Monthly Operating Rept for Nov 1985
ML20138E138
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 11/30/1985
From: Kelly D, Steiger W
LONG ISLAND LIGHTING CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
PM-85-280, NUDOCS 8512130351
Download: ML20138E138 (4)


Text

.

SHOREHAM NUCLEAR POWER STATION AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-322 1

,,. UNIT DATE 12-3-85 COMPLETED BY D. Kelly TELEPHONE (516)929-8300 MONTH November 1985 DAY AVERACE DAILY POWER LEVEL DAY AVERACE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 17 0 l 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0' 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 o 28 0 13 n 29 0 14 n 30 0 15 n 31 16 n SPF $1 905 01-5, Rev. 6 r:

gb -f 8512130351 851130 gon aoocaoeOOggg2 g

,- a

~

SHOREHAM NUCLEAR POWER STATION OPERATING DATA REPORT DOCKET NO. 50-322 UNIT 1 DATE 12-3-85 t

COMPLETED BY D. Kelly TELEPHONE (516)929-8300 OPERATING STATUS

1. Reporting Period: 11/85 Gross Hours in Reporting Period 0
2. Currently Authorized Power Level (MWt): 121.8 Max. Depend. Capacity (MWe-Net): 639 Design Electrical Rating (MWe-Net): 844
3. Power Level to which Restricted (if any) (MWe-Net): N/A 4 Reasons for Restriction (if any):

This month Yr to Date Cumulative

5. Nu=ber of Hours Reactor was Critical.......... 0 0 0
6. Reac tor Rese rve Shutdown Hours. . . . . . . . . . . . . . . . 0 0 0
7. Hours Generator on Line....................... 0 0 0
8. Unit Re se rve Shutd own Hours. . . . . . . . . . . . . . . . . . . 0 0 0
9. Gros s The rmal Energy Generated (MWH)... . .... . . 0 0 0
10. Gross Electrical Energy Generated (MWH)....... 0 0 0
11. Net Electrical Energy Generated (MVH)......... 0 0 0
12. Reactor Service Factor........................ N/A
13. Reactor Availability Factor................... N/A
14. Uni t S e rvic e Fa c t o r. . . . . . . . . . . . . . . . . . . . . . . . . . . N/A
15. Unit Availability Factor...................... N/A
16. Unit Ca pacity Factor (Using MDC). . . . . . . . . . . . . . N/A
17. Unit Capacity Factor (Using Design MWe)....... N/A
18. Unit Forced Outage Rate....................... N/A
19. Shutdowns Scheduled Over Next 6 Months (Type, Date, And Duration of Each):
20. If Shut Down at end of Report Period, Estimated Date of Startup: N/A
21. Units in Test Status (Prior to Commercial Operation): FORECAST ACHIEVED INITIAL CRITICALITY 2/13/85 2/15/85 INITIAL ELECTRICITY 1/1/86 COMMERCIAL OPERATION 6/1/86 SPF 51.005.91-6, Rev. $

^~ . _ . . _. .

o =

1 .

, e Sil0REllAM NUCLEAR POWER STATION UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET No. 50-3??

I UNIT NAME DATg 12-3-85 COMPLETED BY D. Kelly

?

TELEPHONE (516)929-8300 REPORT HONTH November 1985 METHOD OF SHUTTING DOWN TYPE DURATION THE REACTOR OR F: FORCED CORRECTIVE ACTIONS / COMMENTS NO. DATE S: SCHEDULED (HOURS) REASON (1) REDUCING POWER (2)

None

SUMMARY

Significant effort was expended during the month performing Environmental Qualification Modifications on station equipment.

SPF 51.995.$1-7, Rev. g

. . ~ , , ,.

E,4*O ,. LONG ISLAND LIGHTING COM PANY

m. w s , . m.o ,,,

SHOREH AM NUCLE AR POWER ST ATION = P.O BOX 628

  • WADING RIVE R, NEW VORK 11792 j TE L. (516) 929 8300 l

December 3, 1985 PM-85-280 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Sir:

In accordance with Technical Specifications Section 6. 9.1. 8, enclosed is a copy of the Shoreham Nuclear Power Station November Monthly Report which summarizes the operating statistics and shutdown experience of the Plant.

If you have any questions, please contact us.

Very truly yours, V /

W. E. Stei er, Jr.

Plant Manager WES/km Enclosure ec: Dr. Thomas Murley, Regional Administrator John Berry , Senior Resident Inspector Institute of Nuclear Power Operations, Records Center American Nuclear Insurers SR-A43.700 FC GG82.2, l