PM-88-030, Monthly Operating Rept for Jan 1988

From kanterella
(Redirected from PM-88-030)
Jump to navigation Jump to search
Monthly Operating Rept for Jan 1988
ML20147C034
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 01/31/1988
From: Polis T, Steiger W
LONG ISLAND LIGHTING CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
PM-88-030, PM-88-30, NUDOCS 8803020304
Download: ML20147C034 (4)


Text

, , . - . ,c .,--

. :, .e N.,L ; , . ~ '

r.

it??$, f.c .-( 4 >

-y .

Appendix12.6-

' ,N .Page 1.of-1 J-  ;

s

c.

LSHOREHAM NUCLEAR POWER STATION e . AVERAGE DAILY' UNIT POWER LEVE1!

c i- ,

' C DOCKET No; 322 -

..o 64 '

UNIT l' DATE 2/1/88 COMPLETED BYT. Polis TELEPHONE (516)929-8300,

= MO: TH January 1988

.DAT AVERAGE DIILY POWER LEVEL' DAY AVERAGE DAILY-POWER LEVEL:

(MWe-Ket) -(MWe-Net) 1 0- 17 0 2 0 18 -0 1 3' O 19 0
c. 4; O 20 -0 5- 0 21 0

'6~ 0- 22 0 7- 0 23 0 l8 0- 24 0 9'. 0 25 0 10 0 26 0 11 0 27 0 12 0 28 _

0 13 0 29 0 14 0 30 0 15 0 31 0 16 0 l

SPF 51.005.01-5 Rev. 3 1

l' N

SP 51.005.01 Rev. 3

- 8803020304 880131 (i Page 20  %

}

- PDR ADOCK 05000322 '

, ,-R . ,DCD

c l0.db s

+

Appendix 12.7

. Page 1 of 1 SHOREHAM-NUCLEAR POWER STATION OPERATING DATA REPORT DOCKET No. 50-322 UNIT 1 DATE 2/1/88-

_ - COMPLETED BYT Polis TELEPHONE ~(516)929-8300 OPERATING STATUS 1-. Reporting Period: 1/88 Grcss hours in Reporting-Period 744

2. Currently Authorized Power Level (MWt): 121.8 Max. Depend. Capacity (MWe-Net): 839 '

Design' Electrical Rating-(MWe-Net): 844

3. Power Level to.which Restricted (if any) (MWe-Net): N/A
4. Reasons for Restriction (if any):

This month Yr to Date Cumulative-

5. Number of Ecurs Reactor was Critical........... 0 0 __123 7
6. Reactc/r Reserve Shutdown Hours................. 744 744 12.101.6
7. Herts Generator on L1ne........................ 0 0 32.8
8. Fait Reserve Shutdown Hours.................... 0 0 0 St . Gn,ss Thermal Energy Generated (MWM)........... 0 0 6.490
10. Gros's' Electrical Energy Generated (MWH)........ 0 0 580
11. Net Electrical Energy Generated (MWH) . . . . . . . . . . 0 0 315
12. Re a c t or S e rvic e Fac t or . . . . . . . . . . . . . . . . . . . . . . . . . N/A N/A N/A
13. Reactor Availability Factor.................... N/A N/A N/A
14. Unit Service Factor............................ N/A N/A N/A
15. Unit Availability Factor....................... N/A N/A N/A
16. Unit Capacity Factor (Using MDC)............... N/A N/A e]/A
17. Unit Capacity Factor (Using Design MWe)........ N/A N/A N/A 18.' Unit Forced Outage Rate........................ N/A __ ,N/A__ __, N /A
19. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Post 5% Operations Shutdown, Ctart Date 7/87

20. If Shut Down at end of Report Period, Estimated Date of Startup: N/A
21. Units in Test Status (Prior to Commercial Operation): FORECAST ACHIEVED INITIAL CRITICALITY 2/13/85 7 /19 /R; INITIAL ELECTRICITY 9/1/86 R/?A/RA COMMERCIAL OPERATION *
  • To be determined upon issuance of NRC Full Power Operating SPF 51.005.01-6 Rev. 3 License.

SP 51.005.01 Rev. 3 Page 21

x ,, ..

.. w ....J

Appendix'12.8. f Page'1
of 1, ..

.+

~

S110RF11AM NUCLEAR POWER STATION ,

UNIT Situ'IDOWNS ANI) POWER REDUC 110NS '-.

DOCKET No. 50-322 -

UNIT 1 DATE 2/1/88 -

- COMPLETED BY T. Polis -

TELEP110NE -(516) 929-8300 :

FEPORT MONTH January 1988 METilOD OF TYPE SI:UTTING DOWN F: FORCED DURATION Tile REACTOR OR NO. DATE S: ScilEDULED (Il0URS) REASON (1) REDUCING' POWER (2) CORRECTIVE ACTIONS /C0t}IEhTS 3 87060C S 744 Post 5% Controlled Shutdown None ~

Operations S'nutdown SU)2:ARY:

SPF 51.005.01-7 Rev. 3

. .s SP 51.005.01 Rev. 3

.Page 22

.: w

.' :s ida----n-g,/Ej@ f LONG ISLAND LIGHTING COMPANY

$ww.4am-.w.ua w. vn a SHOREH AM NUCLE AR POWE R ST ATION

  • P.O. BO X 628
  • W ADING RIVE R, NEW YORK 11792 TE L (516) 929 8300 February 3, 1988 PM-88-030 Director, Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Sir:

In accordan;e with 7.echnical Specifications Section 6.9.1.8, enclosed is a copy of the Shoreham Nuclear Power Station's January Monthly Operating Report which summarizes the operating statistics and shutdown experience of the Plant.

If you have any questions, please contact us.

Very truly yours,

%, Y i gp 0NG W.E. Ste ger, Jr. .

Plant Manager j ty/

WES/pz Enclosure cc: William T. Russell, Regional Administrator Frank Crescenzo, Resident Inspector Institute of Nuclear Power Operations, Records Center American Nuclear Insurers SR-A43.700 s\

F C-868 2. 2

-