycle for Turkey Point Generating Unit Nos. 3 and 42023-06-26026 June 2023 Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request for Transition to a 24-month Fuel Cycle for Turkey Point Generating Unit Nos. 3 and 4 PMNS20230718, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-06-12012 June 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230673, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-05-26026 May 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230599, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-05-15015 May 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230594, Annual Assessment Meeting2023-05-0404 May 2023 Annual Assessment Meeting PMNS20230447, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-04-20020 April 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230449, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-04-18018 April 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230409, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-04-11011 April 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230253, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-04-0707 April 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230278, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-04-0303 April 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230308, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-03-27027 March 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230226, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-03-0707 March 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230223, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-03-0606 March 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230192, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-03-0101 March 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230168, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-02-22022 February 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230134, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-02-22022 February 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230159, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-02-15015 February 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230049, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-01-27027 January 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230080, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-01-26026 January 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230060, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-01-18018 January 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230003, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-01-0505 January 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20221243, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Planned Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 32022-12-0202 December 2022 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Planned Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and PMNS20221177, Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request for Transition to a 24-month Fuel Cycle Turkey Point Generating Unit Nos. 3 and 42022-11-22022 November 2022 Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request for Transition to a 24-month Fuel Cycle Turkey Point Generating Unit Nos. 3 and 4 PMNS20221132, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2022-10-31031 October 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20221080, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2022-10-17017 October 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20221057, Meeting Between the U.S. Nuclear Regulatory Commission and Florida Power & Light Company to Discuss Review of Digital Instrumentation and Controls License Amendment Requests for Turkey Point Nuclear Generating, Units 3 and 42022-10-11011 October 2022 Meeting Between the U.S. Nuclear Regulatory Commission and Florida Power & Light Company to Discuss Review of Digital Instrumentation and Controls License Amendment Requests for Turkey Point Nuclear Generating, Units 3 and 4 PMNS20220997, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2022-10-0303 October 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20220876, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss Review of Defense-in-Depth and Diversity (D3) Evaluation for Turkey Point Nuclear Generating, Units 3 and 4 (Turkey Point)2022-09-22022 September 2022 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss Review of Defense-in-Depth and Diversity (D3) Evaluation for Turkey Point Nuclear Generating, Units 3 and 4 (Turkey Point) PMNS20220998, Notice of Meeting with Florida Power and Light Company (FPL) Regarding Turkey Point Setpoint Methodologies as It Relates to the Improved Technical Specification (ITS) Conversion License Amendment Request2022-09-22022 September 2022 Notice of Meeting with Florida Power and Light Company (FPL) Regarding Turkey Point Setpoint Methodologies as It Relates to the Improved Technical Specification (ITS) Conversion License Amendment Request PMNS20220935, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests2022-09-0909 September 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests PMNS20220930, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss Acceptance Review of the Turkey Point Digital Instrumentation and Controls License Amendment Request2022-09-0808 September 2022 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss Acceptance Review of the Turkey Point Digital Instrumentation and Controls License Amendment Request ML22227A1302022-08-17017 August 2022 License Amendment Request Reactor Trip Breaker Completion Time Extension - Public Meeting August 17, 2022 (EPID L-2022-LRM-0061) (Slides) PMNS20220832, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests2022-08-16016 August 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests PMNS20220799, Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request to Extend the Completion Time for an Inoperable Reactor Trip Breaker for the Turkey Point Generating, Unit Nos. 3 and2022-08-16016 August 2022 Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request to Extend the Completion Time for an Inoperable Reactor Trip Breaker for the Turkey Point Generating, Unit Nos. 3 and 4 PMNS20220748, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests2022-08-0303 August 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests PMNS20220701, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-07-14014 July 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request PMNS20220683, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-06-28028 June 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request ML22172A2172022-06-22022 June 2022 LAR: Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project (Non-Proprietary) PMNS20220609, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-06-14014 June 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request PMNS20220582, Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request to Replace Reactor Coolant Pump Seals for the Turkey Point Generating Unit Nos. 3 and 42022-06-10010 June 2022 Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request to Replace Reactor Coolant Pump Seals for the Turkey Point Generating Unit Nos. 3 and 4 PMNS20220592, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-06-0606 June 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request ML22144A3902022-05-24024 May 2022 RCP Seal Solutions - May 24 2022 Slide Material (Public) PMNS20220454, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-05-17017 May 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request PMNS20220478, Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request to Replace Reactor Coolant Pump Seals for the Turkey Point Generating Unit Nos. 3 and 42022-05-11011 May 2022 Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request to Replace Reactor Coolant Pump Seals for the Turkey Point Generating Unit Nos. 3 and 4 2023-09-07 |
Text
April 11, 2022
Title:
Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request To Replace Reactor Coolant Pump Seals for the Turkey Point Generating Unit Nos. 3 and 4.
