PM-80-592, Forwards Monthly Operating Rept for May 1980
Jump to navigation
Jump to search
| ML19318A132 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 06/10/1980 |
| From: | Manry M GEORGIA POWER CO. |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| Shared Package | |
| ML19318A133 | List: |
| References | |
| PM-80-592, NUDOCS 8006180494 | |
| Download: ML19318A132 (1) | |
Text
- _ _. _ _
Georgia Power Compt.ny Post Office Box 442 Baxley. Georgia 31513 Telephone 912367 7781 912 537-9444 Georgia Power Edwin 1. Hatch Nucteer Plant the southem electnc system June 10, 1980 PM-80-592 PLANT E.
I.
HATCH NRC Monthly Operating Report-Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission Washington, D.
C.
20555
Dear Sir:
Per Tech Specs section 6.9.1.6 please find attached the NRC Monthly Operating Report for Hatch Unit 2,
Docket #50-366.
[M ' //90 : ?d,)'
Mi. Manry y
Plant Manager CLC/pebe
[k
\\
8-e1.o y,