PM-82-096, Forwards Monthly Operating Rept for Jan 1982
| ML20040H512 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 02/05/1982 |
| From: | Manry M GEORGIA POWER CO. |
| To: | NRC |
| References | |
| PM-82-096, PM-82-96, NUDOCS 8202180327 | |
| Download: ML20040H512 (1) | |
Text
-.
Georgi: Prair Company Post office B x 439 B J:1 y, Georgi 31513 Telephone 912 367 7781 912 537-9444 Edwin 1. Hatch Nuclear Plant February 5, 1982 PM-82-096 o
b.'S s
PLANT E.
I. HATCH
_U I',
NRC Monthly Operating Report
[f VED (1 ? 19Bk c
- * : a (.z.,
'R Office of Plans and Schedules
' - ;A.s s0 u
Director 9te of Licensing United States Nuclear Regulatory Commission N /} j _ ' f\\
; I Washington, D. C.
20545
Dear Sir:
Per Tech Specs section 6.9.1.6 please find attached the hTC Monthly Operating Report for Hatch Unit 2, Docket #50-366.
- h%
AL4Q.-
M. Manry Plant Manager CLC/hh foo3 l {
8202180327 820205 DR ADOCK 05000366 PDR
h*M M&T
.LW 4M' O'
h Georgia l'oner a(s j
f 1
uv 1
D 4 OPERATING DATA REPORT y %
00 C E E L_N Q m 3 0 -3 6 6
_ M 4%
DATE 02-10 P i
- - - - TO COMPIETED_BY_JAH_ARHETJE_
l 9
T E L E P H O.H E__( ? ! 2 )._16 Z -Z.Z S ig_2 0 3 O
GomCSr.1US m....................
..otes 1.
Unit Hanes E.I. Hatch Nuclear Plant Unit 2 2.
Reporting Period: 01-82 G
3.
Licenred Thernal Power (MWt): 2436 4.
Haneplate Pating (Cross MWe): 817.0 j
- 5. Design Electrical Rateng (Net M W e p s, 784.0 1
6._Maximun Dependcote Capacity (Cross MWe): 803 9 7.
Marinum Dependable Capccitu (Net MWe): 770.9 Capacity _ R o t i n g s _( I t e m s, N u m b e r_3 Through_7) Sen.co.Last Report, Give F o n.s 8.
Ir Changer Occur in 1
G 9.
Power Level To Wnich Restricted, IfAny (Het~MWe)2~~10. Reasons For Restrictions, If Angi ~~ i 1 ._I. This_ Month Y r _. - t_o D a t e C u_n u l.a t i.v e ______[ !!. Hours In Reporting Period __ _ _ _ __. 7 4 4 744 2L121 _ _. _ _ _ _. Os
- 12. Number Of Hours Reactor Was Critical 731.1 731.1 16029,3 j
- 13. Reacter Reserve Shutdown Hours 0,0 0,0 0.0
- 14. Hourr Genereter On-Line 674.7 674.7 15238,0 15.. Unit Reserve.5hutdswn hours.
0.0 0,0 _00 I
- 16. Cross Thermal Energy Generated (MWH) 1097142 1097142 32926766
___ 17 Cross Electrical Energy Generated (MWH) 342890 342890 1071.5400 _, 18. het Electrical Energy G e n e r a t e d _ ( M L' H )_ 3244a2 324492 10205017
- 19. Unit Service Factor 90.7 90.7 72.1 j
__20. Unit Rvailability Factor _90.7 90 7 72,1 i 2 l
- 21. Unit Capacitu Factor (Using__._ M D C _ H e t )
56.6 56.6 _62m7
- 22. Unit Cap 6cM y,Facter (Us.ng DER N et )
55.6 55.6 61.6 9.3 9.3 10,0 __ _ _.___.____..._ _ _ _..
- 23. Unit Forced Cutsge Rate 6, Month s ( Type,_Date, and Duration of Each):
l
- 24. Shutdowns Scheduled Over Next
- 25. It' Shut'Down At.End Of" Report Period,_Estinated_Date of Startup __
- l. ~'.
