PM-82-282, Forwards Monthly Operating Repts for Mar 1982
Jump to navigation
Jump to search
| ML20054B133 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 04/08/1982 |
| From: | Nix H GEORGIA POWER CO. |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20054B134 | List: |
| References | |
| PM-82-282, NUDOCS 8204160344 | |
| Download: ML20054B133 (1) | |
Text
r Georgia Power Company i
Post Office Box 442 Baxley. Georgia 31513 Telephone 912 367 7781 912 537 9444 Georgia Power Edwin 1. Hatch Nuclear Plant t!v sout%rn ekttre syst< m April 8, 1982 PM-82-282 PLANT E.
I. HATCH NRC Monthly Operating Report Of fice of Plans and Schedules Directorate of Licensing United States Nuclear Regulatory Commission Washington, D. C.
20545
Dear Sir:
Per Tech Specs section 6.9.1.6 please find attached the NRC Monthly Operating Report for Hatch Unit 1, Docket #50-321.
h^L1 be H. C. Nif Plant Mana/
ger l
HLS/hh 3
g 4
~
./
</
,8? f.? x S
'Y t7 Q
T t$
[
i
+'
&. 0 e
N s
%b
.c 8204160344 820408 PDR ADOCK 05000321 R
PDR I