PM-82-021, Forwards Monthly Operating Rept for Dec 1981
Jump to navigation
Jump to search
| ML20039G948 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 01/08/1982 |
| From: | Manry M GEORGIA POWER CO. |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| Shared Package | |
| ML20039G949 | List: |
| References | |
| PM-82-021, PM-82-21, NUDOCS 8201190335 | |
| Download: ML20039G948 (1) | |
Text
e, e
Georgia Powtr Comptny Post office Box 439 Baxley, Georgia 31513 Telephone 912 367 7781 912 537-9444 Edwin I. Hatch Nuclear Plant January 8, 1982 PM-82-021 agg.
Y i' _f\\
PLANT E.
I. HATCH bi NRC Monthly Operating Report
]
jpj; 3,3 932, T_)l Director k'
.1" h Office of Inspection and Enforcement Q
M
' >g7%p',e United States Nuclear Regulatory Commission War.hington, D. C.
20555
Dear Sir:
Per Tech Specs section 6.9.1.6 please find attached the NRC Monthly Operating Report for Hatch Unit 1, Docket #50-321.
/
r Gu 5 c.e,(
[M. Manry s.
!/ Plant Manager CLC/hh i
f6
) l 8201190335 820108 PDR ADOCK 05000321 R
_ _ _