PM-79-507, Forwards Monthly Operating Rept for May 1979
Jump to navigation
Jump to search
| ML19270G534 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 06/06/1979 |
| From: | Manry M GEORGIA POWER CO. |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| Shared Package | |
| ML19270G535 | List: |
| References | |
| PM-79-507, NUDOCS 7906130021 | |
| Download: ML19270G534 (1) | |
Text
Georg.a Power Company Post O't ce Box 442 Baxley, Gecrg's 31513 Telephone 912 367-6666 912 367 7781 b
Georgia Power Edwin 1. Hatch Nuclear Plant tre sacern etcx syste~
June 6, 1979 PM-79-507 PLANT E. I. HATCH NRC Monthly Report Docket No. 50-3%)
Office of Plan and Schedules Directorate of Licensing U.S. Nuclear Regulatory Com:nission Washington, D.C.
20545
Dear Sirs:
Pursuant to Section 6.9.1.6 of the Hatch Unit 1 Technical Specifications, please find attached the NRC Monthly Operating Report.
7-M: Manry j-Plant Manager 2327
- 29 xc:
C. T. Moore T. V. Greene File
//oof Stl 4
et 79061300N