PM-81-102, Forwards Monthly Operating Rept for Nov 1981

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Nov 1981
ML20062M156
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 12/10/1981
From: Manry M
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20062M159 List:
References
PM-81-1023, NUDOCS 8112170089
Download: ML20062M156 (1)


Text

f Georgl.J Power company Post Office Box 439 Barley, Georgia 31513 Telephone 912 367-7781 912 537-9444 GeorgiaPower Edwin 1. Hatch Nuclear Plant December 10, 1981 PM-81-1023 PLANT E. I. HATCH NRC Ffontlly Operating Report Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission Washington, D. C. 20555

Dear Sir:

Per Tech Specs section 6.9.1.6 please find attached the NRC Monthly Operating Report for flatch Unit 1, Docket #50-321.

6/

M. Mant Plant Ma ager CLC/hh -

.it / ,,.(

'(

t au..rl[ifp/

DEC1 9

%a,m,,f

- -g1981&  :

?>

^/.,

! 41 \ W,\

ghN

.s l

8112170089 811210 PDR ADOCK 05000321 R PDR t