PM-82-190, Forwards Monthly Operating Rept for Feb 1982

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Feb 1982
ML20041F330
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 03/05/1982
From: Manry M
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20041F331 List:
References
PM-82-190, NUDOCS 8203160399
Download: ML20041F330 (1)


Text

.

Georgia Pow;r Company Post offica Box 439 B;:lIy, Georgia 31513 Telephone 912 367 7781 912 537-9444 Georgia Power Edwin 1. Hatch Nuclear Plant March 5, 1982 PM-82-190 PLANT E.

I. liATCII NRC Monthly Operating Report Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission Washington, D. C.

20555

Dear Sir:

Per Tech Specs section 6.9.1.6 please find attached the NRC Monthly Operating Report for liatch Unit 2, Docket #50-366.

4t,t e LtdL 5

/3 M. Manry Plant Manager CLC/hh u>

2 l

IlGc0'/ Pro 1

2 NAR l

i

$b 0

,k 6

1 s' 1 8203160399 820305 PDR ADOCK 05000366 R

PDR