SHOREHA'! NUCLEAR POWER STATION AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-322
,,. UNIT 1
DATE 9/7/85 i
COMPLETED BY D.
Keliv TELEPH0!.*E ( 5161929-8300 MONTH Auaust 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) l t
17 o
1 0
18 n
2 o
19 n
3 0
20 n
4 o
21 n
5 n
22 n
6 o
23 n
7 n
24 n
6 o
9 n
25 n
26 n
10 0
27 n
11 o
28 n
12 0
29 13 n
n 14 30 n
n 15 31 0
n 16 o
SPF 51.925.91-5, Rev. 6 k
'k 8511180815 850831
/
\\
PDR ADOCK 05000322 R
pyg
)
SHOREHAM NUCLEAR POWER STATION OPERATING DATA REPORT DOCKET NO. 50-322
, UNIT I
DATE 9/7/85 t
COMPLETED BYn. Kn11v TELEPHONE (sin 3990_gaoo OPERATING STATUS 1.
Reporting Period: afgg Cross Hours in Reporting Period 0
2.
Currently Authorizet Power Level (MWt): 121,8 Max. Depend. Capacity (MWe-Net): 839
~
Design Electrical Rating (MWe-Net):
844 3.
Power Level to which Restricted (if any) (MWe-Net): N/A 4.
Reasons for Restriction (if any):
This month Yr to Date Cumulative 5.
Number of Hours Reactor was Critical..........
0 0
0 6.
Reactor Reserve Shutdown Hours................
0 0
0 7.
Hours Generator on Line.......................
0 0
0 8.
Unit Re se rve Shut d own Hour s...................
0 0
0 9.
Cros s The rmal Ene rgy Generat ed (MWH)..........
0 0
0
- 10. Gross Electrical Energy Generated (MWH).......
o 0
0
- 11. Ne t Ele ct ri cal Energy Generat ed (MVH).........
n n
n
- 12. Re a c t o r Se rvic e Fa c to r........................
y /A
- 13. Rea ct o r Ava ila bili ty Fa ctor...................
y /r
- 14. Unit Service Factor...........................
n/a
- 15. Uni t Ava ila bili ty Fa c t o r......................
y/A
- 16. Unit Capacity Factor (Using MDC)..............
y /A
- 17. Unit Capacity Factor (Using Design MWe).......
y /3
- 18. Unit Forced Outage Rate.......................
n/A
- 19. Shutdowns Scheduled Over Next 6 Months (Type, Date, And Duration of Each):
- 20. If Shut Down at end of Report Period, Estimated Date of Startupt y /A
- 21. Units in Test Status (Prior to Commercial Operation):
FORECAST ACHIEVED INITIAL CRITICALITY 9 /11/ s s 2/19/85 INITIAL ELECTRICITY in/1/Rs COMMERCIAL OPERATION M6 SPF 51 005.01-6, Rev. 6 j
wa j
Sil0REllAM NUCLEAR POWER STATION UNIT SituTDOWNS AND POWER REDUCTIONS DOCKET No. 50-122 UNIT NAME 1
DATE 9 /7 /85 COMPLETED BY D. Keliv TELEPHONE (516)929-8300 REPORT MONTil 8/85 METHOD OF SHUTTING DOWN TYPE F: FORCED DURATION THE REACTOR OR NO.
DATF S: SCHEDULED (HOURS)
REASON (1)
REDUCING POWER (2)
CORRECTIVE ACTIONS / COMMENTS NONE h the month of August.
SUMMARY
- The heatup phase of testing for the Power Ascension Test Program has SPF 51.dd5.di-7, key. $
~
p.
[</ Muff /Apr!546#E4*O LONG ISLAND LIGHTING COM PANY SHOREH AM NUCLE AR POWE R ST ATION
- P O BO X 628
- W ADING A
- V E H NE W YOHK 11792 TEL (5161929 8300 Seotember 9.
1985 W - 6 5 ' 13 Director. Office of Resource w a n a c erae n t U. S.
Nuclear RegulatorV Comra i s s i on Wasnington.
D. C.
205S5
Dear Sir:
In accorcance with lechnical boecifications Section b. 9.1. 8, enclosed is a coOV of the Shorenam 14uclear Dower Station HuCust v.onthly Heoort whicn sumoarizes the caeratinc Gtatistics and shutdown eXDerlence of the Olant.
If you have any cuestions. olease contact us.
Verv trulv vours.
/
Yf.
'\\
4/
y W. E.
St toer, Jr.
Plant n:a na c e r WE5/km Enclosure cc:
Dr. Th o raa s Murlev, Hecional Administrator John Berry Senior desident Insoector Institute of Nuclear Power Doeratlons. Recorce Center American r*uclear Insurers SR-G43.700 f