Date(s) and Time(s): April 26, 2022, 01:00 PM to 03:00 PM ET Location: Webinar Category: This is a Partially Closed meeting. Certain portions of this meeting will be closed to the public because the staff has determined that the information (is proprietary in nature, contains safeguards information, etc.).
Purpose:
NextEra Energy/Florida Power & Light Company (NextEra/FPL) and the U.S. Nuclear Regulatory Commission (NRC) will discuss the planned license amendment request to replace reactor coolant pump seals for the Turkey Point Generating Unit Nos. 3 and 4.
Contact:
Michael Mahoney 301-415-3867 Michael.Mahoney@nrc.gov
Participants:
NRC External Office of Nuclear Reactor Regulation NextEra Energy, FPL Bridge Number Conference ID Pass Code Teleconference:
(301) 376-2978 N/A 853000397 URL Meeting Number Password Webinar:
https://teams.microsoft.com/l/meetup- N/A N/A join/19%
3ameeting_NjAzNDYxMGYtNTIxNC00NDF kLTljM2MtNTYwOWRlNWYxZGJm%
40thread.v2/0?context=%7b%22Tid%22%
3a%22e8d01475-c3b5-436a-a065-5def4c64f52e%22%2c%22Oid%22%3a%
22681bf4ab-0620-4039-a625-9b43f7210f36%22%7d Docket No: 05000250 05000251 Comments: Interested members of the public can participate in this meeting via video conference or telephone conference. Microsoft Teams is the video conferencing platform that will be used for this meeting. The meeting times are for Eastern time zone. For additional details, please call the NRC meeting contact listed on the NRC public meeting notice or call the NRC's toll-free number, 1-800-368-5642, and ask the operator to be connected to the meeting contact (state the name of the individual).
The NRC provides reasonable accommodations to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in a meeting or need a meeting notice or the transcript or other information from a meeting in another format (e.g. braille, large print), please contact Anne Silk, NRC Reasonable Accommodations Coordinator, at Anne.Silk@nrc.gov or call directly at 301-287-0745.
Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Ten (10) days advance notice is requested to try to ensure availability; however, every effort will be made to address a request for reasonable accommodations with less notice.
PUBLIC MEETING AGENDA
Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request To Replace Reactor Coolant Pump Seals for the Turkey Point Generating Unit Nos. 3 and 4.
April 26, 2022, 01:00 PM to 03:00 PM ET Webinar
ADAMS Accession Number: ML22112A110 Distribution:
Office NRR/DORL NRR/DORL NRR/DORL Name DWrona RButler MMahoney Date 04/11/2022 04/11/2022 04/11/2022 OFFICIAL RECORD COPY Link to meeting details: https://www.nrc.gov/pmns/mtg?do=details&Code=20220366 Commission's Policy Statement on "Enhancing Public Participation in NRC Meetings" 86 FR 14964, March 19, 2021 ADAMS No. ML21050A046 https://www.nrc.gov/reading-rm/doc-collections/commission/policy/index.html