Monthly Operating Rept for Mar 1985
ML20129J472
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 03/31/1985
From: Macina R, Steiger W
LONG ISLAND LIGHTING CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
PM-85-050, PM-85-50, NUDOCS 8506100099
Download: ML20129J472 (4)


Text

,-

SHOREHAM NUCLEAR POWER STATION OPERATING DATA REPORT DOCKET NO. 50-322 UNIT I DATE 4/3/85 COMPLETED BY R. Macina

. TELEPHONR516)929-8300 OPERATING STATUS

1. Reporting Period: 3/85 Gross Hours in Reporting Period 0
2. Currently Authorized Power Level (MWt): 0.024 Max. Depend. Capacity (MWe-Net): 839 Design Electrical Rating (MWe-Net): 844
3. Power Level to which Restricted (if any) (NWe-Net): N/A
4. Reasons for Restriction (if any):

This month Yr to Date Cumulative

5. Number of Hours Reactor was Critical.......... 0 $ $
6. Reactor Reserve Shutdown Hours................ 0 0 0
7. Hours Generator on Line....................... 0 0 0
8. Unit Reserve Shutdown Hours................... 0 0 0
9. . Gros s The rmal Energy Generat ed (MWH). . . . . . . . . . 0 0 0
10. Gross Electrical Energy Generated (MWH)....... 0 0 0
11. Net Electrical Energy Generated (MWH)......... 0 0 0
12. Reactor Service Factor........................ N/A
13. Rea ct o r Ava ila bili ty F4 c t or. . . . . . . . . . . . . . . . . . . N/A
14. Uni t S e rvic e Fa c t o r. . . . . . . . . . . . . . . . . . . . . . . . . . . N/A
15. Uni t Ava ila bili ty Fa ct or. . . . . . . . . . . . . . . . . . . . . . N/A
16. Unit Ca pacity Factor (Using MDC). . . . . . . . . . . . . . N/A
17. Unit Capacity Factor (Using Design MWe)....... N/A
18. Unit Forced Outage Rate....................... N/A
19. Shutdowns' Scheduled Over Next 6 Months (Type, Date, And Duration of Each):
20. If Shut Down at end of Report Period, Estimated Date of Startup: 6/1/85
21. Units in Test Status (Prior to Commercial Operation): FORECAST ACHIEVED INITIAL CRITICALITY 2/13/85 2/15/85 INITIAL ELECTRICITY 7/01/85*

COMMERCIAL OPERATION 11/30/85*

SPF 51.005.01-6, Rev. 0 .

  • Assumes no delay in plant licensing activities.

gN 8506100099 DR 850331 ADOCK 05000322 I /

I/

PDR

m- .a

~

4

.p'

}!--

[ SHOREHAM NUCLEAR POWER STATION AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.56-322 UNIT 1 DATE 4/3/85

~ '

COMPLETED BY ' R. Macina TELEPHONE (516) 929-8300 iMONTH - March 1985

--DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net). (MWe-Net) 1 6 17 6 2 6 18 6 3 6 19 6 4' 6 20 6 5 6 21 6

6: -6 22 6 7 -- 6 23 6 8 6 24 6

.9 6 25 6

~ 1'O 6 . 26- 6 11- 6 27' 6 12 6- 28 6

'13' 6 29 6 I4~

1 6 30 6

.15 ~ 6 31 6

'16- 6

SPF
51.665.61-5, Rev. 6

~

S110REHAM NUCLEAR POWER STATION UNIT SilUTDOWNS AND POWER REDUCTIONS '

DOCKET No. 50-322 UNIT NAME 1 DATE 4/3/85

.~ COMPLETED BY R. Macina TELEPHONE (516) 929-8300 REPORT MONTH 3/85 METil0D OF TYPE SilUTTING DOWN ,

F: FORCED DURATION Tile REACTOR OR NO. DATE S: SCHEDULED (HOURS) REASON (1) REDUCING POWER (2) CORRECTIVE ACTIONS / COMMENTS

- NONE -

SUMMARY

Initial Criticality achieved 2/15/85, awaiting 5%' power license. .

SPF 51.995.01-7,,Rev. 9

E,g LONG ISLAND LIGHTING COMPANY SHOREHAM NUCLE AR POWER STATION

  • P.O. BOX 628 a WADING RIVER, NEW YORK 11792 TE L. (516) 929-8300 April 10, 1985 PM-85-050 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Sir:

In accordance with Technical Specifications Section 6.9.1.8, enclosed is.a copy of the Shoreham Nuclear Power Station March Monthly Report which summarizes the operating statistics and shutdown experience of the Plant.

If you have any questions, please contact us.

Very truly yours,

/

W. E. Steig r, Jr.

Plant Manager WES/km Enclosure cc: Dr. Thomas Murley, Regional Administrator P. Eselgroth, Senior Resident Inspector Institute of Nuclear Power Operations, Records Center American Nuclear Insurers SR-A43.700 fis ,