PM-82-651, Forwards Monthly Operating Repts for May 1982

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Repts for May 1982
ML20054E989
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 06/08/1982
From: Nix H
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20054E990 List:
References
PM-82-651, NUDOCS 8206150110
Download: ML20054E989 (1)


Text

w Georgia Pcwer Company Post Offico C:x 439 B::xicy, Georgia 31513 Telephone 912 367-7781 912 537-9444 GeorgiaPower Edwin 1. Hatch Nuclear Plant June 8, 1982 PM-82-561 PLANT E.

I.

HATCH NRC Monthly Operating Report Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission Washington, D. C.

20555

Dear Sir:

Per Tech Specs section 6.9.1.6 please find attached the NRC Monthly Operating Report for Hatch Unit 1, Docket # 50-321 and Hatch Unit 2, Docket #50-366.

f H. C. b(if Plant MWnager HLS/hh N

2 F206150110 820608 PDR ADOCK 05000321 R

PDR