PM-80-662, Forwards Monthly Operating Repts for June 1980

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Repts for June 1980
ML19330A624
Person / Time
Site: Crane, Hatch  Constellation icon.png
Issue date: 07/10/1980
From: Manry M
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML19330A618 List:
References
PM-80-662, NUDOCS 8007280686
Download: ML19330A624 (1)


Text

Georgr? Power Cornpirrj Post Offics Box 442 Baxley. Georgtz S1513 Telephone 912 367 7781 912 537-9444 e

A Georgia Power Edwin 1. Hatch Nuclear Plant the scuttwn eminc system July 10, 1980 PM-80-662 PLANT E.

I.

HATCH NRC Monthly Operating Report Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission Washington, D.

C.

20555

Dear Sir:

Per Tech Specs section 6.9.1.6 please find attached the NRC Monthly Operating Report for Hatch Unit 2,

Docket #50-366.

M.

Manry Plant Manager CLC/pebe I

8007280 ((d

--