[_~ O l
- 26. Units In Test Status (Frior to Connercsal Operation):
Forecast Achieved INITIAL..CPITICALITV -... _ y' -,,u,o.. l IN!TIAL_EtECTRIC1TY .-2 2 n_.. COMMERCIAL CPERnTIDH .c n,...,_.-...- l -. _ _.. -.. _ _. O i k PI f.b. --.- -. -. - e e _ei.,_- ... +. ee-..m.- mali.ue .m .p ee. = g we_.N*m=e-*N e- ' ' ' " W"" 1
l l
- ,!I 0,O O
O Q Q O O Q O O O O G O o o 9_ 4 A- ] ~ ~ ~ ~ _ <- Z ~~ 1 ~ ~ + ~ ~ ~ 1 ~ 2 r e 1 ~ ~ w o P .a igr- ~ o ~ eG k A O 4r ? 9 a m. m u ta11 1 nnat 7 L ) 5 E 7 2 V 7 E / x L 9 ( l R E E 7 V) L7 Ut T; P e 71, 3 2_4 4 4 47,7872391 T7 H 5_4,T40951 ZE6 Y-01 8856 BH3 Li 6~ R I W ~44 5553 42 - 1 4 5 car AH L~ ~ ~ a k 3 1 - 2 D( ~ hn - K1 ~ n L 0 2A9 E E 3 0J( A~ G f V ~ - h x ~ E E . EYE R l I L 0TBH E~ A 7DDH A-C V~ 2 R 2 R u E T EP E W E TE (8, h O K EL M 01 2345 6 7 8_9 0 1 P C LE Y T A t1, 222222222233 ~ h D P. M T D. M. D E I O E N C_ f K U R Y ~~ E L [ E I L~ ~~ ~ ~ ~ E~ A t V ~ E r D ~- _ w a G E ~ R C ~' ~ T }_ 1 + z e ~ i A l i R E i E ~ ~ ~ W ~ z ~ E E R ~ L ) ~ s V ~ 0t ~ 9,9325690?894 T E. ~_ u A re l 4, 7 1 N 4 f Y - 56,3216004?3230 4 4 t 6$55555531 1 3 5 ~ e L e . TW ~. h d AM ~ ~ T( ~ E ~ 1 N_._ E 2 4 C ^ ~ 1 8 E E 1 V ~ 0 A n H T i N Y 1 2, 456789 u1 234 5 6 ~ O A l 1 1 1 1 1 1 M. D ~ ~ ~ [ Z m e ~ I l
HATCH 2. SAFETY-RELATED MAINTENANCE REQUESTS TO BE REPORTED FOR January 1981. e NUMBER-DATE COMPLETED DESCRIPTION 81-4533 11-z7-81 Replaced burned-up motor on valve with new motor as per DCR 81-199. 80-4976 05-28-81 Fabricated .and installed Unit 2 cable spread sprinkler system per SM-78-55-1B, SM-78-55-2B, and SM-78-55-3B. 81-731 04-09-81 Installed sprinkler system in HVAC Unit 2. This MR superseded MR 2-81-64. 81-3333 12-01-81 Installed 6000 ohms 25 watt field discharge resistor in MCC 2R24-S021 on terminal block F1 4 S2 per DCR 80-17. 5
T NARRATIVE REPORT UNIT 2 January 1st Reduced load due to 7A, 6B, 7B G
- B stage feed water-heaters out-of-service.
Reduced load also for rod pattern adjustment and weekly turbine test. January 3rd Dropped load to backwash and pre-coat condensate domin at 20:35 January 4th Dropped load to 72% thermal per management to conserve fuel at 16:25 January lith Reduced load to backwash resin traps and demins at 12:11 January 12th Dropped load to take condensate demin-out-of-service at 1:40 Reduced' load to remove heaters from service 4 alleviate high flow through condensate domin at 10:40 Reduced Rx power to 25% to repair heater leaks at 16:00 January 14th ~At 9:45 decreased power by rod insertion to 25% January 18th At 4:51 decreased Rx load to approx. 350 to find condensate tube leaks January 22nd Reduced load to 60% per management directive at 13:25 January 23rd Forced Rx scram at 20:41'due to low reactor water level January 24th Rx critical at 9:37 Generator tied to line at 18:10 i January 25th Reduced load to 60% per management directive January 26th At 12:0'9 generator off-line due to water leaking in the bus duct January 28th Generator tied to line at 11:58 4 The load is still reduced to 60% January 29th At 13:00 raised Rx power to perform TER on feedwater heater and to do weekly turbine test at 19:08 reduced load to 60% per management 2
I 50-366 DOCKET NO. UNIT SilUTDOWNS AND POWER REDUC 110NS r nz UNIT N AME d-4-D2 DATE 'Jan Arnette January COMPLETED !!Y 912-36/-/851 x-203 REPORT M0hTil 11ELEPil0NE = c _.*$3 Licensee [% Cause & Corrective
- 4g" jg Nii.
Date h 7; g 35e Event -D Action to 63 g Prevent Recurrence $E j g?, g Report # mu H g 3 82-1 1-1-82 F A' 5 NA CH-
- XXXXXXX, 7A',.6B, 78, & 8B Stg. - feedwate'r heaters out-o.f-servi ce I
82-2 1-1-82' S' B' 1 5 NA XX-XXX'XXXX Rod pattern adjustment 82-3 1-1-82 'S B 5
- l. N A' HA TURBIN..
