PM-79-195, Forwards Annual Operating Rept for 1978
(Redirected from PM-79-195)
Jump to navigation
Jump to search
| ML19289D328 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 02/23/1979 |
| From: | Manry M GEORGIA POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML19289D329 | List: |
| References | |
| PM-79-195, NUDOCS 7903050336 | |
| Download: ML19289D328 (1) | |
Text
G,;< q 3 Pe a t.
C.c wny F
- i"mBc 4.:p f' ' ', G "C r _: 331E!3 Te. :N.u 912 367 7761
'i12 537-3.:44 4m Georgia Power Edwin 1. H::tch Nuclear Pbnt
,1 ?? r,
February 23, 1979 PM-79-195 Fr. Janes P. O'Reilly U.S. Nuclear Regulatory Conmission Office of Inspection & Fnforcement Region II, Suite 1217 230 Peachtree Street,-N.W.
Atlanta, Georgia 30303
Dear Fr. O'Reilly:
Pursuant to Section 6.9.1.b. and 4.6.F.1 of the Plant Edwin I. Hatch Operating License, and Section 6.9,1.5 of the Lhit 2 Operating License please find attached the interim tenual Operating Report for 1978.
' ya' r-17:o aik b (Fhnry lant Fhnag(er-}
M4/bw d0)
C 9(
\\
7903050 3 3 4 2