PM-80-110, Forwards Monthly Operating Rept for Jan 1980
| ML19296B461 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 02/10/1980 |
| From: | Manry M GEORGIA POWER CO. |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| PM-80-110, NUDOCS 8002200601 | |
| Download: ML19296B461 (1) | |
Text
c,e..;2r
.s.
cc r f p.
.s..-
ea.., c. <; a m :
n.
e
,,,3 9 2 n~ < :.
n Georgia Power Edwin 4. Hatch Nuclear Plant February 10, 1980 PM-80 110 PLANT E. I. HATCH NRC Monthly Report Docket No. 50-321 Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sirs:
Pursuant to Section 6.4.1.6 of the Hatch Unit 1
Technical Specifications, please find attached the NRC Monthly Operating Report.
4}]rT4abry f7W J PlantManage(r MM/pebe xc:
R. F. Rogers C. T. Moore T. V. Greene File if 8002200 F
(
OPERATING DATA R EPORT DOCKET NO.
50-32 _
DATE 2-10-'
9N.1'i_
COMPLETED !!Y TELEPIIONE OPER ATING STATUS Notes
- 1. Unit Name: - -Hatch 1
- 2. Reportmg Period:
January 1980
- 3. Licensed Thermal Power (Mht):
2436 Ft4t
- 4. Nameplate Rating (Gross MWej.
800.3 Groe,s MWe i
- 5. Design Electrical Rating (Net MWe):
786.3 Net MWe 797. 3 Gross ht4e
- 6. Maximum Dependable Capacity (Gross MWe):
7 Maximum Dependable Capacity (Net Mbel:
764.3 Net Ftle S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
- 9. Power Lesel To which Restricted.lf Any (Net Mhe):
- 10. Reasons For Restrictions.If Any:
(
~
This Month Yr.-to-Date Cumulu r.,
744 744 3500^
- 11. rfours 1. Reporting Period 630.4 630.4 26433.t
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Resene Shutdown flours 0.0 0.0 n -
- 14. Ilours Generator On-Line 581.1 581.1 2483 -
- 15. Unit Resene Shutdown llours 0.0 0.0 C._
- 16. Gross Thermal Energy Generated (MWH) 1279160 1279160 51632195
- 17. Gross Electrical Energy Generated (MWil) 424930 424930 16695870 IS. Net Electrical Energy Generated (MWil) 405788 405788 1586772'.
- - ~ -- - 19. Unit senice Factor - - - - --
78.1 78.I ti. -
- 20. Unit Amilal/.!ity Factor 78.1 78.1 69 ~~
71.4 71.4 58
- 21. Unit Capacity Factor (Using MDC Net) 69.4 69.4 55.
- 22. Unit Capacity Factor (Using DER Net) 21.9 21.9 le. "
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oser Next 6 Months tType. Date.and Duration of Each):
- 25. If Shut Down At End Of Report Period. Estimated i
- 26. Units in Test Status ! Prior to Commercial Operatior:
INilIAL CRITICALITY DUPLICATE DOCUMENT INITI AL ELECTRICITY Entire document previously COmlERCI AL OPER ATION entered into system under:
~
h ANO 6
v.
g No. of a es: