PM-85-155, Monthly Operating Rept for Jul 1985

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jul 1985
ML20132H238
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 07/31/1985
From: Kelly D, Steiger W
LONG ISLAND LIGHTING CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
PM-85-155, NUDOCS 8510020100
Download: ML20132H238 (5)


Text

_ ___ - ____ _ __ _ _ __ _____

F SHOREHAM NUCLEAR POWER STATION OPERATING DATA REPORT DOCKET NO. 50-322 UNIT i DATE g/g/gs COMPLETED BY n_ gg11y TELEPHONE (516)929-8300 OPERATING STATUS

1. Reporting Period: 7/85 Gross Hours in Reporting Period 0
2. Currently Authorized Power Level (MWt): 121.8 Max. Depend. Capacity (MWe-Net): 839 Design Electrical Rating (MWe-Net): 844
3. Power Level to which Restricted (if any) (MWe-Net): N/A
4. Reasons for Restriction (if any):

This month Yr to Date Cumulative

5. Number of Hours Reactor was Critical.......... 0 0 0
6. Reac tor Rese rve Shutdown Hours. . . . . . . . . . .~. . . . . 0 0 0
7. Hours Generator on Line....................... 0 0 0
8. Unit Re se rve Shutd own Hours. . . . . . . . . . . . . . . . . . . 0 0 0
9. Gros s The rmal Energy Generated (MWH). . . . . . . . . . 0 0 0
10. Gross Electrical Energy Generated (MWH)....... 0 0 0
11. Net Electrical Energy Generated (MWH)......... 0 0 0
12. Re ac to r Se rvic e Fa c to r. . . . . . . . . . . . . . . . . . . . . . . . N/A
13. Reactor Availability Factor................... N/A
14. Unit S e rvic e Fa c to r. . . . . . . . . . . . . . . . . . . . . . . . . . . N/A
15. Unit Availability Factor...................... N/A
16. Unit Capacity Factor (Using MDC). . . . . . . . . . . . . . N/A
17. Unit Capacity Factor (Using Design MWe)....... N/A
18. Unit Forced Outage Rate....................... N/A
19. Shutdowns Scheduled Over Next 6 Months (Type, Date, And Duration of Each):
20. If Shut Down at end of Report Period, Estimated Date of Startup: N/A
21. Units in Test Status (Prior to Commercial Operation): FORECAST ACHIEVED INITIAL CRITICALITY 2/11/8s 7/1s/Rs INITIAL ELECTRICITY 9/1/gs COMMERCIAL OPERATION 10 /1 /s s SPF 51.005.01-6, Rev. 6 B510020100 850731 .j b #://

PDR ADOCK 05000322 --

f; PDR -l }

R

SHOREHAM NUCLEAR POWER STATION AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-322 UNIT 1

~

DATE 8/6/85 1

COMPLETED BYD. Kelly TELEPHONE (516) 929-8300 MONTH July 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0

-12 0 28 0 13 0 29 0

-14 0 30 0 15 0 31 0 16 _

0 SPF 51.905 01-5, Rev. 6 D

~

. - . . . .- -. ._ 1-- - . _ _ . . _ . , . . _ _ _ . . . , . . . _ . . _ . , _ . , _ . , _ _ _ _ _ _ , , , _ . ..--.__,_.___!

i SHOREHAM NUCLEAR POWER STATION UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET No. 50-322 UNIT NAME 1 ,

DATE 8/6/85 COMPLETED BY D. Kelly l TELEPHONE (516) 929-8300 REPORT MONTH .7/85 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO. DATE S: SCHEDULED (HOURS) REASON (1) REDUCING POWER (2) CORRECTIVE ACTIONS / COMMENTS NONE L

l I

t l

A five percent license was received on July 3, 1985. The heatup phase of' testing for the Power Ascension l

SUMMARY

Test Program commenced on July 7, 1985 and is still in progress as of July 31, 1985

.s l SPF 51.995 91-7, Rev. 9 ~

u

A a

E_g'O LONG ISLAND LIGHTING COM PANY SHOREHAM NUCLE AR POWER ST ATtON . P.O BO X 628 W AOiNG RIVE R. NEW YORK 11792 l 1

TE L. (516) 929 8300 l l

August 12, 1985 pM-85-155 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Sir:

In accordance with Technical Specifications Section 6.9.1.8, enclosed is a copy of the Shoreham Nuclear Power Station July Monthly Report which summarizes the coerating statistics and shutdown. experience of the Plant.

If you have any questions, please contact us.

Very truly yours,

'e4 W. E. Stelge', Jr.

Plant Manager WES/km Enclosure cc: Dr. Thomas Murley, Regional Administrator John Berry , Senior Resident Inspector Institute of Nuclear Power Operations, Records Center American Nuclear Insurers SR-A43.700 psfsk I