PM-80-387, Forwards Monthly Operating Rept for Mar 1980
| ML20126D040 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 04/10/1980 |
| From: | Manry M GEORGIA POWER CO. |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| PM-80-387, NUDOCS 8004150393 | |
| Download: ML20126D040 (1) | |
Text
, Georgia Power Comp?ny Post Offica Box 442 Baxley, Georgia 31513 Telephone 912 367 7781 912 537-9444 m
Georgia Power Edwin 1. Hatch Nuclear Plant Ine southem electnc system A o r i l.
10, 1990 o *4. A q. t R 7 PL A!1T E.
I.
HATrM
!!R C 'i n n t h 1. r G o e r'it i n o: Repeat 9iaOOtoa Office of Insnec ti nn a.n d Enfo"cenent f! n i t e d Statas
'1 u a l a a " 9agulsto-v Coa.9tn9 ton
a s h in c t o n,
D.
C.
?OA9" Saa
"?oh 10e01 9 action 6.0.'.#
O' ass?
- iad 9tt10had the
'! E C
a n t" 'ar S p e a a t i n :r lennat n a Umtch Unit O.
Do9et
/'*0 7,-
y,,,,,,,--
91 ant ' ' m n q <r a -
CLF/onhn xo:
'f. anav sr, q-9999 m
r.
'. '* n o a a p0 '
0 s
8 004 I 50 3h
' m..
~
s ry OPERATING DATA REPORT
~
DOCKET NO. _50-366 DATE 4-10-80 COMPLETED BY J. W. Roden TELEPHONE 912-3b/-//81 OPERATING STATUS a
- 1. Unit Name:
Hatch 2 Notes
- 2. Reporting Period:
March 80
- 3. Licensed Thermal Power (MWt):
2436 MWt
- 4. Nameplate Rating (Gross MWe): 817.0 Gross MWe
- 5. Design Electrical Rating (Net MWe):
784.0 Net MWe
- 6. Maximum Dependable Capacity (Gross MWe): 805.7 Gross MWo
- 7. Maximum Dependable Capacity (Net MWe):
772.7 Net MWe
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
- 9. Power Level To Which Restricted. lf Any (Net MWe):
- 10. Reasons For Restrictions.If Any:
/-
This Month Yr.-to Date Cumulative
- 11. Hours In Reporting Period 744 2184 5017
- 12. Number Of Hours Reactor Was Critical 12.6 1387.0 4050.4
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 14. Hours Generator On Line 3.0 1344.6 3759.1
- 15. Unit Resene Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1920 3062580 8556642
- 17. Gross Electrical Energy Generated (MWH) 6 30_ __ _ _.
1031980 2867940
- 18. Net Electrical Energy Generated (MWH)
-3211 985667 2742804
- 19. Unit Service Factor 0.4
- 20. Unit Availability Factor 0.4 _ _ _ _
61.6 74.9 61.6 74.9
- 21. Unit Capacity Factor (Using MDC Net)
-0.6 58.4 70.8
- 22. Unit Capacity Factor tUsing DER Net)
-0.6 57.6 69.7
- 23. Unit Forced Outage Rate 0.0 1.2 7.4
- 24. Shutdowns Scheduled Oier Next 6 Months (Type.Date.and Duration of Each):
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status IPrior to Commercial Operation):
Forecast Achiesed j
INITIA L CRITICALITY l
INITIA L ELECTRICITY COMMERCIAL OPER ATION pu p(e 4/77)
\\
3 _
06fb.
U 2 A _- _
r