Weekly turtiine test ~ 82-4 1-3-82 S B 'S. NA WC DEMINX' Backwash.&' pre-c' oat condensate demin
- s. -
' NA RC ZZZZZZZ Drop 1.oad to 72%, thermal per management 82-5 1-4'-82 S F 5 to conserve fuel i* 82-6 1-11-82 S B 5 NA WC DEMINX Backwash resin traps & condensate'demin ,f 1 82-7 1-12-82 F B 5 NA WC DEMINX Condensate demin'out-of-service 82-8 1-12-82 F B 5 NA CH XXXXXXX-Reduce load'to remove heaters- ~ 82-9 1-12-82 F B 5 NA CH XXXXXXX Repair heater leaks j, l ' I 2 3 4 F: Forced Reason: Method: Exhibit G. Instructions S: Scheduled A. Equipment Failure (Explain) 1 Manual for Preparation of Data B. Maintenance of Test ~ 2 Manual Scram. Entry Sheets for Licensee C Refucting 3 Automatic Scram. ' Event Report (LER) File (NUREG - 4 -Continuations 0161) D Regolatory Restriction E-Operatur Training & Ucense Examination . '. 5-Ioad accluction 5 F Administrative 9 Other'(Relain) G-Operational Error (Explain),. 4 Exhibla 1.Same Sourse . Ilother(Explain) - (9/77) l' j
- ^,e
l l ~ j t 50-366 DOCKET No. UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT N AME Hatch 2 DATE 2-4-82 January COMPLETED BY Jan Arnette REPORT M0hTil TELEP110NE 912-367-7951 v-203 e. E E ,E g } 3.{ } Licensee 5t Cause & Corrective o No. Date Eg I; Action to ge Event p gg Prevent Recurrence N din M jde Report # mu .g ~ 82-10 1-15-82 S F' S NA RG ZZZ'ZZZZJ Dr.op load,to-72% to conserve fuel', 82-11 1-18-82 F. B. 5 NA - WG HTEXCik Condensate tube leaks 82-12 1-18-82 S F 5, .N4 RC ZZ.ZZZZZ Drop load t'o 72% to conserve. fuel 82-13 1-22-82 S-F 'S ' NA - RC ZZZZZZZ. Reduce 'o&d to 60% per mngt. directive l 82-14 1-23-82 F A 3 NA CB' XXXXXXX Rx ' scrammed due to low rx. water. level 82-15 1-25-82 S' F' 5 NA ~ RC l. ZZZZZZZ Reduce loa.d.to 60% per'mngt, directive 82-16 1-26-82 F 47.8.j A 9 AA HTEXCH Generator off-line due to water in the ~ bus duct 82-17 1-28-82. F A 5 AA HTEXCH Startup fro'm scram 82-18 1-28,82 S F 5 RC' ZZZZZZZ Load reduction to 60% i ' I 2 .3 4 F: Forced Reason: Method: Exhibit G. Instructions I. Manual for Preparation of Data 5: Scheduled A Equipment Failure (Explain) D. Maintenance or Test ' 2. Manual Scram. Entry Sheets for Liernsee C.Refucibg
- 3. Automatic Scram.
Event Report (LER) File (NUREG - D.Regolaimy Restriction 4 -Continuations 0161) E. Operator Training & Ucense Examination 5-Icad Beduction 5 F. Administrative ..,. g g. (gg) Exhibit I.Same Sourse i l Goperatienst Error (Explain),. Ilother(Explain) ' (9/77) i: j
A 50-366 UNIT SilUIDOWNS ANb POWEli REDUCTIONS DOCKET NO. 7 C~cti 2 UNIT N AME Jankrnette COMPLETED BY nuary ~ REPORT MO. Til TELEP110NE 917-367-7951 v-203 A y i ra% g Licensee E,e " vl, Cause & Corrective s e ri g! )'sc0 Event ki AC8I"" 8" N.i. Date 3gc Report # mU Prevent Recurrence g a l 1 ~ 82-19 1-29-82 S B 5 CH HEATER' TER 'on feedwater heatsr i 82-20 1-29-82 S. B' '5 HA. TURBIN Weekly turbine test. l 1 82-2 1-29-82 S F 5 RC Z-Z.ZZZZZ Load. reduction to 60%- 1 l l l l
- t l
1 1 1 ) s' j I 2 3 4 Method: Exhibit G fr.structions F: Forced Reason: 5: Scheduled A l:iguipment Falture(Explain) 141anual for Preparation of Data B. Maintenance or Test ' 24f anual Scram. Entry Sheets for Licensce C. Refueling
- 3. Automatic Scram.
- Event Report (LER) Fife (NUREG-D.Regolatory Restriction 4 -Continuations 0161)
E-Operator Tr.alning & Ucense yxamination 5-r. cad Ibducdon 5 i F4dministra11ve 9gg.gg) .I G Operationa' Error ( Explain), Exhibil I.Same:ource (9/77) llother(Exp aln) ' c ~ i yr-t- .l-t l. .-_.}}