PM-82-388, Forwards Monthly Operating Rept for Apr 1982

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Apr 1982
ML20052F556
Person / Time
Site: Hatch 
Issue date: 05/04/1982
From: Nix H
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20052F558 List:
References
PM-82-388, NUDOCS 8205130184
Download: ML20052F556 (1)


Text

-

Georpi Pow r Comp:ny Post Offics Box 439 81.xt:y, G:orgia 31513 Telephone 912 367-7781 912 537-9444 GeorgiaPower Edwin 1. Hatch Nuclear Plant May 4, 1982 PM-82-388 PLANT E.

I. IIATCli NRC Month 1y Operating Report Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission Washington, D.

C.

20555

Dear Sir:

Per Tech Specs section 6.9.1.6 please find attached the NRC Monthly Operating Report for llatch Unit 1, Docket #50-321.

b de 6

4 ti.

C.

.ipx i

Plant Manager p

RECEIVED IILS/hh F

MAY 131982* $

u E GA E 8 "' *5

  • 3
  1. 35 g

N i

['

I l

8205130184 820504 PDR ADOCK 05000321 PDR p