PM-82-190, Forwards Monthly Operating Rept for Feb 1982
Jump to navigation
Jump to search
| ML20041F330 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 03/05/1982 |
| From: | Manry M GEORGIA POWER CO. |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| Shared Package | |
| ML20041F331 | List: |
| References | |
| PM-82-190, NUDOCS 8203160399 | |
| Download: ML20041F330 (1) | |
Text
.
Georgia Pow;r Company Post offica Box 439 B;:lIy, Georgia 31513 Telephone 912 367 7781 912 537-9444 Georgia Power Edwin 1. Hatch Nuclear Plant March 5, 1982 PM-82-190 PLANT E.
I. liATCII NRC Monthly Operating Report Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission Washington, D. C.
20555
Dear Sir:
Per Tech Specs section 6.9.1.6 please find attached the NRC Monthly Operating Report for liatch Unit 2, Docket #50-366.
4t,t e LtdL 5
/3 M. Manry Plant Manager CLC/hh u>
2 l
IlGc0'/ Pro 1
2 NAR l
i
$b 0
,k 6
1 s' 1 8203160399 820305 PDR ADOCK 05000366 R